Estudio de tráfico del proyecto “Mejoramiento del puente Villena Rey y construcción del nuevo puente mellizo – distrito de Miraflores – Lima”
Descripción del Articulo
El Puente Villena Rey, ubicado en el distrito de Miraflores, es una infraestructura de gran importancia pues permite el intercambio vial con calles de gran jerarquía. El crecimiento poblacional, en conjunto con el del parque automotor ha ocasionado que la saturación vehicular de la zona se vuelva cr...
| Autores: | , |
|---|---|
| Formato: | tesis de grado |
| Fecha de Publicación: | 2017 |
| Institución: | Universidad Peruana de Ciencias Aplicadas |
| Repositorio: | UPC-Institucional |
| Lenguaje: | español |
| OAI Identifier: | oai:repositorioacademico.upc.edu.pe:10757/623189 |
| Enlace del recurso: | http://hdl.handle.net/10757/623189 |
| Nivel de acceso: | acceso abierto |
| Materia: | Puentes Análisis estructural Diseño estructural Ingeniería Civil Miraflores (Lima, Perú : Distrito) |
| id |
UUPC_99059f8f22f45f980653ffddbba34623 |
|---|---|
| oai_identifier_str |
oai:repositorioacademico.upc.edu.pe:10757/623189 |
| network_acronym_str |
UUPC |
| network_name_str |
UPC-Institucional |
| repository_id_str |
2670 |
| dc.title.es.fl_str_mv |
Estudio de tráfico del proyecto “Mejoramiento del puente Villena Rey y construcción del nuevo puente mellizo – distrito de Miraflores – Lima” |
| title |
Estudio de tráfico del proyecto “Mejoramiento del puente Villena Rey y construcción del nuevo puente mellizo – distrito de Miraflores – Lima” |
| spellingShingle |
Estudio de tráfico del proyecto “Mejoramiento del puente Villena Rey y construcción del nuevo puente mellizo – distrito de Miraflores – Lima” Linares Flores, Carlo Daniel Puentes Análisis estructural Diseño estructural Ingeniería Civil Miraflores (Lima, Perú : Distrito) |
| title_short |
Estudio de tráfico del proyecto “Mejoramiento del puente Villena Rey y construcción del nuevo puente mellizo – distrito de Miraflores – Lima” |
| title_full |
Estudio de tráfico del proyecto “Mejoramiento del puente Villena Rey y construcción del nuevo puente mellizo – distrito de Miraflores – Lima” |
| title_fullStr |
Estudio de tráfico del proyecto “Mejoramiento del puente Villena Rey y construcción del nuevo puente mellizo – distrito de Miraflores – Lima” |
| title_full_unstemmed |
Estudio de tráfico del proyecto “Mejoramiento del puente Villena Rey y construcción del nuevo puente mellizo – distrito de Miraflores – Lima” |
| title_sort |
Estudio de tráfico del proyecto “Mejoramiento del puente Villena Rey y construcción del nuevo puente mellizo – distrito de Miraflores – Lima” |
| author |
Linares Flores, Carlo Daniel |
| author_facet |
Linares Flores, Carlo Daniel Osores Tumbalobos, Daniela Sthefany |
| author_role |
author |
| author2 |
Osores Tumbalobos, Daniela Sthefany |
| author2_role |
author |
| dc.contributor.advisor.fl_str_mv |
Bravo Lizano, Aldo Rafael |
| dc.contributor.author.fl_str_mv |
Linares Flores, Carlo Daniel Osores Tumbalobos, Daniela Sthefany |
| dc.subject.es.fl_str_mv |
Puentes Análisis estructural Diseño estructural Ingeniería Civil Miraflores (Lima, Perú : Distrito) |
| topic |
Puentes Análisis estructural Diseño estructural Ingeniería Civil Miraflores (Lima, Perú : Distrito) |
| description |
El Puente Villena Rey, ubicado en el distrito de Miraflores, es una infraestructura de gran importancia pues permite el intercambio vial con calles de gran jerarquía. El crecimiento poblacional, en conjunto con el del parque automotor ha ocasionado que la saturación vehicular de la zona se vuelva crítica. A ello se suma la deficiente señalización, el estado del puente y los intercambios viales mal planteados. Esto se evidencia en las intersecciones de entrada y salida del puente. La Municipalidad de Miraflores, tomó la iniciativa y autorizó la construcción de un puente mellizo que permita un tránsito más fluido. Sin embargo, la presencia de mayores aumotóviles en las intersecciones tornaria el conflicto mas grave. Para solucionar este nuevo problema, se propondrá eliminar el ingreso de los autos provenientes de la Ca. Malecón Balta y de este modo derivar este flujo directamente a la Ca. Bolognesi estableciendo así un ingreso organizado y fluido al puente. A su vez, se propone una semaforización en la intersección entre las calles Jorge Chávez y Tripoli. Se respaldará esto mediante las metodologías del Highway Capacity Manual 2010 tanto para intersecciones semaforizadas como para intersecciones controladas por señales de pare. Realizado el levantamiento geométrico y el aforo vehicular de la zona, se determinó la hora pico desarrollada entre las 18:30 y 19:30 p.m.. Se emplearon los cálculos establecidos en la metodología y mediante los niveles de servicio se validó la viabilidad de la propuesta. Se consideraron 3 escenarios para cada intersección en evaluación: la situación actual, nuestra propuesta y la proyección de ésta. Se constató que los niveles de servicio actuales eran críticos y que la propuesta permitirá una notoria mejora en el tránsito vehicular. El paso de un nivel E a C y una reducción de 15 segundos en la demora de la intersección crítica hacen evidente los beneficios de la propuesta. Por otro lado, en la intersección con semaforización propuesta (Ca. Jorge Chávez – Ca. Trípoli) se dispuso longitudes de ciclo de acuerdo al nuevo afluente vehicular que originaría el proyecto, pasando así el nivel de servicio de A a B con colas mínimas. |
| publishDate |
2017 |
| dc.date.accessioned.none.fl_str_mv |
2018-04-12T17:05:03Z |
| dc.date.available.none.fl_str_mv |
2018-04-12T17:05:03Z |
| dc.date.issued.fl_str_mv |
2017-11-28 |
| dc.type.es.fl_str_mv |
info:eu-repo/semantics/bachelorThesis |
| dc.type.other.es_PE.fl_str_mv |
Tesis |
| dc.type.coar.es_PE.fl_str_mv |
http://purl.org/coar/resource_type/c_7a1f |
| format |
bachelorThesis |
| dc.identifier.citation.es_PE.fl_str_mv |
[1] M. Del and P. Villena, “Estudio de tráfico del proyecto ‘Mejoramiento del puente Villena Rey y construcción del nuevo puente mellizo – distrito de Miraflores – Lima,’” Universidad Peruana de Ciencias Aplicadas (UPC), Lima, Perú, 2017. |
| dc.identifier.uri.none.fl_str_mv |
http://hdl.handle.net/10757/623189 |
| identifier_str_mv |
[1] M. Del and P. Villena, “Estudio de tráfico del proyecto ‘Mejoramiento del puente Villena Rey y construcción del nuevo puente mellizo – distrito de Miraflores – Lima,’” Universidad Peruana de Ciencias Aplicadas (UPC), Lima, Perú, 2017. |
| url |
http://hdl.handle.net/10757/623189 |
| dc.language.iso.es_PE.fl_str_mv |
spa |
| language |
spa |
| dc.relation.ispartof.fl_str_mv |
SUNEDU |
| dc.rights.es_PE.fl_str_mv |
info:eu-repo/semantics/openAccess |
| dc.rights.uri.*.fl_str_mv |
http://creativecommons.org/licenses/by-nc/4.0/ |
| dc.rights.coar.es_PE.fl_str_mv |
http://purl.org/coar/access_right/c_abf2 |
| eu_rights_str_mv |
openAccess |
| rights_invalid_str_mv |
http://creativecommons.org/licenses/by-nc/4.0/ http://purl.org/coar/access_right/c_abf2 |
| dc.format.es.fl_str_mv |
application/pdf application/epub application/msword |
| dc.publisher.es.fl_str_mv |
Universidad Peruana de Ciencias Aplicadas (UPC) |
| dc.publisher.country.es_PE.fl_str_mv |
PE |
| dc.source.es_PE.fl_str_mv |
Universidad Peruana de Ciencias Aplicadas (UPC) Repositorio Académico - UPC |
| dc.source.none.fl_str_mv |
reponame:UPC-Institucional instname:Universidad Peruana de Ciencias Aplicadas instacron:UPC |
| instname_str |
Universidad Peruana de Ciencias Aplicadas |
| instacron_str |
UPC |
| institution |
UPC |
| reponame_str |
UPC-Institucional |
| collection |
UPC-Institucional |
| bitstream.url.fl_str_mv |
https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/1/license_url https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/2/license_text https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/3/license_rdf https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/4/license.txt https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/5/Linares_cd.pdf https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/6/Linares_cd.docx https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/7/Linares_cd_ficha.pdf https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/8/Linares_cd.pdf.txt https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/10/Linares_cd.docx.txt https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/11/Linares_cd_ficha.pdf.txt https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/13/Linares_cd.pdf.jpg https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/14/Linares_cd_ficha.pdf.jpg |
| bitstream.checksum.fl_str_mv |
486e70aa6e7b0271de4953c01c4283fd d41d8cd98f00b204e9800998ecf8427e d41d8cd98f00b204e9800998ecf8427e 248222b1f11c2ad8cb204366338ffb12 e83100a720f9f969f796fea705430c5c c7592b96c895851624f2ad73e89183b5 19fef624e46efe4a97526ee1fcabbb6c e530af330f96e423deae73e51b5c0ef5 ac9163e6a9e1001b3e4c47894a7c395b 0b0d40bea8482df673b8c25851e8b0d3 c18aa75b53bb91b01a0ca9cc23ea22d5 c802cdb3ca022cf4e08c869ad710ea23 |
| bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 |
| repository.name.fl_str_mv |
Repositorio académico upc |
| repository.mail.fl_str_mv |
upc@openrepository.com |
| _version_ |
1846065352876752896 |
| spelling |
87320b956eddaf5a8ce1841fddf162cchttp://orcid.org/0000-0003-4835-795XBravo Lizano, Aldo Rafaelf1d494e0aa73b9141bcdfa191aeaf27f500c9efd8dff3cb7ec0059c3430920b7114500Linares Flores, Carlo DanielOsores Tumbalobos, Daniela Sthefany2018-04-12T17:05:03Z2018-04-12T17:05:03Z2017-11-28[1] M. Del and P. Villena, “Estudio de tráfico del proyecto ‘Mejoramiento del puente Villena Rey y construcción del nuevo puente mellizo – distrito de Miraflores – Lima,’” Universidad Peruana de Ciencias Aplicadas (UPC), Lima, Perú, 2017.http://hdl.handle.net/10757/623189El Puente Villena Rey, ubicado en el distrito de Miraflores, es una infraestructura de gran importancia pues permite el intercambio vial con calles de gran jerarquía. El crecimiento poblacional, en conjunto con el del parque automotor ha ocasionado que la saturación vehicular de la zona se vuelva crítica. A ello se suma la deficiente señalización, el estado del puente y los intercambios viales mal planteados. Esto se evidencia en las intersecciones de entrada y salida del puente. La Municipalidad de Miraflores, tomó la iniciativa y autorizó la construcción de un puente mellizo que permita un tránsito más fluido. Sin embargo, la presencia de mayores aumotóviles en las intersecciones tornaria el conflicto mas grave. Para solucionar este nuevo problema, se propondrá eliminar el ingreso de los autos provenientes de la Ca. Malecón Balta y de este modo derivar este flujo directamente a la Ca. Bolognesi estableciendo así un ingreso organizado y fluido al puente. A su vez, se propone una semaforización en la intersección entre las calles Jorge Chávez y Tripoli. Se respaldará esto mediante las metodologías del Highway Capacity Manual 2010 tanto para intersecciones semaforizadas como para intersecciones controladas por señales de pare. Realizado el levantamiento geométrico y el aforo vehicular de la zona, se determinó la hora pico desarrollada entre las 18:30 y 19:30 p.m.. Se emplearon los cálculos establecidos en la metodología y mediante los niveles de servicio se validó la viabilidad de la propuesta. Se consideraron 3 escenarios para cada intersección en evaluación: la situación actual, nuestra propuesta y la proyección de ésta. Se constató que los niveles de servicio actuales eran críticos y que la propuesta permitirá una notoria mejora en el tránsito vehicular. El paso de un nivel E a C y una reducción de 15 segundos en la demora de la intersección crítica hacen evidente los beneficios de la propuesta. Por otro lado, en la intersección con semaforización propuesta (Ca. Jorge Chávez – Ca. Trípoli) se dispuso longitudes de ciclo de acuerdo al nuevo afluente vehicular que originaría el proyecto, pasando así el nivel de servicio de A a B con colas mínimas. The Villena Rey Bridge, located in the district of Miraflores, is an infrastructure of great importance because it allows road interchange with streets of great hierarchy. Population growth, together with the vehicle fleet, has caused the vehicular saturation of the area to become critical. To this must be added the deficient signage, the state of the bridge and the poorly planned road interchanges. This is evidenced in the intersections of entrance and exit of the bridge. The Municipality of Miraflores took the initiative and authorized the construction of a bridge that allows a more fluid transit. However, the presence of major vehicles in the intersections would turn the most serious conflict. To solve this new problem, it will be proposed to eliminate the entry of the cars from the Ca. Malecon Balta and in this way derived from this flow directly to the Ca. Bolognesi, thus establishing an organized and fluid entrance to the bridge. In turn, a traffic light is proposed at the intersection between Jorge Chavez and Tripoli streets. It relied on the 2010 Highway Capacity Manual methodologies for both signalized intersections and intersections controlled by stop signs. Once the geometric survey and the vehicular capacity of the area were carried out, the peak hour developed between 18:30 and 19:30 h was determined. The calculations established in the methodology and service levels were used, the viability of the proposal was validated. Three scenarios are considered for each intersection in evaluation: the current situation, our proposal and its projection. It was found that the current service levels were critical and that the proposal allowed a noticeable improvement in vehicular traffic. The passage from level E to B and a reduction of 15 seconds in the delay of the critical intersection make evident the benefits of the proposal. On the other hand, at the intersection with the proposed traffic lights (Ca. Jorge Chavez - Ca. Tripoli), cycle lengths were arranged according to the new vehicular tributary that would originate the project, as well as the service level from A to B with minimums of tails.Tesisapplication/pdfapplication/epubapplication/mswordspaUniversidad Peruana de Ciencias Aplicadas (UPC)PEinfo:eu-repo/semantics/openAccesshttp://creativecommons.org/licenses/by-nc/4.0/http://purl.org/coar/access_right/c_abf2Universidad Peruana de Ciencias Aplicadas (UPC)Repositorio Académico - UPCreponame:UPC-Institucionalinstname:Universidad Peruana de Ciencias Aplicadasinstacron:UPCPuentesAnálisis estructuralDiseño estructuralIngeniería CivilMiraflores (Lima, Perú : Distrito)Estudio de tráfico del proyecto “Mejoramiento del puente Villena Rey y construcción del nuevo puente mellizo – distrito de Miraflores – Lima”info:eu-repo/semantics/bachelorThesisTesishttp://purl.org/coar/resource_type/c_7a1fSUNEDUUniversidad Peruana de Ciencias Aplicadas (UPC). Facultad de ingenieríaLicenciaturaIngeniería CivilIngeniero Civil2018-06-16T15:53:22ZEl Puente Villena Rey, ubicado en el distrito de Miraflores, es una infraestructura de gran importancia pues permite el intercambio vial con calles de gran jerarquía. El crecimiento poblacional, en conjunto con el del parque automotor ha ocasionado que la saturación vehicular de la zona se vuelva crítica. A ello se suma la deficiente señalización, el estado del puente y los intercambios viales mal planteados. Esto se evidencia en las intersecciones de entrada y salida del puente. La Municipalidad de Miraflores, tomó la iniciativa y autorizó la construcción de un puente mellizo que permita un tránsito más fluido. Sin embargo, la presencia de mayores aumotóviles en las intersecciones tornaria el conflicto mas grave. Para solucionar este nuevo problema, se propondrá eliminar el ingreso de los autos provenientes de la Ca. Malecón Balta y de este modo derivar este flujo directamente a la Ca. Bolognesi estableciendo así un ingreso organizado y fluido al puente. A su vez, se propone una semaforización en la intersección entre las calles Jorge Chávez y Tripoli. Se respaldará esto mediante las metodologías del Highway Capacity Manual 2010 tanto para intersecciones semaforizadas como para intersecciones controladas por señales de pare. Realizado el levantamiento geométrico y el aforo vehicular de la zona, se determinó la hora pico desarrollada entre las 18:30 y 19:30 p.m.. Se emplearon los cálculos establecidos en la metodología y mediante los niveles de servicio se validó la viabilidad de la propuesta. Se consideraron 3 escenarios para cada intersección en evaluación: la situación actual, nuestra propuesta y la proyección de ésta. Se constató que los niveles de servicio actuales eran críticos y que la propuesta permitirá una notoria mejora en el tránsito vehicular. El paso de un nivel E a C y una reducción de 15 segundos en la demora de la intersección crítica hacen evidente los beneficios de la propuesta. Por otro lado, en la intersección con semaforización propuesta (Ca. Jorge Chávez – Ca. Trípoli) se dispuso longitudes de ciclo de acuerdo al nuevo afluente vehicular que originaría el proyecto, pasando así el nivel de servicio de A a B con colas mínimas. The Villena Rey Bridge, located in the district of Miraflores, is an infrastructure of great importance because it allows road interchange with streets of great hierarchy. Population growth, together with the vehicle fleet, has caused the vehicular saturation of the area to become critical. To this must be added the deficient signage, the state of the bridge and the poorly planned road interchanges. This is evidenced in the intersections of entrance and exit of the bridge. The Municipality of Miraflores took the initiative and authorized the construction of a bridge that allows a more fluid transit. However, the presence of major vehicles in the intersections would turn the most serious conflict. To solve this new problem, it will be proposed to eliminate the entry of the cars from the Ca. Malecon Balta and in this way derived from this flow directly to the Ca. Bolognesi, thus establishing an organized and fluid entrance to the bridge. In turn, a traffic light is proposed at the intersection between Jorge Chavez and Tripoli streets. It relied on the 2010 Highway Capacity Manual methodologies for both signalized intersections and intersections controlled by stop signs. Once the geometric survey and the vehicular capacity of the area were carried out, the peak hour developed between 18:30 and 19:30 h was determined. The calculations established in the methodology and service levels were used, the viability of the proposal was validated. Three scenarios are considered for each intersection in evaluation: the current situation, our proposal and its projection. It was found that the current service levels were critical and that the proposal allowed a noticeable improvement in vehicular traffic. The passage from level E to B and a reduction of 15 seconds in the delay of the critical intersection make evident the benefits of the proposal. On the other hand, at the intersection with the proposed traffic lights (Ca. Jorge Chavez - Ca. Tripoli), cycle lengths were arranged according to the new vehicular tributary that would originate the project, as well as the service level from A to B with minimums of tails.https://purl.org/pe-repo/renati/type#tesishttps://purl.org/pe-repo/renati/nivel#tituloProfesionalCC-LICENSElicense_urllicense_urltext/plain; charset=utf-846https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/1/license_url486e70aa6e7b0271de4953c01c4283fdMD51falselicense_textlicense_texttext/html; charset=utf-80https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/2/license_textd41d8cd98f00b204e9800998ecf8427eMD52falselicense_rdflicense_rdfapplication/rdf+xml; charset=utf-80https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/3/license_rdfd41d8cd98f00b204e9800998ecf8427eMD53falseLICENSElicense.txtlicense.txttext/plain; charset=utf-81745https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/4/license.txt248222b1f11c2ad8cb204366338ffb12MD54falseORIGINALLinares_cd.pdfLinares_cd.pdfapplication/pdf3819132https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/5/Linares_cd.pdfe83100a720f9f969f796fea705430c5cMD55true2087-11-28Linares_cd.docxLinares_cd.docxapplication/vnd.openxmlformats-officedocument.wordprocessingml.document9442656https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/6/Linares_cd.docxc7592b96c895851624f2ad73e89183b5MD56false2087-11-28Linares_cd_ficha.pdfLinares_cd_ficha.pdfapplication/pdf76861https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/7/Linares_cd_ficha.pdf19fef624e46efe4a97526ee1fcabbb6cMD57falseTEXTLinares_cd.pdf.txtLinares_cd.pdf.txtExtracted Texttext/plain164125https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/8/Linares_cd.pdf.txte530af330f96e423deae73e51b5c0ef5MD58false2087-11-28Linares_cd.docx.txtLinares_cd.docx.txtExtracted texttext/plain110643https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/10/Linares_cd.docx.txtac9163e6a9e1001b3e4c47894a7c395bMD510false2087-11-28Linares_cd_ficha.pdf.txtLinares_cd_ficha.pdf.txtExtracted Texttext/plain2https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/11/Linares_cd_ficha.pdf.txt0b0d40bea8482df673b8c25851e8b0d3MD511falseTHUMBNAILLinares_cd.pdf.jpgLinares_cd.pdf.jpgGenerated Thumbnailimage/jpeg58591https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/13/Linares_cd.pdf.jpgc18aa75b53bb91b01a0ca9cc23ea22d5MD513false2087-11-28Linares_cd_ficha.pdf.jpgLinares_cd_ficha.pdf.jpgGenerated Thumbnailimage/jpeg80540https://repositorioacademico.upc.edu.pe/bitstream/10757/623189/14/Linares_cd_ficha.pdf.jpgc802cdb3ca022cf4e08c869ad710ea23MD514falseCONVERTED2_357812910757/623189oai:repositorioacademico.upc.edu.pe:10757/6231892025-07-20 18:53:04.536Repositorio académico upcupc@openrepository.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 |
| score |
13.140231 |
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).