Estudio de prefactibilidad para la instalación de una planta procesadora de bicicletas eléctricas
Descripción del Articulo
Currently, the world as a whole is focusing considerably on caring for the environment and, with this, people globally are opting for more "eco-friendly" options that allow them to develop all their activities, reconsidering with exponential trends in the passage of time all the products t...
| Autores: | , , , |
|---|---|
| Formato: | tesis de grado |
| Fecha de Publicación: | 2021 |
| Institución: | Universidad de Lima |
| Repositorio: | ULIMA-Institucional |
| Lenguaje: | español |
| OAI Identifier: | oai:repositorio.ulima.edu.pe:20.500.12724/13244 |
| Enlace del recurso: | https://hdl.handle.net/20.500.12724/13244 |
| Nivel de acceso: | acceso abierto |
| Materia: | Electric bikes Electric vehicle industry Feasibility studies Bicicletas eléctricas Industria de los vehículos eléctricos Estudios de factibilidad https://purl.org/pe-repo/ocde/ford#2.11.04 |
| Sumario: | Currently, the world as a whole is focusing considerably on caring for the environment and, with this, people globally are opting for more "eco-friendly" options that allow them to develop all their activities, reconsidering with exponential trends in the passage of time all the products they can make use of. With this, a study was developed for the implementation of bicycles equipped with an electric kit for urban metropolitan Lima and its subsequent commercialization in the market. For a more detailed study of the demand, the acquisition patterns of electric bicycles will be presented, the potential demand will be determined and based on historical production, export and import data, the demand that will be covered with the entry of the product to the market will be found. Simultaneously, the commercial product to be offered, the promotion for it, the price and the point of sale are determined. Also, the production of electric bicycles for each year of the project will be determined, limited at a minimum by the break-even point and at a maximum by the project demand estimated in the second chapter. In order to evaluate profitability, indicators such as NPV, IRR, Profit/Cost are determined and a sensitivity analysis is performed considering pessimistic and optimistic scenarios for the most influential variables. At the end of the study, conclusions are drawn based on the objectives set and the initial hypothesis is answered. |
|---|
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).