Detection of interferences and incompatibilities in the design of building projects using BIM technologies

Descripción del Articulo

Nowkday the customers requires, complex edifications, it involves complex projects, with a wide variety of materials, installations, resources and procedures that requires the application of administration and planning of high performance, during the construction. Too, is necessary a constant and ef...

Descripción completa

Detalles Bibliográficos
Autores: Taboada, José, Alcántara, Vladimir, Lovera, Daniel, Santos, Ricardo, Diego, Jorge
Formato: artículo
Fecha de Publicación:2011
Institución:Universidad Nacional Mayor de San Marcos
Repositorio:Revistas - Universidad Nacional Mayor de San Marcos
Lenguaje:español
OAI Identifier:oai:ojs.csi.unmsm:article/672
Enlace del recurso:https://revistasinvestigacion.unmsm.edu.pe/index.php/iigeo/article/view/672
Nivel de acceso:acceso abierto
Materia:Building Information Modeling (BIM)
Detection of interferences
BIM technologies
Modelado de la Información de la Edificación
deteccion de interferencias
tecnologías BIM
Descripción
Sumario:Nowkday the customers requires, complex edifications, it involves complex projects, with a wide variety of materials, installations, resources and procedures that requires the application of administration and planning of high performance, during the construction. Too, is necessary a constant and efficient revision of compatibilities, and feedback in the design of the project, before to begin the construction phase. Frequently the project design phase is completed and the construction phase is begun with a not optimized design, this last involves mistakes, incompatibilities and clashes between the specialties of the engineering. So the responsibility of the final design accord to the normative construction, pass to the builder company, so is common develop solutions and redesigns during the construction phase, this last is a bad and very critical situation, and can affect negatively on hard terms and increases in costs if those mistakes are not detected on time using the correct ways. In this paper, we can see how the Building Information Modeling (BIM) can be used to optimize the designs and obtain early al Keywords: Incompatibilitles, Solutions, Bullding information Modelling, Clash, Detection.erts of incompatibilities and clashes before occurs during the construction phase.
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).