Tópicos Sugeridos dentro de su búsqueda.
Tópicos Sugeridos dentro de su búsqueda.
Buscar alternativas:
para construction » para construccion (Expander búsqueda), para reconstruccion (Expander búsqueda), para construcciones (Expander búsqueda)
projects* » project* (Expander búsqueda)
para construction » para construccion (Expander búsqueda), para reconstruccion (Expander búsqueda), para construcciones (Expander búsqueda)
projects* » project* (Expander búsqueda)
1
artículo
Publicado 2024
Enlace
Enlace
In the construction industry, productivity is sought to improve by innovating time management, a poor indicator in projects where activities are executed conventionally. In this sense, the research aims to evaluate the consequences of delays in projects and how to optimize time by incorporating the Lean Construction model. The procedure considers the review of bibliographic material, articles, construction magazines and projects that propose innovating time management with the Lean Construction model through the tools Last Planner System (LPS), productivity balance sheet, productive work (TP). , contributory work (TC), non-contributory work (TNC), percentage of parts completed (PPC) and application of the 5”s” tool. The results found that support the article correspond to the Barranco 360° project located in Lima that includes information on the productivity balance chart close to 8...
2
artículo
Publicado 2020
Enlace
Enlace
The article presents the results about processes related to project management, with the aim of proposing a methodology based on Lean Construction and the fundamentals of the PMBOK Guide; that allows to improve the productivity of construction projects. The methodology obtained from integrating the Last Planner Planning scenario, the planning process group, as well as the PMI scenario monitoring and control process group (Fundamentals of the PMBOK Guide); will optimize the factors that affect the planning and monitoring and control of construction projects by improving their productivity; reflected in the improvement of the quality, time and cost of the project. The optimization of the Sub-profile profiling process without material input generated great results (outputs) such as the reduction of the time (execution period) from 98 days to 68 days and the reduction of the cost of S/. 255,...
3
artículo
Publicado 2017
Enlace
Enlace
This article tries to analyze the main characteristics, strengths, opportunities and risks of the construction sector. This will review the internal and external factors that influence the decisions and results of companies included in this area. Regarding the general environment, a generic perspective of the data surrounding the industry will be reviewed, presenting the macroeconomic figures of the environment and the evolution of the sector. To obtain the results, a review of the main reports issued by specialized public and private institutions was carried out, as well as information from the main statistical series of the Central Reserve Bank of Peru. Among the main results, it was determined that construction has been positioned in recent years as a sector to boost the country’s economic growth and this will continue for at least the next three years due to the expansion of public...
4
artículo
Publicado 2017
Enlace
Enlace
This article tries to analyze the main characteristics, strengths, opportunities and risks of the construction sector. This will review the internal and external factors that influence the decisions and results of companies included in this area. Regarding the general environment, a generic perspective of the data surrounding the industry will be reviewed, presenting the macroeconomic figures of the environment and the evolution of the sector. To obtain the results, a review of the main reports issued by specialized public and private institutions was carried out, as well as information from the main statistical series of the Central Reserve Bank of Peru. Among the main results, it was determined that construction has been positioned in recent years as a sector to boost the country’s economic growth and this will continue for at least the next three years due to the expansion of public...
5
artículo
This article examines in particular which are the risks inherent in any construction project, and from them, explains the risk assignment method used in traditional construction contracts, noting that it does not adequately solve the allocation of risks and attribution of blame, making construction projects more expensive. In response to how to face these difficulties, this paper studied the collaborative contracts, their common elements, classes and the way in which risks are distributed, making a detailed analysis of the collaborative contract par excellence, that is, the alliancing or Integrated Project Delivery, to finish carrying out a particular examination of how risk assignment is treated in standardized international construction contractual models, such as FIDIC, NEC and FAC-1 contracts.
6
artículo
Publicado 2025
Enlace
Enlace
This article was developed with the purpose of generating new knowledge about the use of unmanned aerial vehicles (drones) in the identification of occupational risks in construction projects in Peru. This work seeks to demonstrate the importance of unmanned aerial vehicles in preventive management, generating privileged aerial information from various work areas in reduced time and producing added value in occupational risk management compared to traditional methods. The unmanned aerial vehicle generates valuable information that allows different work areas to be examined in real time and to promptly detect substandard acts and conditions that may affect workers. Currently in Peru, there is little information on the use of unmanned aerial vehicles in occupational risk management; Therefore, this study has revealed favorable results on the relationship that exists between the unmanned a...
7
artículo
Publicado 2020
Enlace
Enlace
In recent years, in Latin America, reference has been frequently made to “collaborative” contracts. However, there is no common understanding of what this term means and the relevant international discussion and development. This article seeks to establish the framework of the discussion on alternatives available to increase productivity in the construction industry and how this has led to seeing the contract as a useful tool to promote said process.
8
artículo
Publicado 2020
Enlace
Enlace
The objective of this study was to The Use of Multi-Criteria Decision Making to Introduce and Rank of Design Criteria of Reward in Construction Projects. In this research, the design criteria of rewards in construction projects are ranked. In the present study, in order to identify and rank the criteria of employee reward allocation the methods of Demetel and expansion of the performance of fuzzy quality in two steps were used. the results showed that the professional ethics is the most important criterion for reward allocation to the employees in the construction projects. Results show that considering the work environment of construction projects, maintaining discipline and having organizational commitment and helping others is very important. Also, having the spirit of teamwork and cooperation with others is very important for working in such environments. One of the notable points in...
9
artículo
Publicado 2020
Enlace
Enlace
The objective of this study was to The Use of Multi-Criteria Decision Making to Introduce and Rank of Design Criteria of Reward in Construction Projects. In this research, the design criteria of rewards in construction projects are ranked. In the present study, in order to identify and rank the criteria of employee reward allocation the methods of Demetel and expansion of the performance of fuzzy quality in two steps were used. the results showed that the professional ethics is the most important criterion for reward allocation to the employees in the construction projects. Results show that considering the work environment of construction projects, maintaining discipline and having organizational commitment and helping others is very important. Also, having the spirit of teamwork and cooperation with others is very important for working in such environments. One of the notable points in...
10
artículo
Publicado 2021
Enlace
Enlace
The evaluation of the occupational health and safety management systems was carried out to mitigate risks in construction projects in the Tacna region in a COVID-19 pandemic situation. For this purpose, the techniques for data collection used in the methodology; working on four construction projects in the Tacna region were the opinion of professionals in the construction sector, the analysis of documents and information on each project and the quantitative analysis of risk factors. Similarly, among the instruments used, there were forms, the projects’ technical sheets, statistical graphs, hazard identification and risk assessment matrices (IPER), the Jack Knife graph, and the basic guidelines check list of a system of occupational health and safety management. The results indicate that the occupational health and safety management system to mitigate risks was adequately implemented, o...
11
artículo
Publicado 2023
Enlace
Enlace
The purpose of this paper is to address a first approach to the execution of construction supervision contracts in public projects in Peru mains issues and challenges faced in the execution of construction supervision contracts, signed under Peruvian regulations for quality control and technical support in the contractual management of the construction of public works under the regime general and/or in the execution of concession contracts. Given the importance of these contracts in the development at the engineering or construction stage of an infrastructure investment project, their regulation, and the correct understanding of the nature of the provision of these specialized services is the central object of the present article. We briefly analyze the background of the figure of the “work supervisor” in Peruvian regulations, to identify its purpose and its scope in public work...
12
artículo
Publicado 2022
Enlace
Enlace
The research aims to determine that artificial intelligence is related to the management of public investment projects in Peru. This is demonstrated thanks to the study consisting of a literature review and the design of a survey, with a census sample. According to the results of the Spearman test, the described hypotheses are proved and as a contribution, an optimization model for project prioritization (MOPP) is proposed.
13
artículo
Publicado 2022
Enlace
Enlace
Esta investigación tiene como objetivo determinar que la inteligencia artificial se relaciona con la gestión de proyectos de inversión pública en el Perú. Esto se demuestra en la revisión de bibliografía y el diseño de una encuesta, con una muestra censal. Según los resultados de la prueba Spearman, se comprueban las hipótesis descritas. Finalmente, se propone como aporte un modelo de optimización para la priorización de proyectos (MOPP).
14
artículo
In the construction industry, there are several methodologies that allow estimating the costs of accidents, however, it is necessary to adapt to each country's regulatory reality to reach more accurate values, being able to adapt to the different production scenarios and to the different national realities. This paper presents an analysis of the impact of accident costs using methodology established by the Spanish prevention technical notes NTP 540, 273 Y 594, adjusting them to the Chilean regulations for the calculation of indirect costs of occupational accidents in companies of the construction sector. During 2017-2019, information was collected on the types of accidents occurred in construction sites, considering job position, injured body part, accident agent, values and costs of prevention management, in companies with construction projects of similar characteristics (construction o...
15
artículo
Publicado 2019
Enlace
Enlace
One of the most important aspects of construction projects are their variations. These are situations that generate a series of negative consequences for those involved and constitute the breeding ground for claims and controversies, are inevitable in the construction industry. In the present article we will analyze two fundamental questions about variations: their conceptual delimitation and its causes. In general terms, we believe that a better understanding of the phenomenon will allow providing adequate and coherent solutions to the problem. The importance of this article derives from the vacuum at the legislative, doctrinal and jurisprudential levels in Peru. In effect, the regulation of the work contract contained in the Civil Code does not devote an organic treatment to variations. However, certain provisions of the mentioned normative body (as well as others included in se...
16
artículo
Publicado 2022
Enlace
Enlace
The expansion of public works that began in the second half of the 19th century generated important economic, political, and cultural transformations in Peruvian society. It promoted the formation of a professional class made up of experts in planning, execution and administration of infrastructure projects and the exploitation of natural wealth. This article analyzes the professionalization of Engineering in Peru as part of a broader process that begins with the search for the State, with the collaboration of some sectors of civil society, to modernize the productive structures and form a capable ruling class. leading national modernization projects. In addition, the agency capacity of this professional sector to develop its own professionalization strategies aimed at legitimizing its discourse and its professional practice beyond the state sector is considered. Finally, it examines how...
17
artículo
In recent decades sandwich composites have taken a greater share in the construction industry, due to their low cost and properties that characterize these composites. Among the most important properties of these, the thermal conductivity stands out, which is directly linked to the individual's thermal comfort in a building. Currently, the Peruvian State has been developing projects in the fight against frost and cold, where one of the main interventions focuses on the construction of sustainable homes that can help the high Andean population cope with the inclement cold. In this sense, it is necessary to have construction materials appropriate for the climatic conditions of the place, and that is where lies the importance of this research. This paper proposes the study of thermal conductivity at temperature conditions close to 0 ºC of sandwich composites formed from monolithic material...
18
tesis de grado
Publicado 2018
Enlace
Enlace
Plantea un estudio preliminar para la instalación de una empresa de servicios de asesoramiento de proyectos de construcción de viviendas. El servicio comprende del estudio de terreno, levantamiento topográfico, gestión de licencias necesarias para la construcción, realización de planos, diseño de infraestructura, modelamiento en 3D y diseño de interiores. Este servicio está dirigido a personas naturales que buscan comenzar la construcción de sus viviendas, ya que muchas veces no cuentan con la asesoría necesaria para poder construir sus viviendas.
19
tesis de grado
Publicado 2024
Enlace
Enlace
En el contexto económico actual, la eficiencia en la ejecución de los proyectos de construcción es crucial, y la adopción de Lean Construction (LC) se destaca como una estrategia para maximizar el valor agregado al usuario final, reducir el desperdicio y optimizar el flujo de producción en los proyectos. La implementación de LC implica un viaje progresivo que requiere evaluaciones periódicas para verificar el progreso y abordar las debilidades. Sin embargo, la falta de consenso en la ruta de implementación de LC y la escasa disponibilidad de modelos y/o herramientas para evaluar la adopción de LC, son áreas de preocupación identificadas en la literatura. En este documento el autor de la presente tesis propone abordar la problemática mencionada, a partir de un estudio riguroso sobre el conocimiento existente de LC y sus buenas prácticas en el mundo. Para lograr dicho fin, est...
20
artículo
Publicado 2020
Enlace
Enlace
Essentially, the loss suffered by the global construction industry during the time when the COVID-19 is spread is not caused by that pandemic itself but caused by a changed circumstance which mainly resulted by anti-COVID-19 policy or law conducted by different jurisdictions. Where contract keeps silent in this regard, legal solution should be made by contemplating the law in different jurisdictions toward changed circumstances, which commonly includes situations where performance of contract become more onerous or impossible, and taking account of the factual environment which determines or impacts the changed circumstance. This paper, from a comparative law perspective, discusses and concludes the doctrine of changed circumstance in some typical jurisdictions, and, by taking consideration of law and fact, provides some approaches and potential legal solutions to deal with that loss.