“mejoramiento de los indicadores de avance por incremento de la longitud de perforación de 6 a 8 pies, aplicando voladura controlada con accesorios no eléctricos de retardo en la mina de la compañía minera poderosa s.a.”
Descripción del Articulo
Compania Minera Poderosa SA He has been conducting operations in the ore deposits in the RA2120 section of 4.5 x 4.5 m in Nv. 2120 San Francisco Lode mine Pataz. Reservoir characteristics are irregular, being unstable areas, qualifying as rock MF / P (much fractured poor soil), generating sobrerotur...
| Autores: | , |
|---|---|
| Formato: | tesis de grado |
| Fecha de Publicación: | 2016 |
| Institución: | Universidad Nacional de Trujillo |
| Repositorio: | UNITRU-Tesis |
| Lenguaje: | español |
| OAI Identifier: | oai:dspace.unitru.edu.pe:20.500.14414/3853 |
| Enlace del recurso: | https://hdl.handle.net/20.500.14414/3853 |
| Nivel de acceso: | acceso abierto |
| Materia: | Mejoramiento de los indicadores de avance por incremento de la longitud de perforación |
| Sumario: | Compania Minera Poderosa SA He has been conducting operations in the ore deposits in the RA2120 section of 4.5 x 4.5 m in Nv. 2120 San Francisco Lode mine Pataz. Reservoir characteristics are irregular, being unstable areas, qualifying as rock MF / P (much fractured poor soil), generating sobrerotura and damage to the crown, and increase the percentage of dilution. The operation is carried out in a conventional manner and are checked overconsumption of explosives, which is reflected in the so-called load factor indicator. Other deficiencies relate to blasting explosive improper drill column instead of 66 % were carried more than 75 %, resulting on excavations and increased the cost of drilling and blasting. In drilling deviations in parallelism they are detected by the absence of guiding , taking the burden no uniform remains and becomes larger at the bottom of the bore , affecting the fracturing and expected progress , especially if the holes relief are shorter that production . Faced with this problem you had as a result unfavorable indicators such as: advance 1, 66 m / disp.; yield 0.49 m / hg.; load factor of 31.79 kg / m drilling and blasting costs at 311.65 US $ / m . To solve these problems a scheme research considered increasing the length drill 6 to 8 feet and applying controlled blasting using non-electric delay was designed accessories. As a result the following objectives were achieved: the progress increased from 1.66 to 2.05 m / disp .; the yield increased from 0.49 to 0.71 ; The so-called load factor decreased from 31.79 to 26.1 kg / m and decreased the cost of drilling and blasting of US $ 311.65 to US $ 288.32 . |
|---|
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).