Optimization of Cost Analysis in School Construction: Risk Management.

Descripción del Articulo

This paper proposes to optimize the conventional cost analysis used by SMEs in school construction through qualitative analysis using Primavera Risk Analysis, Microsoft Excel, and Primavera P6. Several stages were carried out during the process: risk identification, identification of the most sensit...

Descripción completa

Detalles Bibliográficos
Autores: Andres, Wilder, Palmer, Erazo, Sebastian, Edgar, Sotelo, Alvarez, Janice, Katia, Vargas, Melendez
Formato: artículo
Fecha de Publicación:2023
Institución:Universidad Peruana de Ciencias Aplicadas
Repositorio:UPC-Institucional
Lenguaje:inglés
OAI Identifier:oai:repositorioacademico.upc.edu.pe:10757/673035
Enlace del recurso:http://hdl.handle.net/10757/673035
Nivel de acceso:acceso embargado
Materia:costs
Primavera Risk Analysis
reliability
risk management
sensitivity
SMEs
id UUPC_26a9006ef517f829ca030e527bc78a52
oai_identifier_str oai:repositorioacademico.upc.edu.pe:10757/673035
network_acronym_str UUPC
network_name_str UPC-Institucional
repository_id_str 2670
dc.title.es_PE.fl_str_mv Optimization of Cost Analysis in School Construction: Risk Management.
title Optimization of Cost Analysis in School Construction: Risk Management.
spellingShingle Optimization of Cost Analysis in School Construction: Risk Management.
Andres, Wilder
costs
Primavera Risk Analysis
reliability
risk management
sensitivity
SMEs
title_short Optimization of Cost Analysis in School Construction: Risk Management.
title_full Optimization of Cost Analysis in School Construction: Risk Management.
title_fullStr Optimization of Cost Analysis in School Construction: Risk Management.
title_full_unstemmed Optimization of Cost Analysis in School Construction: Risk Management.
title_sort Optimization of Cost Analysis in School Construction: Risk Management.
author Andres, Wilder
author_facet Andres, Wilder
Palmer, Erazo
Sebastian, Edgar
Sotelo, Alvarez
Janice, Katia
Vargas, Melendez
author_role author
author2 Palmer, Erazo
Sebastian, Edgar
Sotelo, Alvarez
Janice, Katia
Vargas, Melendez
author2_role author
author
author
author
author
dc.contributor.author.fl_str_mv Andres, Wilder
Palmer, Erazo
Sebastian, Edgar
Sotelo, Alvarez
Janice, Katia
Vargas, Melendez
dc.subject.es_PE.fl_str_mv costs
Primavera Risk Analysis
reliability
risk management
sensitivity
SMEs
topic costs
Primavera Risk Analysis
reliability
risk management
sensitivity
SMEs
description This paper proposes to optimize the conventional cost analysis used by SMEs in school construction through qualitative analysis using Primavera Risk Analysis, Microsoft Excel, and Primavera P6. Several stages were carried out during the process: risk identification, identification of the most sensitive and susceptible items to project changes, sensitivity analysis, criticality analysis, all represented in tornado, bar, and scatter plots. The proposed risk management plan yielded the following results: it increased the reliability of the project's completion date from 41% to 61% in the analysis, increased budget reliability from 29% to 45%, and reduced the number of sensitive items based on 1000 iterations.
publishDate 2023
dc.date.accessioned.none.fl_str_mv 2024-03-12T15:35:28Z
dc.date.available.none.fl_str_mv 2024-03-12T15:35:28Z
dc.date.issued.fl_str_mv 2023-01-01
dc.type.es_PE.fl_str_mv info:eu-repo/semantics/article
format article
dc.identifier.doi.none.fl_str_mv 10.1109/CONIITI61170.2023.10324219
dc.identifier.uri.none.fl_str_mv http://hdl.handle.net/10757/673035
dc.identifier.journal.es_PE.fl_str_mv 2023 9th International Conference on Innovation and Trends in Engineering, CONIITI 2023 - Proceedings
dc.identifier.eid.none.fl_str_mv 2-s2.0-85179548588
dc.identifier.scopusid.none.fl_str_mv SCOPUS_ID:85179548588
dc.identifier.isni.none.fl_str_mv 0000 0001 2196 144X
identifier_str_mv 10.1109/CONIITI61170.2023.10324219
2023 9th International Conference on Innovation and Trends in Engineering, CONIITI 2023 - Proceedings
2-s2.0-85179548588
SCOPUS_ID:85179548588
0000 0001 2196 144X
url http://hdl.handle.net/10757/673035
dc.language.iso.es_PE.fl_str_mv eng
language eng
dc.rights.es_PE.fl_str_mv info:eu-repo/semantics/embargoedAccess
eu_rights_str_mv embargoedAccess
dc.format.es_PE.fl_str_mv application/html
dc.publisher.es_PE.fl_str_mv Institute of Electrical and Electronics Engineers Inc.
dc.source.none.fl_str_mv reponame:UPC-Institucional
instname:Universidad Peruana de Ciencias Aplicadas
instacron:UPC
instname_str Universidad Peruana de Ciencias Aplicadas
instacron_str UPC
institution UPC
reponame_str UPC-Institucional
collection UPC-Institucional
dc.source.journaltitle.none.fl_str_mv 2023 9th International Conference on Innovation and Trends in Engineering, CONIITI 2023 - Proceedings
bitstream.url.fl_str_mv https://repositorioacademico.upc.edu.pe/bitstream/10757/673035/1/license.txt
bitstream.checksum.fl_str_mv 8a4605be74aa9ea9d79846c1fba20a33
bitstream.checksumAlgorithm.fl_str_mv MD5
repository.name.fl_str_mv Repositorio académico upc
repository.mail.fl_str_mv upc@openrepository.com
_version_ 1845545826291548160
spelling 14901de2a786324a187654ee4c403761300ccd9dc81c85c01e5b5b7543ccd70a112300422afab028fc3def86b655d8905f871a300a700fb40548156b2f59c72f65bf4bdb7300c3aeb4214637b70a9c6132aae363835cee186ddcc9e001ceb0edc681b9021461Andres, WilderPalmer, ErazoSebastian, EdgarSotelo, AlvarezJanice, KatiaVargas, Melendez2024-03-12T15:35:28Z2024-03-12T15:35:28Z2023-01-0110.1109/CONIITI61170.2023.10324219http://hdl.handle.net/10757/6730352023 9th International Conference on Innovation and Trends in Engineering, CONIITI 2023 - Proceedings2-s2.0-85179548588SCOPUS_ID:851795485880000 0001 2196 144XThis paper proposes to optimize the conventional cost analysis used by SMEs in school construction through qualitative analysis using Primavera Risk Analysis, Microsoft Excel, and Primavera P6. Several stages were carried out during the process: risk identification, identification of the most sensitive and susceptible items to project changes, sensitivity analysis, criticality analysis, all represented in tornado, bar, and scatter plots. The proposed risk management plan yielded the following results: it increased the reliability of the project's completion date from 41% to 61% in the analysis, increased budget reliability from 29% to 45%, and reduced the number of sensitive items based on 1000 iterations.ODS 4: Educación de CalidadODS 9: Industria, Innovación e InfraestructuraODS 11: Ciudades y Comunidades Sosteniblesapplication/htmlengInstitute of Electrical and Electronics Engineers Inc.info:eu-repo/semantics/embargoedAccesscostsPrimavera Risk Analysisreliabilityrisk managementsensitivitySMEsOptimization of Cost Analysis in School Construction: Risk Management.info:eu-repo/semantics/article2023 9th International Conference on Innovation and Trends in Engineering, CONIITI 2023 - Proceedingsreponame:UPC-Institucionalinstname:Universidad Peruana de Ciencias Aplicadasinstacron:UPCLICENSElicense.txtlicense.txttext/plain; charset=utf-81748https://repositorioacademico.upc.edu.pe/bitstream/10757/673035/1/license.txt8a4605be74aa9ea9d79846c1fba20a33MD51false10757/673035oai:repositorioacademico.upc.edu.pe:10757/6730352024-07-20 04:25:09.284Repositorio académico upcupc@openrepository.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
score 13.754011
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).