Estudio de prefactibilidad para la instalación de una planta de producción de tejados de caucho

Descripción del Articulo

This paper objective is to highlight the opportunity to exploit rubber characteristics instead of been left in government deposits, the wheels rubbers will be reused to produce roof units The characteristics of this material will allow to transfer permeability , thermal isolation and flexibility to...

Descripción completa

Detalles Bibliográficos
Autor: Pacheco Oviedo, Cesar Andre
Formato: tesis de grado
Fecha de Publicación:2021
Institución:Universidad de Lima
Repositorio:ULIMA-Institucional
Lenguaje:español
OAI Identifier:oai:repositorio.ulima.edu.pe:20.500.12724/13314
Enlace del recurso:https://hdl.handle.net/20.500.12724/13314
Nivel de acceso:acceso abierto
Materia:Tile roofs
Rubber
Construction Industry
Feasibility studies
Cubiertas de teja
Caucho
Industria de la construcción
Estudios de factibilidad
https://purl.org/pe-repo/ocde/ford#2.11.04
id RULI_71aeed60940ae81e72943b9fa31b3dbd
oai_identifier_str oai:repositorio.ulima.edu.pe:20.500.12724/13314
network_acronym_str RULI
network_name_str ULIMA-Institucional
repository_id_str 3883
dc.title.es_PE.fl_str_mv Estudio de prefactibilidad para la instalación de una planta de producción de tejados de caucho
title Estudio de prefactibilidad para la instalación de una planta de producción de tejados de caucho
spellingShingle Estudio de prefactibilidad para la instalación de una planta de producción de tejados de caucho
Pacheco Oviedo, Cesar Andre
Tile roofs
Rubber
Construction Industry
Feasibility studies
Cubiertas de teja
Caucho
Industria de la construcción
Estudios de factibilidad
https://purl.org/pe-repo/ocde/ford#2.11.04
title_short Estudio de prefactibilidad para la instalación de una planta de producción de tejados de caucho
title_full Estudio de prefactibilidad para la instalación de una planta de producción de tejados de caucho
title_fullStr Estudio de prefactibilidad para la instalación de una planta de producción de tejados de caucho
title_full_unstemmed Estudio de prefactibilidad para la instalación de una planta de producción de tejados de caucho
title_sort Estudio de prefactibilidad para la instalación de una planta de producción de tejados de caucho
author Pacheco Oviedo, Cesar Andre
author_facet Pacheco Oviedo, Cesar Andre
author_role author
dc.contributor.advisor.fl_str_mv Ayala Chacaltana, Pedro Damián
dc.contributor.author.fl_str_mv Pacheco Oviedo, Cesar Andre
dc.subject.en_EN.fl_str_mv Tile roofs
Rubber
Construction Industry
Feasibility studies
topic Tile roofs
Rubber
Construction Industry
Feasibility studies
Cubiertas de teja
Caucho
Industria de la construcción
Estudios de factibilidad
https://purl.org/pe-repo/ocde/ford#2.11.04
dc.subject.es_PE.fl_str_mv Cubiertas de teja
Caucho
Industria de la construcción
Estudios de factibilidad
dc.subject.ocde.none.fl_str_mv https://purl.org/pe-repo/ocde/ford#2.11.04
description This paper objective is to highlight the opportunity to exploit rubber characteristics instead of been left in government deposits, the wheels rubbers will be reused to produce roof units The characteristics of this material will allow to transfer permeability , thermal isolation and flexibility to the produced roof units; these features will be of great use in rainy geographies or frequent hail regions The theoretical framework will detail the research tools used in the paper, the importance of the method used and the conclusions derived from it. There will be a comparison between different locations to build up a the rubber roof factory, these three prospects will be contrasted based on multiple factors. As a result, Lima was the one which presented better material availability, biggest demand and transportation facilities. Then, a market research determined the expected demand and therefore quantified the capacity required to produce enough product. To analyze the factory production capacity, the process was described, its technical specifications; the operators requirement; then a blocks diagram resumes the entire process. The final results stipulate a TIR of 101% and a VAN of S/. 4’945’079, based in these indicators it is correct to conclude that the proposed project is feasible. The investment required to purchase the machinery, rent a terrain in a industrial park in Chilca would be of S/. 2’609’986 and a working capital of S/.925’538
publishDate 2021
dc.date.accessioned.none.fl_str_mv 2021-05-30T21:33:45Z
dc.date.available.none.fl_str_mv 2021-05-30T21:33:45Z
dc.date.issued.fl_str_mv 2021
dc.type.none.fl_str_mv info:eu-repo/semantics/bachelorThesis
dc.type.other.none.fl_str_mv Trabajo de investigación
format bachelorThesis
dc.identifier.citation.es_PE.fl_str_mv Pacheco-Oviedo, C. A. (2021). Estudio de prefactibilidad para la instalación de una planta de producción de tejados de caucho [Trabajo de Investigación para optar el grado de Bachiller en Ingeniería Industrial, Universidad de Lima]. Repositorio Institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/13314
dc.identifier.uri.none.fl_str_mv https://hdl.handle.net/20.500.12724/13314
dc.identifier.isni.none.fl_str_mv 0000000121541816
identifier_str_mv Pacheco-Oviedo, C. A. (2021). Estudio de prefactibilidad para la instalación de una planta de producción de tejados de caucho [Trabajo de Investigación para optar el grado de Bachiller en Ingeniería Industrial, Universidad de Lima]. Repositorio Institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/13314
0000000121541816
url https://hdl.handle.net/20.500.12724/13314
dc.language.iso.none.fl_str_mv spa
language spa
dc.relation.ispartof.fl_str_mv SUNEDU
dc.rights.*.fl_str_mv info:eu-repo/semantics/openAccess
dc.rights.uri.*.fl_str_mv https://creativecommons.org/licenses/by-nc-sa/4.0/
eu_rights_str_mv openAccess
rights_invalid_str_mv https://creativecommons.org/licenses/by-nc-sa/4.0/
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidad de Lima
dc.publisher.country.none.fl_str_mv PE
publisher.none.fl_str_mv Universidad de Lima
dc.source.none.fl_str_mv Repositorio Institucional - Ulima
Universidad de Lima
reponame:ULIMA-Institucional
instname:Universidad de Lima
instacron:ULIMA
instname_str Universidad de Lima
instacron_str ULIMA
institution ULIMA
reponame_str ULIMA-Institucional
collection ULIMA-Institucional
bitstream.url.fl_str_mv https://repositorio.ulima.edu.pe/bitstream/20.500.12724/13314/4/Pacheco_Estudio-prefactibilidad-instalacion.pdf.txt
https://repositorio.ulima.edu.pe/bitstream/20.500.12724/13314/3/license.txt
https://repositorio.ulima.edu.pe/bitstream/20.500.12724/13314/1/Pacheco_Estudio-prefactibilidad-instalacion.pdf
https://repositorio.ulima.edu.pe/bitstream/20.500.12724/13314/2/license_rdf
https://repositorio.ulima.edu.pe/bitstream/20.500.12724/13314/5/Pacheco_Estudio-prefactibilidad-instalacion.pdf.jpg
bitstream.checksum.fl_str_mv b4b9bfba0a119f4ced6e8a81993734b4
8a4605be74aa9ea9d79846c1fba20a33
99816dd603e974e16f95c796ea7c9236
3655808e5dd46167956d6870b0f43800
580d77896f1098fcf738e6d1f99feaba
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
MD5
MD5
repository.name.fl_str_mv Repositorio Universidad de Lima
repository.mail.fl_str_mv repositorio@ulima.edu.pe
_version_ 1845977465710706688
spelling Ayala Chacaltana, Pedro DamiánPacheco Oviedo, Cesar Andre2021-05-30T21:33:45Z2021-05-30T21:33:45Z2021Pacheco-Oviedo, C. A. (2021). Estudio de prefactibilidad para la instalación de una planta de producción de tejados de caucho [Trabajo de Investigación para optar el grado de Bachiller en Ingeniería Industrial, Universidad de Lima]. Repositorio Institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/13314https://hdl.handle.net/20.500.12724/133140000000121541816This paper objective is to highlight the opportunity to exploit rubber characteristics instead of been left in government deposits, the wheels rubbers will be reused to produce roof units The characteristics of this material will allow to transfer permeability , thermal isolation and flexibility to the produced roof units; these features will be of great use in rainy geographies or frequent hail regions The theoretical framework will detail the research tools used in the paper, the importance of the method used and the conclusions derived from it. There will be a comparison between different locations to build up a the rubber roof factory, these three prospects will be contrasted based on multiple factors. As a result, Lima was the one which presented better material availability, biggest demand and transportation facilities. Then, a market research determined the expected demand and therefore quantified the capacity required to produce enough product. To analyze the factory production capacity, the process was described, its technical specifications; the operators requirement; then a blocks diagram resumes the entire process. The final results stipulate a TIR of 101% and a VAN of S/. 4’945’079, based in these indicators it is correct to conclude that the proposed project is feasible. The investment required to purchase the machinery, rent a terrain in a industrial park in Chilca would be of S/. 2’609’986 and a working capital of S/.925’538El presente trabajo nace de la iniciativa de aprovechar un material cómo el caucho ; que tarda 100 años en descomponerse; y reutilizarse para la producción de tejas. La naturaleza de este material aportará cualidades de permeabilidad, aislamiento térmico y flexibilidad a las tejas; características que pueden ser de utilidad en geografías que experimentan constantes lluvias, granizo o temperaturas bajas En el marco teórico se detallarán los alcances de las herramientas utilizadas a lo largo de la investigación, explicar la importancia de su uso y las conclusiones que se pueden obtener de estas Inicialmente se realizará una comparación entre los beneficios de implementar una planta de producción entre 3 posibles candidatos, siendo Lima la que representa mayores ventajas por la disponibilidad de material, mayor demanda y mejores medios para trasladar el material. Posteriormente, se realiza un estudio de mercado con el fin de encontrar el mercado objetivo dimensionar la demanda por el producto y realizar una proyección de ventas por los 5 años de vida útil del proyecto Luego, se analizará el tamaño de planta para identificar con cuál de los 5 tamaños es conveniente trabajar. A partir de esto, se realiza la ingeniería del proyecto describiendo el proceso de producción del producto, sus especificaciones técnicas, diagrama de bloques, capacidad de planta, requerimiento de operarios, etc. Los resultados finales del trabajo de investigación indican un valor de TIR de 101% y un VAN de S/ 4.945.079 en base a dichos indicadores se puede concluir que sería viable implementar una planta de producción de tejas de caucho. La inversión necesaria para llevar a cabo el proyecto consiste en la compra de maquinaria, alquiler de espacios en la zona industrial de Chilca resultando en un total de S/.2,609,985.25, además de un capital de trabajo de S/. 925,538.87.Trabajo de investigaciónapplication/pdfspaUniversidad de LimaPEinfo:eu-repo/semantics/openAccesshttps://creativecommons.org/licenses/by-nc-sa/4.0/Repositorio Institucional - UlimaUniversidad de Limareponame:ULIMA-Institucionalinstname:Universidad de Limainstacron:ULIMATile roofsRubberConstruction IndustryFeasibility studiesCubiertas de tejaCauchoIndustria de la construcciónEstudios de factibilidadhttps://purl.org/pe-repo/ocde/ford#2.11.04Estudio de prefactibilidad para la instalación de una planta de producción de tejados de cauchoinfo:eu-repo/semantics/bachelorThesisTrabajo de investigaciónSUNEDUBachillerIngeniería IndustrialUniversidad de Lima. Facultad de Ingeniería y ArquitecturaBachiller en Ingeniería Industrialhttps://orcid.org/0000-0003-1607-22632141171972202672419260https://purl.org/pe-repo/renati/level#bachillerVásquez Rivas Plata, RuthNoriega Aranibar, María TeresaCabrera Gil Grados, EzildaHernandez Gorritti, Wilfredohttps://purl.org/pe-repo/renati/type#trabajoDeInvestigacionOITEXTPacheco_Estudio-prefactibilidad-instalacion.pdf.txtPacheco_Estudio-prefactibilidad-instalacion.pdf.txtExtracted texttext/plain158277https://repositorio.ulima.edu.pe/bitstream/20.500.12724/13314/4/Pacheco_Estudio-prefactibilidad-instalacion.pdf.txtb4b9bfba0a119f4ced6e8a81993734b4MD54LICENSElicense.txtlicense.txttext/plain; charset=utf-81748https://repositorio.ulima.edu.pe/bitstream/20.500.12724/13314/3/license.txt8a4605be74aa9ea9d79846c1fba20a33MD53ORIGINALPacheco_Estudio-prefactibilidad-instalacion.pdfPacheco_Estudio-prefactibilidad-instalacion.pdfDescargarapplication/pdf2282546https://repositorio.ulima.edu.pe/bitstream/20.500.12724/13314/1/Pacheco_Estudio-prefactibilidad-instalacion.pdf99816dd603e974e16f95c796ea7c9236MD51CC-LICENSElicense_rdflicense_rdfapplication/rdf+xml; charset=utf-8811https://repositorio.ulima.edu.pe/bitstream/20.500.12724/13314/2/license_rdf3655808e5dd46167956d6870b0f43800MD52THUMBNAILPacheco_Estudio-prefactibilidad-instalacion.pdf.jpgPacheco_Estudio-prefactibilidad-instalacion.pdf.jpgGenerated Thumbnailimage/jpeg10415https://repositorio.ulima.edu.pe/bitstream/20.500.12724/13314/5/Pacheco_Estudio-prefactibilidad-instalacion.pdf.jpg580d77896f1098fcf738e6d1f99feabaMD5520.500.12724/13314oai:repositorio.ulima.edu.pe:20.500.12724/133142025-09-17 12:27:53.954Repositorio Universidad de Limarepositorio@ulima.edu.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
score 13.022113
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).