Detection of interferences and incompatibilities in the design of building projects using BIM technologies

Descripción del Articulo

Nowkday the customers requires, complex edifications, it involves complex projects, with a wide variety of materials, installations, resources and procedures that requires the application of administration and planning of high performance, during the construction. Too, is necessary a constant and ef...

Descripción completa

Detalles Bibliográficos
Autores: Taboada, José, Alcántara, Vladimir, Lovera, Daniel, Santos, Ricardo, Diego, Jorge
Formato: artículo
Fecha de Publicación:2011
Institución:Universidad Nacional Mayor de San Marcos
Repositorio:Revista UNMSM - IIGEO
Lenguaje:español
OAI Identifier:oai:ojs.csi.unmsm:article/672
Enlace del recurso:https://revistasinvestigacion.unmsm.edu.pe/index.php/iigeo/article/view/672
Nivel de acceso:acceso abierto
Materia:Building Information Modeling (BIM)
Detection of interferences
BIM technologies
Modelado de la Información de la Edificación
deteccion de interferencias
tecnologías BIM
id 1682-3087_7ff2dc28c68e6ab9ff4ed1e9933369da
oai_identifier_str oai:ojs.csi.unmsm:article/672
network_acronym_str 1682-3087
network_name_str Revista UNMSM - IIGEO
spelling Detection of interferences and incompatibilities in the design of building projects using BIM technologiesDetección de interferencias e incompatibilidades en el diseño de proyectos de edificaciones usando tecnologías BIMTaboada, JoséAlcántara, VladimirLovera, DanielSantos, RicardoDiego, JorgeBuilding Information Modeling (BIM)Detection of interferencesBIM technologiesModelado de la Información de la Edificacióndeteccion de interferenciastecnologías BIMNowkday the customers requires, complex edifications, it involves complex projects, with a wide variety of materials, installations, resources and procedures that requires the application of administration and planning of high performance, during the construction. Too, is necessary a constant and efficient revision of compatibilities, and feedback in the design of the project, before to begin the construction phase. Frequently the project design phase is completed and the construction phase is begun with a not optimized design, this last involves mistakes, incompatibilities and clashes between the specialties of the engineering. So the responsibility of the final design accord to the normative construction, pass to the builder company, so is common develop solutions and redesigns during the construction phase, this last is a bad and very critical situation, and can affect negatively on hard terms and increases in costs if those mistakes are not detected on time using the correct ways. In this paper, we can see how the Building Information Modeling (BIM) can be used to optimize the designs and obtain early al Keywords: Incompatibilitles, Solutions, Bullding information Modelling, Clash, Detection.erts of incompatibilities and clashes before occurs during the construction phase.La complejidad de los proyectos de edificaciones, requeridos por los clientes hoy en día, es cada vez mayor, con una gran variedad de instalaciones, materiales, insumos, y procedimientos que exigen la aplicación no solo de herramientas eficaces de gestión y planificación en la construcción, sino también de una adecuada revisión, compatibilización y realimentación del diseño del proyecto antes de llegar a la etapa de construcción. Sin embargo, muchas veces el diseño del proyecto pasa a la etapa de construcción con un diseño no optimizado y con interferencias entre especialidades, obligando a la constructora a asumir el liderazgo en revisar y rectificar el diseño, y lo que es más crítico es que esta revisión se da muchas veces en plena construcción del proyecto, lo cual podría incidir negativamente en los plazos y costos si estos errores no son detectados a tiempo utilizando las herramientas adecuadas. En este artículo veremos cómo el uso del Modelado de la Información de la Edificación (BIM), puede ser bien aprovechado para optimizar el diseño y alertar tempranamente la ocurrencia de incompatibilidades e interferencias antes de que éstas se presenten en campo en la etapa de construcción.Facultad de Ingeniería Geológica, Minera, Metalurgica y Geográfica2011-12-15info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://revistasinvestigacion.unmsm.edu.pe/index.php/iigeo/article/view/67210.15381/iigeo.v14i28.672Revista del Instituto de Investigación de la Facultad de Ingeniería Geológica, Minera, Metalúrgica y Geográfica; Vol 14 No 28 (2011)Revista del Instituto de Investigación de la Facultad de Ingeniería Geológica, Minera, Metalúrgica y Geográfica; Vol. 14 Núm. 28 (2011)1682-30871561-0888reponame:Revista UNMSM - IIGEOinstname:Universidad Nacional Mayor de San Marcosinstacron:UNMSMspahttps://revistasinvestigacion.unmsm.edu.pe/index.php/iigeo/article/view/672/526Derechos de autor 2011 José Taboada G., Vladimir Alcántara R., Daniel Lovera, Ricardo Santos, Jorge Diegohttp://creativecommons.org/licenses/by-nc-sa/4.0info:eu-repo/semantics/openAccess2020-07-14T18:25:19Zmail@mail.com -
dc.title.none.fl_str_mv Detection of interferences and incompatibilities in the design of building projects using BIM technologies
Detección de interferencias e incompatibilidades en el diseño de proyectos de edificaciones usando tecnologías BIM
title Detection of interferences and incompatibilities in the design of building projects using BIM technologies
spellingShingle Detection of interferences and incompatibilities in the design of building projects using BIM technologies
Taboada, José
Building Information Modeling (BIM)
Detection of interferences
BIM technologies
Modelado de la Información de la Edificación
deteccion de interferencias
tecnologías BIM
title_short Detection of interferences and incompatibilities in the design of building projects using BIM technologies
title_full Detection of interferences and incompatibilities in the design of building projects using BIM technologies
title_fullStr Detection of interferences and incompatibilities in the design of building projects using BIM technologies
title_full_unstemmed Detection of interferences and incompatibilities in the design of building projects using BIM technologies
title_sort Detection of interferences and incompatibilities in the design of building projects using BIM technologies
dc.creator.none.fl_str_mv Taboada, José
Alcántara, Vladimir
Lovera, Daniel
Santos, Ricardo
Diego, Jorge
author Taboada, José
author_facet Taboada, José
Alcántara, Vladimir
Lovera, Daniel
Santos, Ricardo
Diego, Jorge
author_role author
author2 Alcántara, Vladimir
Lovera, Daniel
Santos, Ricardo
Diego, Jorge
author2_role author
author
author
author
dc.subject.none.fl_str_mv Building Information Modeling (BIM)
Detection of interferences
BIM technologies
Modelado de la Información de la Edificación
deteccion de interferencias
tecnologías BIM
topic Building Information Modeling (BIM)
Detection of interferences
BIM technologies
Modelado de la Información de la Edificación
deteccion de interferencias
tecnologías BIM
dc.description.none.fl_txt_mv Nowkday the customers requires, complex edifications, it involves complex projects, with a wide variety of materials, installations, resources and procedures that requires the application of administration and planning of high performance, during the construction. Too, is necessary a constant and efficient revision of compatibilities, and feedback in the design of the project, before to begin the construction phase. Frequently the project design phase is completed and the construction phase is begun with a not optimized design, this last involves mistakes, incompatibilities and clashes between the specialties of the engineering. So the responsibility of the final design accord to the normative construction, pass to the builder company, so is common develop solutions and redesigns during the construction phase, this last is a bad and very critical situation, and can affect negatively on hard terms and increases in costs if those mistakes are not detected on time using the correct ways. In this paper, we can see how the Building Information Modeling (BIM) can be used to optimize the designs and obtain early al Keywords: Incompatibilitles, Solutions, Bullding information Modelling, Clash, Detection.erts of incompatibilities and clashes before occurs during the construction phase.
La complejidad de los proyectos de edificaciones, requeridos por los clientes hoy en día, es cada vez mayor, con una gran variedad de instalaciones, materiales, insumos, y procedimientos que exigen la aplicación no solo de herramientas eficaces de gestión y planificación en la construcción, sino también de una adecuada revisión, compatibilización y realimentación del diseño del proyecto antes de llegar a la etapa de construcción. Sin embargo, muchas veces el diseño del proyecto pasa a la etapa de construcción con un diseño no optimizado y con interferencias entre especialidades, obligando a la constructora a asumir el liderazgo en revisar y rectificar el diseño, y lo que es más crítico es que esta revisión se da muchas veces en plena construcción del proyecto, lo cual podría incidir negativamente en los plazos y costos si estos errores no son detectados a tiempo utilizando las herramientas adecuadas. En este artículo veremos cómo el uso del Modelado de la Información de la Edificación (BIM), puede ser bien aprovechado para optimizar el diseño y alertar tempranamente la ocurrencia de incompatibilidades e interferencias antes de que éstas se presenten en campo en la etapa de construcción.
description Nowkday the customers requires, complex edifications, it involves complex projects, with a wide variety of materials, installations, resources and procedures that requires the application of administration and planning of high performance, during the construction. Too, is necessary a constant and efficient revision of compatibilities, and feedback in the design of the project, before to begin the construction phase. Frequently the project design phase is completed and the construction phase is begun with a not optimized design, this last involves mistakes, incompatibilities and clashes between the specialties of the engineering. So the responsibility of the final design accord to the normative construction, pass to the builder company, so is common develop solutions and redesigns during the construction phase, this last is a bad and very critical situation, and can affect negatively on hard terms and increases in costs if those mistakes are not detected on time using the correct ways. In this paper, we can see how the Building Information Modeling (BIM) can be used to optimize the designs and obtain early al Keywords: Incompatibilitles, Solutions, Bullding information Modelling, Clash, Detection.erts of incompatibilities and clashes before occurs during the construction phase.
publishDate 2011
dc.date.none.fl_str_mv 2011-12-15
dc.type.none.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.none.fl_str_mv https://revistasinvestigacion.unmsm.edu.pe/index.php/iigeo/article/view/672
10.15381/iigeo.v14i28.672
url https://revistasinvestigacion.unmsm.edu.pe/index.php/iigeo/article/view/672
identifier_str_mv 10.15381/iigeo.v14i28.672
dc.language.none.fl_str_mv spa
language spa
dc.relation.none.fl_str_mv https://revistasinvestigacion.unmsm.edu.pe/index.php/iigeo/article/view/672/526
dc.rights.none.fl_str_mv Derechos de autor 2011 José Taboada G., Vladimir Alcántara R., Daniel Lovera, Ricardo Santos, Jorge Diego
http://creativecommons.org/licenses/by-nc-sa/4.0
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Derechos de autor 2011 José Taboada G., Vladimir Alcántara R., Daniel Lovera, Ricardo Santos, Jorge Diego
http://creativecommons.org/licenses/by-nc-sa/4.0
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Facultad de Ingeniería Geológica, Minera, Metalurgica y Geográfica
publisher.none.fl_str_mv Facultad de Ingeniería Geológica, Minera, Metalurgica y Geográfica
dc.source.none.fl_str_mv Revista del Instituto de Investigación de la Facultad de Ingeniería Geológica, Minera, Metalúrgica y Geográfica; Vol 14 No 28 (2011)
Revista del Instituto de Investigación de la Facultad de Ingeniería Geológica, Minera, Metalúrgica y Geográfica; Vol. 14 Núm. 28 (2011)
1682-3087
1561-0888
reponame:Revista UNMSM - IIGEO
instname:Universidad Nacional Mayor de San Marcos
instacron:UNMSM
reponame_str Revista UNMSM - IIGEO
collection Revista UNMSM - IIGEO
instname_str Universidad Nacional Mayor de San Marcos
instacron_str UNMSM
institution UNMSM
repository.name.fl_str_mv -
repository.mail.fl_str_mv mail@mail.com
_version_ 1684466178684092416
score 13.903862
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).