Estudio de prefactibilidad para la instalación de una planta de producción de agua de mesa alcalina ionizada
Descripción del Articulo
In order to determine the feasibility of the project, four relevant criteria were taken into account: market, location, technology and finance. Regarding the market, the demand that was calculated for the first year of the project was 1,261,753 bottles of 625 ml alkaline water (equivalent to 84,116...
| Autores: | , |
|---|---|
| Formato: | tesis de grado |
| Fecha de Publicación: | 2020 |
| Institución: | Universidad de Lima |
| Repositorio: | ULIMA-Institucional |
| Lenguaje: | español |
| OAI Identifier: | oai:repositorio.ulima.edu.pe:20.500.12724/11660 |
| Enlace del recurso: | https://hdl.handle.net/20.500.12724/11660 |
| Nivel de acceso: | acceso abierto |
| Materia: | Proyectos industriales Estudios de prefactibilidad Agua potable Ionización https://purl.org/pe-repo/ocde/ford#2.11.04 |
| id |
RULI_e8c5b397e409989e32dc2c0d7fffc646 |
|---|---|
| oai_identifier_str |
oai:repositorio.ulima.edu.pe:20.500.12724/11660 |
| network_acronym_str |
RULI |
| network_name_str |
ULIMA-Institucional |
| repository_id_str |
3883 |
| dc.title.es_PE.fl_str_mv |
Estudio de prefactibilidad para la instalación de una planta de producción de agua de mesa alcalina ionizada |
| title |
Estudio de prefactibilidad para la instalación de una planta de producción de agua de mesa alcalina ionizada |
| spellingShingle |
Estudio de prefactibilidad para la instalación de una planta de producción de agua de mesa alcalina ionizada Ascue Lazo, André Johai Proyectos industriales Estudios de prefactibilidad Agua potable Ionización https://purl.org/pe-repo/ocde/ford#2.11.04 |
| title_short |
Estudio de prefactibilidad para la instalación de una planta de producción de agua de mesa alcalina ionizada |
| title_full |
Estudio de prefactibilidad para la instalación de una planta de producción de agua de mesa alcalina ionizada |
| title_fullStr |
Estudio de prefactibilidad para la instalación de una planta de producción de agua de mesa alcalina ionizada |
| title_full_unstemmed |
Estudio de prefactibilidad para la instalación de una planta de producción de agua de mesa alcalina ionizada |
| title_sort |
Estudio de prefactibilidad para la instalación de una planta de producción de agua de mesa alcalina ionizada |
| author |
Ascue Lazo, André Johai |
| author_facet |
Ascue Lazo, André Johai Slocovich Martínez, Juan Manuel |
| author_role |
author |
| author2 |
Slocovich Martínez, Juan Manuel |
| author2_role |
author |
| dc.contributor.advisor.fl_str_mv |
Henrich Saavedra, Marco Antonio Pedro |
| dc.contributor.author.fl_str_mv |
Ascue Lazo, André Johai Slocovich Martínez, Juan Manuel |
| dc.subject.es_PE.fl_str_mv |
Proyectos industriales Estudios de prefactibilidad Agua potable Ionización |
| topic |
Proyectos industriales Estudios de prefactibilidad Agua potable Ionización https://purl.org/pe-repo/ocde/ford#2.11.04 |
| dc.subject.ocde.none.fl_str_mv |
https://purl.org/pe-repo/ocde/ford#2.11.04 |
| description |
In order to determine the feasibility of the project, four relevant criteria were taken into account: market, location, technology and finance. Regarding the market, the demand that was calculated for the first year of the project was 1,261,753 bottles of 625 ml alkaline water (equivalent to 84,116 packs of 15 bottles of 625 ml) at a unit price of S /. 1.60. This price is offered to wholesale distributors, who will then do their own management to sell the product to final consumers. The suggested retail price for the consumer is S / 2.00. For the location, several factors were taken into account in the selection such as availability of raw material, proximity to the target market, availability of workforce, availability of land and transport systems. After an exhaustive analysis for each factor, it was concluded that the most suitable place was Lurin. Regarding technology, there are no limitations for the present project, since both machinery and equipment belonging to the process can be acquired easily. On the other hand, the process that represents the main bottle neck is ionization, with a production capacity of 1,693,037 bottles per year. Finally, from the financial point of view, the total initial investment of the project is S/ 2,652,831.90 and is divided into 70% shareholder’s capital (S/ 1,856,982) and 30% bank financing (S/ 795,849). For this, the financing granted in the market of small and medium companies was investigated; and a loan was obtained with the Banco de Crédito del Perú with an annual effective rate of 15%. |
| publishDate |
2020 |
| dc.date.accessioned.none.fl_str_mv |
2020-10-16T19:26:22Z |
| dc.date.available.none.fl_str_mv |
2020-10-16T19:26:22Z |
| dc.date.issued.fl_str_mv |
2020 |
| dc.type.none.fl_str_mv |
info:eu-repo/semantics/bachelorThesis |
| dc.type.other.none.fl_str_mv |
Tesis |
| format |
bachelorThesis |
| dc.identifier.citation.es_PE.fl_str_mv |
Ascue Lazo, A. J. y Slocovich Martínez, J. M. (2020). Estudio de prefactibilidad para la instalación de una planta de producción de agua de mesa alcalina ionizada (tesis para optar el título profesional de Ingeniero Industrial). Universidad de Lima. |
| dc.identifier.uri.none.fl_str_mv |
https://hdl.handle.net/20.500.12724/11660 |
| dc.identifier.isni.none.fl_str_mv |
121541816 |
| identifier_str_mv |
Ascue Lazo, A. J. y Slocovich Martínez, J. M. (2020). Estudio de prefactibilidad para la instalación de una planta de producción de agua de mesa alcalina ionizada (tesis para optar el título profesional de Ingeniero Industrial). Universidad de Lima. 121541816 |
| url |
https://hdl.handle.net/20.500.12724/11660 |
| dc.language.iso.none.fl_str_mv |
spa |
| language |
spa |
| dc.relation.ispartof.fl_str_mv |
SUNEDU |
| dc.rights.*.fl_str_mv |
info:eu-repo/semantics/openAccess |
| dc.rights.uri.*.fl_str_mv |
https://creativecommons.org/licenses/by-nc-sa/4.0/ |
| eu_rights_str_mv |
openAccess |
| rights_invalid_str_mv |
https://creativecommons.org/licenses/by-nc-sa/4.0/ |
| dc.format.none.fl_str_mv |
application/pdf |
| dc.publisher.none.fl_str_mv |
Universidad de Lima |
| dc.publisher.country.none.fl_str_mv |
PE |
| publisher.none.fl_str_mv |
Universidad de Lima |
| dc.source.none.fl_str_mv |
Repositorio Institucional - Ulima Universidad de Lima reponame:ULIMA-Institucional instname:Universidad de Lima instacron:ULIMA |
| instname_str |
Universidad de Lima |
| instacron_str |
ULIMA |
| institution |
ULIMA |
| reponame_str |
ULIMA-Institucional |
| collection |
ULIMA-Institucional |
| bitstream.url.fl_str_mv |
https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11660/1/Ascue_Lazo_Andr%c3%a9_Johai.pdf https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11660/2/license_rdf https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11660/3/license.txt https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11660/4/Ascue_Lazo_Andr%c3%a9_Johai.pdf.txt https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11660/5/Ascue_Lazo_Andr%c3%a9_Johai.pdf.jpg |
| bitstream.checksum.fl_str_mv |
35abcbfc1628839a47e72c0d9a19a25d 8fc46f5e71650fd7adee84a69b9163c2 8a4605be74aa9ea9d79846c1fba20a33 535c5b5aec3fa341bb54ad8cab9d5269 d951b04092d31a4491c8a3d3bb3777f2 |
| bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 MD5 MD5 MD5 |
| repository.name.fl_str_mv |
Repositorio Universidad de Lima |
| repository.mail.fl_str_mv |
repositorio@ulima.edu.pe |
| _version_ |
1847245977419776000 |
| spelling |
Henrich Saavedra, Marco Antonio PedroAscue Lazo, André JohaiSlocovich Martínez, Juan Manuel2020-10-16T19:26:22Z2020-10-16T19:26:22Z2020Ascue Lazo, A. J. y Slocovich Martínez, J. M. (2020). Estudio de prefactibilidad para la instalación de una planta de producción de agua de mesa alcalina ionizada (tesis para optar el título profesional de Ingeniero Industrial). Universidad de Lima.https://hdl.handle.net/20.500.12724/11660121541816In order to determine the feasibility of the project, four relevant criteria were taken into account: market, location, technology and finance. Regarding the market, the demand that was calculated for the first year of the project was 1,261,753 bottles of 625 ml alkaline water (equivalent to 84,116 packs of 15 bottles of 625 ml) at a unit price of S /. 1.60. This price is offered to wholesale distributors, who will then do their own management to sell the product to final consumers. The suggested retail price for the consumer is S / 2.00. For the location, several factors were taken into account in the selection such as availability of raw material, proximity to the target market, availability of workforce, availability of land and transport systems. After an exhaustive analysis for each factor, it was concluded that the most suitable place was Lurin. Regarding technology, there are no limitations for the present project, since both machinery and equipment belonging to the process can be acquired easily. On the other hand, the process that represents the main bottle neck is ionization, with a production capacity of 1,693,037 bottles per year. Finally, from the financial point of view, the total initial investment of the project is S/ 2,652,831.90 and is divided into 70% shareholder’s capital (S/ 1,856,982) and 30% bank financing (S/ 795,849). For this, the financing granted in the market of small and medium companies was investigated; and a loan was obtained with the Banco de Crédito del Perú with an annual effective rate of 15%.Para poder determinar la viabilidad del proyecto, se tomaron en cuenta cuatro criterios relevantes: mercado, localización, tecnología y finanzas. En lo relacionado al mercado, la demanda que se calculó para el primer año del proyecto fue de 1,261,753 botellas de agua alcalina de 625 ml (equivalente a 84,116 packs de 15 botellas de 625 ml) a un precio unitario de S/ 1.60. Este precio se ofrece a los distribuidores mayoristas, que luego harán su propia gestión para vender el producto a los consumidores finales. El precio de venta sugerido para el consumidor es de S/ 2.00. Para la localización, se tomaron en cuenta varios factores en la selección como disponibilidad de materia prima, cercanía al mercado objetivo, disponibilidad de mano de obra, disponibilidad de terrenos y sistemas de transporte. Luego de realizar un análisis exhaustivo por cada factor, se llegó a concluir que el lugar más adecuado era Lurín. Existe la tecnología adecuada para llevar a cabo el proyecto, ya que tanto maquinaria como equipos que pertenecen al proceso pueden ser adquiridas con facilidad. Por otra parte, el proceso que representa el principal cuello de botella es el de ionización, con una capacidad de producción de 1,693,037 botellas por año. Finalmente, en lo referido al análisis de finanzas, la inversión inicial total del proyecto asciende a S/ 2,652,831.90 y la estructura es de 70% capital propio (S/ 1,856,982) y 30% financiamiento bancario (S/ 795,849). Para este, se investigó los financiamientos que se otorgan en el mercado empresarial; y se obtuvo un préstamo con el Banco de Crédito del Perú con una T.E.A de 15%.Tesisapplication/pdfspaUniversidad de LimaPEinfo:eu-repo/semantics/openAccesshttps://creativecommons.org/licenses/by-nc-sa/4.0/Repositorio Institucional - UlimaUniversidad de Limareponame:ULIMA-Institucionalinstname:Universidad de Limainstacron:ULIMAProyectos industrialesEstudios de prefactibilidadAgua potableIonizaciónhttps://purl.org/pe-repo/ocde/ford#2.11.04Estudio de prefactibilidad para la instalación de una planta de producción de agua de mesa alcalina ionizadainfo:eu-repo/semantics/bachelorThesisTesisSUNEDUTítulo ProfesionalIngeniería IndustrialUniversidad de Lima. Facultad de Ingeniería y ArquitecturaIngeniero Industrialhttps://orcid.org/0000-0002-0078-10257220267183468173590458https://purl.org/pe-repo/renati/level#tituloProfesionalCabrera Gil Grados, EzildaCollao Díaz, MartinSeminario García, Juan Carloshttps://purl.org/pe-repo/renati/type#tesisOIORIGINALAscue_Lazo_André_Johai.pdfAscue_Lazo_André_Johai.pdfapplication/pdf3532010https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11660/1/Ascue_Lazo_Andr%c3%a9_Johai.pdf35abcbfc1628839a47e72c0d9a19a25dMD51CC-LICENSElicense_rdflicense_rdfapplication/rdf+xml; charset=utf-81037https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11660/2/license_rdf8fc46f5e71650fd7adee84a69b9163c2MD52LICENSElicense.txtlicense.txttext/plain; charset=utf-81748https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11660/3/license.txt8a4605be74aa9ea9d79846c1fba20a33MD53TEXTAscue_Lazo_André_Johai.pdf.txtAscue_Lazo_André_Johai.pdf.txtExtracted texttext/plain307061https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11660/4/Ascue_Lazo_Andr%c3%a9_Johai.pdf.txt535c5b5aec3fa341bb54ad8cab9d5269MD54THUMBNAILAscue_Lazo_André_Johai.pdf.jpgAscue_Lazo_André_Johai.pdf.jpgGenerated Thumbnailimage/jpeg11012https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11660/5/Ascue_Lazo_Andr%c3%a9_Johai.pdf.jpgd951b04092d31a4491c8a3d3bb3777f2MD5520.500.12724/11660oai:repositorio.ulima.edu.pe:20.500.12724/116602025-09-17 13:54:55.867Repositorio Universidad de Limarepositorio@ulima.edu.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 |
| score |
13.121034 |
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).