Lead time and productivity improvement in a pizza assembly process using lean manufacturing tools
Descripción del Articulo
The present work aims to improve the lead time and productivity in the pizza assembly process of a medium-sized company. To this end, lean manufacturing tools were used for implementing a work method that eliminates wastes or activities that add no value to the process. The results showed a reductio...
Autor: | |
---|---|
Formato: | artículo |
Fecha de Publicación: | 2020 |
Institución: | Universidad de Lima |
Repositorio: | Revistas - Universidad de Lima |
Lenguaje: | español |
OAI Identifier: | oai:revistas.ulima.edu.pe:article/4915 |
Enlace del recurso: | https://revistas.ulima.edu.pe/index.php/Ingenieria_industrial/article/view/4915 |
Nivel de acceso: | acceso abierto |
Materia: | lean manufacturing lead time productivity productividad |
id |
REVULIMA_251020681a3358cd690c245d26a8f032 |
---|---|
oai_identifier_str |
oai:revistas.ulima.edu.pe:article/4915 |
network_acronym_str |
REVULIMA |
network_name_str |
Revistas - Universidad de Lima |
repository_id_str |
|
spelling |
Lead time and productivity improvement in a pizza assembly process using lean manufacturing toolsMejora del lead time y productividad en el proceso Armado de pizzas aplicando herramientas de Lean ManufacturingEscudero, Bruce lean manufacturinglead timeproductivitylean manufacturinglead timeproductividadThe present work aims to improve the lead time and productivity in the pizza assembly process of a medium-sized company. To this end, lean manufacturing tools were used for implementing a work method that eliminates wastes or activities that add no value to the process. The results showed a reduction in the process lead time by 99% and an increase in the productivity of up to 20% compared to the initial situation. It was concluded that the tools used in the research, such as the line balancing graph, 5S or cellular manufacturing, allowed the elimination of wastes found during the process.El objetivo del presente trabajo es mejorar los niveles de lead time y productividad en el proceso armado de pizzas en una mediana empresa, utilizando herramientas de lean manufacturing para implementar un método de trabajo que elimine los desperdicios o actividades que no agregaban valor al proceso. Los resultados mostraron una reducción del lead time del proceso en 99 % y un incremento de la productividad hasta en 20 % respecto de la situación inicial. Se constató que las herramientas implementadas, como la gráfica de equilibrio, las 5S o la manufactura celular permitieron eliminar los desperdicios encontrados en el proceso.Universidad de Lima2020-12-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://revistas.ulima.edu.pe/index.php/Ingenieria_industrial/article/view/491510.26439/ing.ind2020.n039.4915Ingeniería Industrial; No. 039 (2020); 51-72Ingeniería Industrial; Núm. 039 (2020); 51-722523-63261025-992910.26439/ing.ind2020.n039reponame:Revistas - Universidad de Limainstname:Universidad de Limainstacron:ULIMAspahttps://revistas.ulima.edu.pe/index.php/Ingenieria_industrial/article/view/4915/4790https://creativecommons.org/licenses/by/4.0info:eu-repo/semantics/openAccessoai:revistas.ulima.edu.pe:article/49152023-07-21T20:50:48Z |
dc.title.none.fl_str_mv |
Lead time and productivity improvement in a pizza assembly process using lean manufacturing tools Mejora del lead time y productividad en el proceso Armado de pizzas aplicando herramientas de Lean Manufacturing |
title |
Lead time and productivity improvement in a pizza assembly process using lean manufacturing tools |
spellingShingle |
Lead time and productivity improvement in a pizza assembly process using lean manufacturing tools Escudero, Bruce lean manufacturing lead time productivity lean manufacturing lead time productividad |
title_short |
Lead time and productivity improvement in a pizza assembly process using lean manufacturing tools |
title_full |
Lead time and productivity improvement in a pizza assembly process using lean manufacturing tools |
title_fullStr |
Lead time and productivity improvement in a pizza assembly process using lean manufacturing tools |
title_full_unstemmed |
Lead time and productivity improvement in a pizza assembly process using lean manufacturing tools |
title_sort |
Lead time and productivity improvement in a pizza assembly process using lean manufacturing tools |
dc.creator.none.fl_str_mv |
Escudero, Bruce |
author |
Escudero, Bruce |
author_facet |
Escudero, Bruce |
author_role |
author |
dc.subject.none.fl_str_mv |
lean manufacturing lead time productivity lean manufacturing lead time productividad |
topic |
lean manufacturing lead time productivity lean manufacturing lead time productividad |
description |
The present work aims to improve the lead time and productivity in the pizza assembly process of a medium-sized company. To this end, lean manufacturing tools were used for implementing a work method that eliminates wastes or activities that add no value to the process. The results showed a reduction in the process lead time by 99% and an increase in the productivity of up to 20% compared to the initial situation. It was concluded that the tools used in the research, such as the line balancing graph, 5S or cellular manufacturing, allowed the elimination of wastes found during the process. |
publishDate |
2020 |
dc.date.none.fl_str_mv |
2020-12-01 |
dc.type.none.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.none.fl_str_mv |
https://revistas.ulima.edu.pe/index.php/Ingenieria_industrial/article/view/4915 10.26439/ing.ind2020.n039.4915 |
url |
https://revistas.ulima.edu.pe/index.php/Ingenieria_industrial/article/view/4915 |
identifier_str_mv |
10.26439/ing.ind2020.n039.4915 |
dc.language.none.fl_str_mv |
spa |
language |
spa |
dc.relation.none.fl_str_mv |
https://revistas.ulima.edu.pe/index.php/Ingenieria_industrial/article/view/4915/4790 |
dc.rights.none.fl_str_mv |
https://creativecommons.org/licenses/by/4.0 info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
https://creativecommons.org/licenses/by/4.0 |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
Universidad de Lima |
publisher.none.fl_str_mv |
Universidad de Lima |
dc.source.none.fl_str_mv |
Ingeniería Industrial; No. 039 (2020); 51-72 Ingeniería Industrial; Núm. 039 (2020); 51-72 2523-6326 1025-9929 10.26439/ing.ind2020.n039 reponame:Revistas - Universidad de Lima instname:Universidad de Lima instacron:ULIMA |
instname_str |
Universidad de Lima |
instacron_str |
ULIMA |
institution |
ULIMA |
reponame_str |
Revistas - Universidad de Lima |
collection |
Revistas - Universidad de Lima |
repository.name.fl_str_mv |
|
repository.mail.fl_str_mv |
|
_version_ |
1841719257611632640 |
score |
12.84232 |
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).