Optimization of Design Coordination Processes for a 7-Story Multifamily Building Using Virtual Design and Construction (VDC)

Descripción del Articulo

Traditional construction and property companies often find themselves bound by conventional project management and design techniques, which can lead to delays during the design phase. This situation needs to be avoided. This study presents a process optimization for the design stage of multifamily b...

Descripción completa

Detalles Bibliográficos
Autores: Merino Chocano, Alvaro Enrique, Fernández Bustamante, Diego Alfredo, Del Savio, Alexandre Almeida
Formato: objeto de conferencia
Fecha de Publicación:2024
Institución:Universidad de Lima
Repositorio:ULIMA-Institucional
Lenguaje:inglés
OAI Identifier:oai:repositorio.ulima.edu.pe:20.500.12724/24431
Enlace del recurso:https://hdl.handle.net/20.500.12724/24431
https://doi.org/10.24928/2024/0125
Nivel de acceso:acceso abierto
Materia:Pendiente
https://purl.org/pe-repo/ocde/ford#2.11.04
id RULI_92d53bc43bc9eea75d08b6bcc72e7835
oai_identifier_str oai:repositorio.ulima.edu.pe:20.500.12724/24431
network_acronym_str RULI
network_name_str ULIMA-Institucional
repository_id_str 3883
spelling Merino Chocano, Alvaro EnriqueFernández Bustamante, Diego AlfredoDel Savio, Alexandre AlmeidaDel Savio, Alexandre AlmeidaMerino Chocano, Alvaro Enrique (Ingeniería Civil)Fernández Bustamante, Diego Alfredo (Ingeniería Civil)2026-03-02T20:53:01Z2026-03-02T20:53:01Z20242789-0015https://hdl.handle.net/20.500.12724/24431000000012154181632nd Annual Conference of the International Group for Lean Constructionhttps://doi.org/10.24928/2024/01252-s2.0-105006423874Traditional construction and property companies often find themselves bound by conventional project management and design techniques, which can lead to delays during the design phase. This situation needs to be avoided. This study presents a process optimization for the design stage of multifamily buildings using Virtual Design Construction (VDC) - a collaborative project management approach. Focused on a case study involving two residential buildings developed by the same property company in Lima, Peru, this research commences with a comprehensive analysis of the existing design processes from the projects. By pinpointing key sources of variability and streamlining the design flow, the proposed VDC implementation aims to enhance compliance with project timelines and the approval of design drawings. The optimized process yielded tangible results, significantly reducing design time, completing tasks ahead of the scheduled deadline, and improving the delivery of technical files by 25%. These outcomes underscore the benefits of this optimized process, including enhanced project efficiency and improved design quality, thereby making a compelling case for applying VDC in similar construction projects by property companies.htmlengInternational Group for Lean ConstructionNZurn:issn: 2789-0015info:eu-repo/semantics/openAccessPendientehttps://purl.org/pe-repo/ocde/ford#2.11.04Optimization of Design Coordination Processes for a 7-Story Multifamily Building Using Virtual Design and Construction (VDC)info:eu-repo/semantics/conferenceObjectArtículo de conferencia (Scopus)reponame:ULIMA-Institucionalinstname:Universidad de Limainstacron:ULIMA20.500.12724/24431oai:repositorio.ulima.edu.pe:20.500.12724/244312026-04-20 19:35:55.074Repositorio Universidad de Limarepositorio@ulima.edu.pe
dc.title.none.fl_str_mv Optimization of Design Coordination Processes for a 7-Story Multifamily Building Using Virtual Design and Construction (VDC)
title Optimization of Design Coordination Processes for a 7-Story Multifamily Building Using Virtual Design and Construction (VDC)
spellingShingle Optimization of Design Coordination Processes for a 7-Story Multifamily Building Using Virtual Design and Construction (VDC)
Merino Chocano, Alvaro Enrique
Pendiente
https://purl.org/pe-repo/ocde/ford#2.11.04
title_short Optimization of Design Coordination Processes for a 7-Story Multifamily Building Using Virtual Design and Construction (VDC)
title_full Optimization of Design Coordination Processes for a 7-Story Multifamily Building Using Virtual Design and Construction (VDC)
title_fullStr Optimization of Design Coordination Processes for a 7-Story Multifamily Building Using Virtual Design and Construction (VDC)
title_full_unstemmed Optimization of Design Coordination Processes for a 7-Story Multifamily Building Using Virtual Design and Construction (VDC)
title_sort Optimization of Design Coordination Processes for a 7-Story Multifamily Building Using Virtual Design and Construction (VDC)
author Merino Chocano, Alvaro Enrique
author_facet Merino Chocano, Alvaro Enrique
Fernández Bustamante, Diego Alfredo
Del Savio, Alexandre Almeida
author_role author
author2 Fernández Bustamante, Diego Alfredo
Del Savio, Alexandre Almeida
author2_role author
author
dc.contributor.other.none.fl_str_mv Del Savio, Alexandre Almeida
dc.contributor.student.none.fl_str_mv Merino Chocano, Alvaro Enrique (Ingeniería Civil)
Fernández Bustamante, Diego Alfredo (Ingeniería Civil)
dc.contributor.author.fl_str_mv Merino Chocano, Alvaro Enrique
Fernández Bustamante, Diego Alfredo
Del Savio, Alexandre Almeida
dc.subject.none.fl_str_mv Pendiente
topic Pendiente
https://purl.org/pe-repo/ocde/ford#2.11.04
dc.subject.ocde.none.fl_str_mv https://purl.org/pe-repo/ocde/ford#2.11.04
description Traditional construction and property companies often find themselves bound by conventional project management and design techniques, which can lead to delays during the design phase. This situation needs to be avoided. This study presents a process optimization for the design stage of multifamily buildings using Virtual Design Construction (VDC) - a collaborative project management approach. Focused on a case study involving two residential buildings developed by the same property company in Lima, Peru, this research commences with a comprehensive analysis of the existing design processes from the projects. By pinpointing key sources of variability and streamlining the design flow, the proposed VDC implementation aims to enhance compliance with project timelines and the approval of design drawings. The optimized process yielded tangible results, significantly reducing design time, completing tasks ahead of the scheduled deadline, and improving the delivery of technical files by 25%. These outcomes underscore the benefits of this optimized process, including enhanced project efficiency and improved design quality, thereby making a compelling case for applying VDC in similar construction projects by property companies.
publishDate 2024
dc.date.accessioned.none.fl_str_mv 2026-03-02T20:53:01Z
dc.date.available.none.fl_str_mv 2026-03-02T20:53:01Z
dc.date.issued.fl_str_mv 2024
dc.type.none.fl_str_mv info:eu-repo/semantics/conferenceObject
dc.type.other.none.fl_str_mv Artículo de conferencia (Scopus)
format conferenceObject
dc.identifier.issn.none.fl_str_mv 2789-0015
dc.identifier.uri.none.fl_str_mv https://hdl.handle.net/20.500.12724/24431
dc.identifier.isni.none.fl_str_mv 0000000121541816
dc.identifier.event.none.fl_str_mv 32nd Annual Conference of the International Group for Lean Construction
dc.identifier.doi.none.fl_str_mv https://doi.org/10.24928/2024/0125
dc.identifier.scopusid.none.fl_str_mv 2-s2.0-105006423874
identifier_str_mv 2789-0015
0000000121541816
32nd Annual Conference of the International Group for Lean Construction
2-s2.0-105006423874
url https://hdl.handle.net/20.500.12724/24431
https://doi.org/10.24928/2024/0125
dc.language.iso.none.fl_str_mv eng
language eng
dc.relation.ispartof.none.fl_str_mv urn:issn: 2789-0015
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv html
dc.publisher.none.fl_str_mv International Group for Lean Construction
dc.publisher.country.none.fl_str_mv NZ
publisher.none.fl_str_mv International Group for Lean Construction
dc.source.none.fl_str_mv reponame:ULIMA-Institucional
instname:Universidad de Lima
instacron:ULIMA
instname_str Universidad de Lima
instacron_str ULIMA
institution ULIMA
reponame_str ULIMA-Institucional
collection ULIMA-Institucional
repository.name.fl_str_mv Repositorio Universidad de Lima
repository.mail.fl_str_mv repositorio@ulima.edu.pe
_version_ 1868173691337048064
score 13.075366
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).