Mostrando 1 - 1 Resultados de 1 Para Buscar 'Sosa-Perez, V.', tiempo de consulta: 0.52s Limitar resultados
1
artículo
For companies operating within the garment manufacturing industry, having frequent downtimes in their production flows is an extremely common issue. In this context, a balanced production line is required to prevent high waiting times due to limited productive capacity. A well-balanced assembly line allows products to be produced in an optimum time while using less resources, such as machines, materials, or labour, since the right number of products is produced with the exact amount of resources, thus generating savings in production costs. This paper seeks to foster optimum resource allocation through the line balancing tool. Finally, to define a work methodology, best practices were selected, and a procedures manual was developed focusing on Standardization. Both tools were implemented after implementing changes to the company culture by means of the Employee Empowerment tool. As a res...