Implementación de la metodología del valor ganado para controlar los costos de una obra conexa en la minera cerro corona, 2017

Descripción del Articulo

The contractor company Metalarc S.R.L. performs construction projects in the mining company Cerro Corona - Cajamarca. His main problem was the lack of a control tool in the progress of his works, this being the reason why many of his works have not obtained the benefit initially planned. Reason for...

Descripción completa

Detalles Bibliográficos
Autor: Chavez Ruiz, Jonatan Rogelio
Formato: tesis de grado
Fecha de Publicación:2018
Institución:Universidad Nacional de Trujillo
Repositorio:UNITRU-Tesis
Lenguaje:español
OAI Identifier:oai:dspace.unitru.edu.pe:20.500.14414/11034
Enlace del recurso:https://hdl.handle.net/20.500.14414/11034
Nivel de acceso:acceso abierto
Materia:Valor ganado, costos, cronograma
Descripción
Sumario:The contractor company Metalarc S.R.L. performs construction projects in the mining company Cerro Corona - Cajamarca. His main problem was the lack of a control tool in the progress of his works, this being the reason why many of his works have not obtained the benefit initially planned. Reason for which it was sought to implement a methodology that allows to control constantly on the costs, being this the Method of the Earned Value. The implementation of this methodology was in the work "Construction of the Solid Waste Warehouse", of 12 weeks’ duration. Where it proceeded to make the budget and schedule, which served as a baseline for subsequent calculations. Then, daily progress data was taken. Then, with these data, the performance indices and cost variations were calculated and estimated every four weeks. Finally, the result in the eighth week was that the final costs would be S /. 20,297.27 more than planned. That is where the decision was made to reduce that amount before reaching week twelve. At the end of the project, the final amount was S /. 15,449.93 on the planned, giving as final result a variation of 3.0% between the planned and the real. The above is beneficial for the company because in the previous works the average variation was 15.0%.
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).