Economic improvement by reducing the execution time in a multifamily project applying Lean Construction and BIM 4D
Descripción del Articulo
In the projects of multi-family buildings executed by SMEs, the majority have been affected by considerable delays, which are mainly due to the lack of communication, coordination between the interested parties and deficient planning, lack of monitoring and control constant in work. For example, the...
Autores: | , , |
---|---|
Formato: | artículo |
Fecha de Publicación: | 2023 |
Institución: | Universidad Peruana de Ciencias Aplicadas |
Repositorio: | UPC-Institucional |
Lenguaje: | inglés |
OAI Identifier: | oai:repositorioacademico.upc.edu.pe:10757/673026 |
Enlace del recurso: | http://hdl.handle.net/10757/673026 |
Nivel de acceso: | acceso embargado |
Materia: | BIM buildings cost overruns delays Lean Construction SMEs |
Sumario: | In the projects of multi-family buildings executed by SMEs, the majority have been affected by considerable delays, which are mainly due to the lack of communication, coordination between the interested parties and deficient planning, lack of monitoring and control constant in work. For example, these causes can be unsolicited RFIs in the period of observations and delayed approvals, reprocessing of nonconformities, among others. Therefore, a guide was proposed to reduce execution times in multi-family projects executed by SMEs in which BIM 4D and Lean Construction are implemented. In this guide, 4 phases are explained in which BIM 4D and Lean Construction software and tools are applied to analyze interferences and restrictions, as well as optimize the workflow through optimal planning, which would allow avoiding and/or or mitigate delays. However, this guide would not only be reducing delays, but also cost overruns, so there would be an economic improvement apart from the temporary This is demonstrated by implementing the guide in a multifamily project, in which the cost overruns initially generated by delays were reduced by 70%. |
---|
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).