Improvement of Quality Control in Retail-Type Works Through the Application of the BIM-LC Work Model
Descripción del Articulo
The essence of this research is the development of a working model in which two fundamental tools that control the quality of a finished product are brought together. In this case, the synergy is between the BIM methodology and the Lean Construction philosophy, which will be applied together to impr...
Autores: | , |
---|---|
Formato: | artículo |
Fecha de Publicación: | 2023 |
Institución: | Universidad Peruana de Ciencias Aplicadas |
Repositorio: | UPC-Institucional |
Lenguaje: | inglés |
OAI Identifier: | oai:repositorioacademico.upc.edu.pe:10757/668008 |
Enlace del recurso: | http://hdl.handle.net/10757/668008 |
Nivel de acceso: | acceso embargado |
Materia: | BIM Final product Lean construction QA Retail project Quality control BIM (Building Information Modeling) methodology Lean Construction philosophy Retail construction projec Customer dissatisfaction Poor quality control Procedure proposal Case studies Expert judgment validation Recommendations and improvements |
id |
UUPC_eba8a8c40e2872964488e1f6513b02b0 |
---|---|
oai_identifier_str |
oai:repositorioacademico.upc.edu.pe:10757/668008 |
network_acronym_str |
UUPC |
network_name_str |
UPC-Institucional |
repository_id_str |
2670 |
dc.title.es_PE.fl_str_mv |
Improvement of Quality Control in Retail-Type Works Through the Application of the BIM-LC Work Model |
title |
Improvement of Quality Control in Retail-Type Works Through the Application of the BIM-LC Work Model |
spellingShingle |
Improvement of Quality Control in Retail-Type Works Through the Application of the BIM-LC Work Model Fiorella, Jesús Robles Ana Victoria BIM Final product Lean construction QA Retail project Quality control BIM (Building Information Modeling) methodology Lean Construction philosophy Retail construction projec Customer dissatisfaction Poor quality control Procedure proposal Case studies Expert judgment validation Recommendations and improvements |
title_short |
Improvement of Quality Control in Retail-Type Works Through the Application of the BIM-LC Work Model |
title_full |
Improvement of Quality Control in Retail-Type Works Through the Application of the BIM-LC Work Model |
title_fullStr |
Improvement of Quality Control in Retail-Type Works Through the Application of the BIM-LC Work Model |
title_full_unstemmed |
Improvement of Quality Control in Retail-Type Works Through the Application of the BIM-LC Work Model |
title_sort |
Improvement of Quality Control in Retail-Type Works Through the Application of the BIM-LC Work Model |
author |
Fiorella, Jesús Robles Ana Victoria |
author_facet |
Fiorella, Jesús Robles Ana Victoria Enrique, Farje Mallqui Julio |
author_role |
author |
author2 |
Enrique, Farje Mallqui Julio |
author2_role |
author |
dc.contributor.author.fl_str_mv |
Fiorella, Jesús Robles Ana Victoria Enrique, Farje Mallqui Julio |
dc.subject.es_PE.fl_str_mv |
BIM Final product Lean construction QA Retail project Quality control BIM (Building Information Modeling) methodology Lean Construction philosophy Retail construction projec Customer dissatisfaction Poor quality control Procedure proposal Case studies Expert judgment validation Recommendations and improvements |
topic |
BIM Final product Lean construction QA Retail project Quality control BIM (Building Information Modeling) methodology Lean Construction philosophy Retail construction projec Customer dissatisfaction Poor quality control Procedure proposal Case studies Expert judgment validation Recommendations and improvements |
description |
The essence of this research is the development of a working model in which two fundamental tools that control the quality of a finished product are brought together. In this case, the synergy is between the BIM methodology and the Lean Construction philosophy, which will be applied together to improve the quality control of the finished product of a retail construction project. Retail projects which are large investment projects, for which the owners demand high quality in the final product. The work model proposed in this study aims to solve the problem of customer dissatisfaction or dissatisfaction with the final product of a retail construction project. The disagreement on the part of the end user is mainly due to poor quality control during all stages of the project. Based on academic articles and previous studies, a procedure will be proposed in which both the Lean Construction tools are applied, as well as the technology offered by the BIM methodology. Study cases, national and international projects in which this synergy has been applied will be studied and analyzed. Finally, the procedure will be validated by approval of an expert judgment; In other words, BIM managers, engineers, and architects with experience in the application of this synergy, will include their observations, proposals for improvement and recommendations that they contribute to the present investigation. |
publishDate |
2023 |
dc.date.accessioned.none.fl_str_mv |
2023-06-20T20:55:07Z |
dc.date.available.none.fl_str_mv |
2023-06-20T20:55:07Z |
dc.date.issued.fl_str_mv |
2023-01-01 |
dc.type.es_PE.fl_str_mv |
info:eu-repo/semantics/article |
format |
article |
dc.identifier.issn.none.fl_str_mv |
23662557 |
dc.identifier.doi.none.fl_str_mv |
10.1007/978-981-19-4293-8_68 |
dc.identifier.uri.none.fl_str_mv |
http://hdl.handle.net/10757/668008 |
dc.identifier.eissn.none.fl_str_mv |
23662565 |
dc.identifier.journal.es_PE.fl_str_mv |
Lecture Notes in Civil Engineering |
dc.identifier.eid.none.fl_str_mv |
2-s2.0-85135054506 |
dc.identifier.scopusid.none.fl_str_mv |
SCOPUS_ID:85135054506 |
dc.identifier.isni.none.fl_str_mv |
0000 0001 2196 144X |
identifier_str_mv |
23662557 10.1007/978-981-19-4293-8_68 23662565 Lecture Notes in Civil Engineering 2-s2.0-85135054506 SCOPUS_ID:85135054506 0000 0001 2196 144X |
url |
http://hdl.handle.net/10757/668008 |
dc.language.iso.es_PE.fl_str_mv |
eng |
language |
eng |
dc.relation.url.es_PE.fl_str_mv |
https://link.springer.com/chapter/10.1007/978-981-19-4293-8_68 |
dc.rights.es_PE.fl_str_mv |
info:eu-repo/semantics/embargoedAccess |
eu_rights_str_mv |
embargoedAccess |
dc.format.es_PE.fl_str_mv |
application/html |
dc.publisher.es_PE.fl_str_mv |
Springer Science and Business Media Deutschland GmbH |
dc.source.none.fl_str_mv |
reponame:UPC-Institucional instname:Universidad Peruana de Ciencias Aplicadas instacron:UPC |
instname_str |
Universidad Peruana de Ciencias Aplicadas |
instacron_str |
UPC |
institution |
UPC |
reponame_str |
UPC-Institucional |
collection |
UPC-Institucional |
dc.source.journaltitle.none.fl_str_mv |
Lecture Notes in Civil Engineering |
dc.source.volume.none.fl_str_mv |
279 LNCE |
dc.source.beginpage.none.fl_str_mv |
658 |
dc.source.endpage.none.fl_str_mv |
665 |
bitstream.url.fl_str_mv |
https://repositorioacademico.upc.edu.pe/bitstream/10757/668008/1/license.txt |
bitstream.checksum.fl_str_mv |
8a4605be74aa9ea9d79846c1fba20a33 |
bitstream.checksumAlgorithm.fl_str_mv |
MD5 |
repository.name.fl_str_mv |
Repositorio académico upc |
repository.mail.fl_str_mv |
upc@openrepository.com |
_version_ |
1837186779773403136 |
spelling |
d119dd8650c858700dc5d0e13a8517c4300cd7abedc68ec542c1fa05b1a1c8c9e60Fiorella, Jesús Robles Ana VictoriaEnrique, Farje Mallqui Julio2023-06-20T20:55:07Z2023-06-20T20:55:07Z2023-01-012366255710.1007/978-981-19-4293-8_68http://hdl.handle.net/10757/66800823662565Lecture Notes in Civil Engineering2-s2.0-85135054506SCOPUS_ID:851350545060000 0001 2196 144XThe essence of this research is the development of a working model in which two fundamental tools that control the quality of a finished product are brought together. In this case, the synergy is between the BIM methodology and the Lean Construction philosophy, which will be applied together to improve the quality control of the finished product of a retail construction project. Retail projects which are large investment projects, for which the owners demand high quality in the final product. The work model proposed in this study aims to solve the problem of customer dissatisfaction or dissatisfaction with the final product of a retail construction project. The disagreement on the part of the end user is mainly due to poor quality control during all stages of the project. Based on academic articles and previous studies, a procedure will be proposed in which both the Lean Construction tools are applied, as well as the technology offered by the BIM methodology. Study cases, national and international projects in which this synergy has been applied will be studied and analyzed. Finally, the procedure will be validated by approval of an expert judgment; In other words, BIM managers, engineers, and architects with experience in the application of this synergy, will include their observations, proposals for improvement and recommendations that they contribute to the present investigation.ODS 9: Industria, Innovación e InfraestructuraODS 11: Ciudades y Comunidades SosteniblesODS 12: Producción y Consumo Responsablesapplication/htmlengSpringer Science and Business Media Deutschland GmbHhttps://link.springer.com/chapter/10.1007/978-981-19-4293-8_68info:eu-repo/semantics/embargoedAccessBIMFinal productLean constructionQARetail projectQuality controlBIM (Building Information Modeling) methodologyLean Construction philosophyRetail construction projecCustomer dissatisfactionPoor quality controlProcedure proposalCase studiesExpert judgment validationRecommendations and improvementsImprovement of Quality Control in Retail-Type Works Through the Application of the BIM-LC Work Modelinfo:eu-repo/semantics/articleLecture Notes in Civil Engineering279 LNCE658665reponame:UPC-Institucionalinstname:Universidad Peruana de Ciencias Aplicadasinstacron:UPCLICENSElicense.txtlicense.txttext/plain; charset=utf-81748https://repositorioacademico.upc.edu.pe/bitstream/10757/668008/1/license.txt8a4605be74aa9ea9d79846c1fba20a33MD51false10757/668008oai:repositorioacademico.upc.edu.pe:10757/6680082024-07-27 18:08:17.69Repositorio académico upcupc@openrepository.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 |
score |
13.949927 |
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).