Mostrando 1 - 19 Resultados de 19 Para Buscar 'Raymundo-Ibañez, C.', tiempo de consulta: 0.35s Limitar resultados
1
artículo
This article addresses one of the main problems faced by small- and medium-sized business in the non-metallic mining sector in Peru. These companies own warehouses and face the major problem of failing to deliver orders correctly and in a timely manner. This problem usually occurs when the business grows from a small- to medium-sized company in a short span of time; this situation leads to new processes within warehouses that are mostly not standardized. Besides, facilities are no longer optimal in space and the workers are not properly trained. The case study shows that the orders were not delivered on time due to factors such as lack of product identification, although the products have an expiration date and a warehouse without signaling and surrounded by traffic. To tackle this situation, a labeling process has been designed for the products, an adequate distribution technique is use...
2
artículo
This investigation proposes a lean model of production management for a small and micro enterprise (SME) dealing in packaging production in the auto parts sector, with the purpose of increasing efficiency in its production line. To this end, this model integrates study method tools and SMED, seeking to reduce waiting times and unnecessary operations, which have been identified as causing the problem on the basis of an initial diagnosis of the situation. Furthermore, to support and guarantee success in implementing these tools, John Kotter's Change Model is used. After two months of implementation, the results showed a 50% reduction in setup operation time and a 32% decrease in filing operation time, which are bottlenecks in the production process. Thus, with the new indicators, the line efficiency increased by 7% from the initial situation, thus showing improvement.
3
artículo
Blasting is one of the most important stages in the productive process of a mine due to its direct impact on rock fragmentation, which determines the degree of productivity of operations and the extraction costs generated. In this scenario, an optimized methodology is presented for designing blasting meshes by using mathematical models that help calculate the geometric parameters of a blasting mesh, such as burden, considering the variables of the rock mass and the type of explosive to measure its impact on rock fragmentation and loading productivity (tons/hour). The main advantage of this method is the reliability of the design, which takes into account a greater number of variables that influence fragmentation and uses the principle of distribution and amount of energy in an optimal way. The results obtained in the case of application show that a change in design (2.7 x 2.7 square mesh...
4
artículo
This article proposes a production method that aims to increase the manufacturing capacity of a footwear small- and medium-sized enterprise (SME) to reduce backorders. Therefore, an assessment is carried out and delays in production processes, excess product transport time, defective products, and inefficient work methods are identified. This article proposes designing a Lean manufacturing method using the change management approach, whose methodology is composed of six phases. In phase 0, change management is carried out; in phase 1, the company's current situation is reviewed using the Value Stream Mapping (VSM); in phase 2, the work area is reorganized (implementing SLP and 5S); in phase 3, production is balanced (implementing Line Balancing); in phase 4, continual improvement is established using the Kaizen tool; and finally, in phase 5, the results are evaluated. Through validation,...
5
artículo
The purpose of this paper is to present a maintenance study focused on total productive maintenance (TPM) and reliability-centered maintenance (RCM). Its approach is based on the first pillars of TPM, preventive and autonomous maintenance, as well as the FMEA analysis of RCM for maintenance analysis, which was conducted in this study. The implementation of TPM was successful in that various preventive maintenance (PM) policies assigned to the assets were implemented and it was demonstrated that TPM application in the construction industry could reduce the excessive accumulation of maintenance with the same effective optimization, and with support from RCM analysis and its heavy equipment systems analysis. Excessive corrective maintenance accounts for high investment and delay rates in work times of the assigned project. Traditional methods of availability guarantee, such as reactive or r...
6
artículo
Today, many small and medium enterprises (SMEs) either go out of business or see their growth being stalled due to poor activity management and organization, which is why they are often unprepared to engage against large companies leading their competitive markets. This study aims to develop a comprehensive management model, exclusively designed for SMEs in the jewellery sector, which may encompass all areas that create value and make them competitive. The development of this comprehensive management model was deployed in 21 steps classified into three tiers based on three major philosophies. This study uses lean manufacturing to identify activities that add value and reduce waste, and lean green was used to provide the environmental care and culture approach required for a friendly and fair workplace environment. The selected scenario is a jewelry workshop, wherein techniques and tools ...
7
artículo
El texto completo de este trabajo no está disponible en el Repositorio Académico UPC por restricciones de la casa editorial donde ha sido publicado.
8
artículo
This paper proposes an optimization model aimed at increasing production capabilities at a small-sized textile business dedicated to manufacturing polo shirts, while reducing order fulfillment issues, including incomplete orders and late deliveries. Hence, an assessment identified downtimes from unnecessary transportation travel, time spent looking for materials, and excessive losses due to cutting fabric errors. In this light, the study focused on selecting adaptable tools, such as 5S, Plant Layout, and Method Study, which may help improve production capabilities and address these situations. However, to guarantee that the objectives set forth are being met, the organizational culture must also be identified and improved so that it may serve as the foundation for the optimization model. Then, the proposed model will be validated to determine whether the selected operating tools supporte...
9
artículo
Currently, there is a large percentage of small and medium-sized enterprises (SMEs) in the Peruvian textile market that show economic loss because of the payment of penalties to customers, which are incurred owing to the delay in the delivery of order batches. This is due to poor production management and a lack of focus. The manufacturing sector is essential because of its high contribution to the country's gross domestic product. Currently, SMEs do not employ methodologies that help improve production and process management as they do not realize how important and necessary the methodologies are, in addition to how complex these may be. Therefore, this paper will propose a production management model designed for SMEs in this sector, based on Lean methodology where the objective is time reductions and production increases as well as exerting changes to the organizational culture. Thus,...
10
artículo
This research study seeks to identify and prioritize the causes of order fulfillment delays in a small wooden furniture manufacturing company. The authors propose a 5-phase Lean Optimization model to address and reduce this problem. Post-implementation results yielded a 54.87% reduction in material search and transportation times, a 32.86% reduction in travel times between stations, and a 19.81% increase in line efficiency. In addition, order fulfillment percentages increased from 12.5% to 60%.
11
artículo
In recent years, the giant squid processing industry in Peru exhibited a 59% increase in exports with respect to 2018. According to estimates, this industry generates approximately 30,900 jobs per year. However, some SMEs experience low productivity, such as the PECEPE company, due to plant downtime. This represents 26% of the available time, which translates into the loss of 1760 tons every year. The most constraining external factor the sector faces is uncertainty in resource availability caused by changing weather conditions and informal fishing activities. Although there is a large number of research studies on the fishing industry and resource extraction, literature on processing plant operations is scarce. Within this context, this study seeks to promote a high impact sector in Peru, as well as fostering processing plant competitiveness and productivity. Hence, to address these iss...
12
artículo
For companies operating within the garment manufacturing industry, having frequent downtimes in their production flows is an extremely common issue. In this context, a balanced production line is required to prevent high waiting times due to limited productive capacity. A well-balanced assembly line allows products to be produced in an optimum time while using less resources, such as machines, materials, or labour, since the right number of products is produced with the exact amount of resources, thus generating savings in production costs. This paper seeks to foster optimum resource allocation through the line balancing tool. Finally, to define a work methodology, best practices were selected, and a procedures manual was developed focusing on Standardization. Both tools were implemented after implementing changes to the company culture by means of the Employee Empowerment tool. As a res...
13
artículo
Sales are central to retail companies. One of the main problems for these companies is when products are sold later than expected, causing overstock due to lower inventory turnover, which increases inventory levels. Therefore, for many retailers, it is important to solve this problem. This is mostly applicable to companies engaged in sales; however, if we take into account the main supplier and the way they act within the supply chain, we must also consider an additional approach. Since online sales are a major innovation brought about by the new digital era, it is standard for sales strategies to focus on this new requirement of customers. In this way, the main supplier takes a leap forward on Internet sales, creating another sales channel. This is when companies under the supply chain start losing sales. According to the above, a dual supply chain model was suggested using the SCOR mod...
14
artículo
Currently, small- and medium-sized enterprises face order fulfillment issues, thus generating reduced service levels. In addition, these companies are usually not aware of the importance of continuous improvement tools or of training staff as a mitigation strategy for this situation. Within this framework, the authors performed a literature review to compile production models through which downtimes could be reduced. The production model designed therefrom comprises Lean Manufacturing and work study tools within a Change Management approach. This design focuses on model implementation by small companies without requiring large investment, cutting-edge technology, or qualified personnel. Finally, an application case study was conducted in a small textile manufacturing company located at the Gamarra Fashion Center in Lima, Peru. The results that were reported revealed that late order fulfi...
15
artículo
Several factors compel graphic design companies to improve efficiency and competitiveness in their production lines. However, these companies are not prepared to take on this challenge, as they report delays in 20% of their deliveries, caused by high setup times, low machine availability, and poor work scheduling. In this context, this study proposes a new production management model fed by the interaction of lean manufacturing tools and the Johnson scheduling method. This model has been validated by direct application at the SISSA. The results obtained were the reduction of the setup time to 15 minutes, increased machine availability up to 24%, and an efficient scheduling of its tasks. All of these reduced the percentage of delivery delays from 20% to 6%.
16
artículo
This article examines the problem of production line delays in a textile small- and medium-sized enterprise (SME) that produces polyester fibre from recycled bottles, based on orders. Factors that have resulted in production line delays include prolonged unscheduled maintenance time, and preparations and adjustments prior to operating the equipment. To address the problem, a model was developed applying lean manufacturing tools through change management, with the aim of increasing equipment availability and useful life. To validate the model, a pilot was developed to determine how the increase in equipment availability helps reduce delays in the production line, which eventually improves completion of customer orders.
17
artículo
The focus of this research is to establish control and planning management in the sewing production process of lingerie clothing to better prepare companies for demand growth. The lack of improvement tools in this sector, the lack of staff training and a lack of quality culture has led to companies, especially MYPES, not being able to meet the established delivery times and non-fulfillment of orders with the customers, which represents 80% of dissatisfied orders due to the limited production capacity and non-productive time in the plant. This problem is due to limited production capacity, deficient production planning, and lack of materials. In order to solve this problem, industrial engineering tools were used. The application of these tools improved production from 79% to 95%.
19
artículo
This paper proposes a numerical finite-element-based model aimed at optimizing narrow-vein stope stability. This model combines empirical and numerical methods to develop a sequence, which may determine an acceptable stope safety factor. A stope stability analysis was conducted through the Mathews stability graph method, which requires two factors: the hydraulic radius (HR) and stability number (N'). The Mathews stability graph method is used to assess the stability of an underground design. Variations in stope dimensions are estimated by changing the HR and Factor A within the N', which is determined through numerical methods. The results of the numerical simulation indicate that the HR increases with an increase in stope dimensions, while Factor A maintains an inverse relationship with the maximum stress induced on the excavation walls. This document demonstrates the potential of combi...