Tópicos Sugeridos dentro de su búsqueda.
https://purl.org/pe-repo/ocde/ford#2.11.04 35 https://purl.org/pe-repo/ocde/ford#2.01.00 28 https://purl.org/pe-repo/ocde/ford#2.01.01 27 https://purl.org/pe-repo/ocde/ford#2.00.00 19 Productividad 18 Lean Construction 17 Lean construction 11 más ...
Mostrando 1 - 20 Resultados de 123 Para Buscar 'lean construction processes', tiempo de consulta: 2.54s Limitar resultados
1
tesis de grado
The Peruvian construction sector, especially its SMEs, faces critical inefficiencies in supply chain management, particularly in procurement processes. Past research has shown that these inefficiencies lead to significant cost overruns and delays. This study addressed these challenges by implementing a procurement model integrating Lean Construction, Kaizen, and Just-In-Time (JIT). The main challenges identified were excess material purchases (20.12% of cost overruns) and late deliveries (25.84% of operations). The model reduced late deliveries from 25.84% to 8.95% and purchasing errors from 8.49% to 3.33%, confirming its effectiveness. The research has substantial academic and socio-economic implications for Peruvian SMEs, providing a solution that enhances efficiency and reduces operational costs. Further research should explore broader applications of this model and strategies to prom...
2
artículo
One of the biggest problems in the construction industry that often generates delays and loss of value in the construction site are the processes related to the management of material transportation. These processes are decisive in collaborating in the search for greater productivity. Lean Construction (LC), together with its tools and techniques, is a methodology that is being implemented in the sector and whose objective is the identification and elimination of waste on-site.The objective of this work is to analyze the impact of implementing the LC methodology in the construction sector focused on the transportation of materials, as well as to verify the other benefits of the methodology. In this systematic literature review (SLR) work, seven online databases were used to search for scientific manuscripts related to the LC methodology and the materials transportation process; after bei...
3
artículo
The article presents the results about processes related to project management, with the aim of proposing a methodology based on Lean Construction and the fundamentals of the PMBOK Guide; that allows to improve the productivity of construction projects. The methodology obtained from integrating the Last Planner Planning scenario, the planning process group, as well as the PMI scenario monitoring and control process group (Fundamentals of the PMBOK Guide); will optimize the factors that affect the planning and monitoring and control of construction projects by improving their productivity; reflected in the improvement of the quality, time and cost of the project. The optimization of the Sub-profile profiling process without material input generated great results (outputs) such as the reduction of the time (execution period) from 98 days to 68 days and the reduction of the cost of S/. 255,...
4
tesis de grado
El presente trabajo de investigación, tiene como objetivo, disminuir el tiempo de retraso en la entrega de obras de construcción. Cabe mencionar que estos retrasos ocasionan pérdidas y penalidades a la empresa e insatisfacción por parte del cliente. El estudio se basa en desarrollar un método de mejora integral a las áreas de calidad, planificación y procura. Para ello, se detalla la situación actual de la empresa, luego se establecen mejoras a tratar a partir de las causas de los problemas identificados y de esta manera obtener beneficios económicos para la empresa. Se inicia el trabajo de investigación desarrollando un marco teórico sobre la situación del rubro de construcción y las herramientas y metodologías a emplear, estos ayudarán a entender el contenido del informe. Posteriormente, se describe la situación actual de la empresa, cómo se encuentra organizada, sus u...
5
tesis de grado
La presente investigación, refiere una investigación de campo exploratoria, que tiene como objetivo desarrollar un plan de gestión para la optimización de procesos constructivos basados en principios Lean Construction en edificaciones con sistema constructivo de ductilidad limitada. Para lo anterior, se dará revisión a los documentos relativos a la productividad de una obra de ductilidad limitada de más de seis pisos ejecutada en la ciudad de Lima. Esta obra ya ha sido ejecutada y concluida, por lo cual se asume como un referente de la realidad percibida en este tipo de obras, basándose en datos reales que le confieren validez a la presente investigación, dichos datos son organizados y analizados con la finalidad de detectar la productividad y proponer las mejoras necesarias que sean aplicables a este tipo de obras. El problema general de optimización de los procesos constructi...
6
tesis de grado
La investigación aborda la problemática del proceso de compras de una empresa de construcción. Se identificó el problema de incumplimiento de plazo planeados para las compras y el incremento anual del costo del proceso de compras. Se emplearon herramientas de Lean Procurement para mejorar el plazo para las compras y reducir los costos anuales del proceso. La propuesta de mejora involucra la elaboración del Value Stream Map actual y futuro, así como también la medición de los tiempos y costos actuales versus la mejora implementada. Los resultados que se obtuvieron fueron la reducción del tiempo de compras en 22% y la reducción de costos en un 2%.
7
artículo
The construction sector in Peru is growing and is one of the most important, representing 19% of GDP. However, currently, in the construction industry, there is a high rate of non-contributory time, that is, the activities carried out during the construction process have a large percentage of time dedicated to activities that do not add value and lead to losses. This research attempts to reduce the high rate of non-contributory time (NCT) in building maintenance services in a Peruvian company in the construction sector. To achieve this, a conceptual model at the managerial level based on Lean tools such as Kanban, 5S, TPM was proposed.
8
tesis de grado
En esta investigación se desarrolla un modelo que integra herramientas de Lean Manufacturing y Recursos Humanos, tales como Just In Time, Total Productive Maintenence, Standard Work y One point Lesson, las cuales permitieron identificar la baja rentabilidad y productividad de una empresa mype en el sector de construcción. Gracias a la aplicación de este modelo se ha podido obtener un impacto favorable tanto cuantitativamente como cualitativamente a mediano y largo plazo. Al utilizar la herramienta JIT, se logró reducir los tiempos de entrega de los materiales en campo. Con la aplicación de la herramienta TPM se pudo lograr una mejora significativa en el desempeño de los equipos y una reducción en los tiempos de inactividad no planificados. La herramienta SW nos permitió crear un proceso estandarizado para el correcto uso de las máquinas y así reducir costos de reparación de ma...
9
tesis de grado
Una de las principales debilidades del sector construcción es el incumplimiento de plazos y sobrecostos debido durante la ejecución de obras, generalmente debido a la falta de seguimiento, un adecuado planeamiento de obra e inaplicación de herramientas de gestión de proyectos basadas en estándares internacionales. El Perú actualmente se encuentra en un estado de constante desarrollo, es por ello que es necesario promover la inversión masiva en obras de infraestructura con estándares de empresas constructoras que trabajan de manera continua en la mejora de su productividad, optimizar en el uso de los recursos, generar utilidades y así lograr que éstas sean motores del desarrollo económico. Actualmente existen una serie de técnicas y herramientas de planificación y control de obras que han ido evolucionando y perfeccionándose con el tiempo, cuya aplicación varía de acuerdo ...
10
tesis de grado
La presente tesis tiene como objetivo principal evaluar el proceso de producción de losas aligeradas bajo el enfoque de Lean Construction, en la Ciudad de Cajamarca año 2017. Para lo cual se analizaron 04 viviendas ubicadas en la ciudad, dentro de los trabajos ejecutados se analizó y describió de manera concisa cómo se aplican las herramientas importantes de esta Filosofía de Lean Construction, con la finalidad de obtener los resultados de Tiempo Productivo (de acá en adelante será TP), Tiempo Contributorio (de acá en adelante será TC) y Tiempo No Contributorio (de acá en adelante será TNC), la cual servirá para obtener la productividad de dicha cuadrilla y cuáles son las fallas que afectan a la partida de losas aligeradas; dentro de los métodos usados en el presente trabajo de investigación, se observó de manera directa durante 2.5 horas promedio para cada vivienda, reg...
11
artículo
The construction industry has long been suffering from high rates of non-contributory time. Construction processes are likely to include time, which is sometimes lost for non-value-adding operations resulting in time waste. Considering the large percentage of lost time in all operations, this study aims to reduce the high rate of non-contributory time (NCT) in construction services. To test the management model, a Peruvian company was selected as a study case. In this respect, a management model based on mostly implemented Lean tools such as Kanban, 5S, and TPM was utilized. It is of utmost importance to emphasize that this proposal aims to reduce the NCT by up to 25%, as well as reduce the number of orders generated with delay, and eventually reduce the loss or damage of materials and equipment stoppages.
12
objeto de conferencia
The Peruvian AEC industry has started implementing VDC and BIM in public projects due to recent regulations that state the progressive adoption of BIM (as a methodology) in public construction. Regardless of the benefits of these new approaches, some challenges to VDC implementation have emerged as a response to the resistance to change of the Peruvian AEC industry, which is stronger in the Peruvian public sector. The aim of this paper is to present the challenges found in the author´s VDC implementation experience in a public project, as part of the third VDC Certificate Program in Lima lead by CIFE from Stanford University. These challenges will be identified based on a schema, constructed by the literature review. The results show that the main challenges found are the lack of commitment and the lack of collaboration between stakeholders. These results suggest the need to overcome th...
13
tesis de grado
En el Perú, el sector construcción es uno de los factores más importantes que impulsan el desarrollo, la ejecución de obras coadyuva a mejorar la calidad de vida de la población y contribuye al mismo tiempo con la sostenibilidad del medio ambiente. En ese sentido, el sector construcción ha generado una alta competitividad en cuanto a costo, tiempo y calidad, analizando los factores que contribuyan a mejorar los procesos y estrategias aplicables a este campo; sin embargo se han presentado constantes incumplimientos debido principalmente a sobrecostos y retrasos originados por una inadecuada gestión durante la fase de pre inversión, elaboración de expediente técnico y posterior ejecución. Las causas de estos sobrecostos radican de los cambios en el alcance del proyecto, retrasos en la etapa de ejecución, estimación y ajustes errados de los costos e inexistencia de procesos de ...
14
tesis de grado
Este presente proyecto tiene como objetivo la aplicación de la filosofía Lean construction, en el proceso constructivo. Para una mejora de este, planificación de labores y una reducción de costos a lo largo de todo el proyecto. Se ha tomado como ejemplo una construcción de vivienda multifamiliar “residencial Las Flores” ubicado en la ciudad de Chiclayo, urb. Monterrico II Mz “E” Lt “24”. El cual se construyó sin tomar estas consideraciones. Este proyecto está dividido en diferentes capítulos. El primer capítulo se enfoca en la realidad problemática que pasan muchas construcciones las cuales construyen con métodos tradicionales; así mismo veremos cuál es nuestro problema, y la razón del porque queremos implementar esta filosofía, siendo la reducción de costos nuestro principal objetivo. En el segundo capítulo conceptualizaremos los principales factores intervi...
15
tesis de grado
En el presente Trabajo de Suficiencia Profesional se aplica las herramientas de Lean Manufacturing y Lean Construction con el fin de mejorar la baja productividad de una de las empresas contratistas (Contratista A) de la Concesionaria del sistema de distribución de redes de gas de Lima y Callao. Este trabajo se centró en la construcción de las redes de gas natural, en el cual se identificó las causas del problema formulándose dos objetivos: disminuir los trabajos de reprocesos y mejorar la calidad del producto. Con el logro de estos se incrementará la productividad y se reducirá los sobre costos generados por cada causa. En el primer capítulo se expone el estado actual de la organización a nivel internacional y nacional. Asimismo, se desarrolla el marco teórico en el cual se describe la metodología de Lean Manufacturing y Lean Contruction a implementarse. En el segundo capítu...
16
tesis de grado
En el contexto económico actual, la eficiencia en la ejecución de los proyectos de construcción es crucial, y la adopción de Lean Construction (LC) se destaca como una estrategia para maximizar el valor agregado al usuario final, reducir el desperdicio y optimizar el flujo de producción en los proyectos. La implementación de LC implica un viaje progresivo que requiere evaluaciones periódicas para verificar el progreso y abordar las debilidades. Sin embargo, la falta de consenso en la ruta de implementación de LC y la escasa disponibilidad de modelos y/o herramientas para evaluar la adopción de LC, son áreas de preocupación identificadas en la literatura. En este documento el autor de la presente tesis propone abordar la problemática mencionada, a partir de un estudio riguroso sobre el conocimiento existente de LC y sus buenas prácticas en el mundo. Para lograr dicho fin, est...
17
tesis de grado
La investigación de análisis y medición de la productividad de la mano de obra usando la herramienta Carta de Balance en la gestión Lean del Mall Aventura de la ciudad de Iquitos 2023, la productividad anteriormente y posteriormente se examinó en la metodología Lean Construction para establecer el rango en el efecto del uso. Se ha propuesto el uso de la herramienta Lean con el fin de cancelar los residuos en los artículos de acero y encofrado, mejorando la capacidad en los procesos de construcción que altera la productividad de la fuerza laboral y aumenta el porcentaje de trabajo productivo con el uso de formatos para medir los tiempos y verificar el progreso en las diferentes brigadas de trabajo. La metodología Lean como herramienta en la Carta de Balance, nos permite analizar la pérdida del recurso laboral con factores porcentuales de trabajo productivo, contributivo y no con...
18
objeto de conferencia
The Value Stream Mapping (VSM) as a management tool helps evaluate the waste within the workflow. However, it must be adapted to the construction since it was originated in manufacture. This adaptation is possible through appropriate process mapping. This study aims to map the process of the basement construction system in the execution of a building in Lima-Peru city. The building in the case study will have nine basements and 11-floor levels. An adaptation of the optimization cycle for construction projects was used. It allows mapping all the relevant activities and proposing and implementing improvements in the construction system. As a result, three maps were obtained. The first one is a map of the current state (VSM 1). The second one is a map of the current state with improvements (VSM 2). Finally, a third map of the future state with improvements (VSM 3). This study demonstrated t...
19
tesis de grado
La presente tesis parte de la necesidad común del ser humano del descanso y de como por medio de la ingeniería podemos beneficiar al usuario final a satisfacer dicha necesidad. En Perú, un gran porcentaje de personas opta por alquilar o comprar casas de playas pero lamentablemente hacer ello no se encuentra al alcance económico del ciudadano promedio, por tal motivo, la presente tesis cuenta con la hipótesis de que por medio de las herramientas Lean Construction podemos volver más eficientes a una empresa constructora (Suma Arquitectos) y así optimizar sus procesos para obtener menor desperdicios en costo y tiempo, e indirectamente beneficiar al usuario final con un producto de calidad a un menor precio. Por lo tanto, en la presente tesis se apreciará la aplicación de herramientas Lean Construction a la planificación, programación, ejecución y control de un proyecto de habili...
20
tesis de maestría
La presente investigación tuvo como objetivo general determinar la influencia de la Gestión de Productividad de la Filosofía Lean Construction en el proceso de relleno en la Presa “Palo Redondo”, en el distrito de Chao, provincia de Viru, región La Libertad, entre los meses de Agosto a Octubre del año 2015, según el objeto de estudio, el tipo de investigación fue Aplicada. Se inició la investigación conociendo la situación actual del proceso de relleno en la presa “Palo Redondo”, luego se implementó las herramientas de la Filosofía de Lean Construction, determinando las actividades que no generan valor. Se realizaron las recopilaciones de datos requeridos del frente de relleno mediante las cartas Balance, los reportes diarios de producción y de costos de la partida (proporcionado por la oficina de costos), por una semana y acompañamiento por 02 meses, después fue e...