Optimization of Design Coordination Processes for a 7-Story Multifamily Building Using Virtual Design and Construction (VDC)

Descripción del Articulo

Traditional construction and property companies often find themselves bound by conventional project management and design techniques, which can lead to delays during the design phase. This situation needs to be avoided. This study presents a process optimization for the design stage of multifamily b...

Descripción completa

Detalles Bibliográficos
Autores: Fernández Bustamante, Diego Alfredo, Merino Chocano, Alvaro Enrique
Formato: tesis de grado
Fecha de Publicación:2024
Institución:Universidad de Lima
Repositorio:ULIMA-Institucional
Lenguaje:inglés
OAI Identifier:oai:repositorio.ulima.edu.pe:20.500.12724/21108
Enlace del recurso:https://hdl.handle.net/20.500.12724/21108
Nivel de acceso:acceso abierto
Materia:Proyectos de construcción
Construction projects
Multifamily housing
Building information modeling
Viviendas multifamiliares
Modelado de información de construcción
https://purl.org/pe-repo/ocde/ford#2.01.01
Descripción
Sumario:Traditional construction and property companies often find themselves bound by conventional project management and design techniques, which can lead to delays during the design phase. This situation needs to be avoided. This study presents a process optimization for the design stage of multifamily buildings using Virtual Design Construction (VDC) - a collaborative project management approach. Focused on a case study involving two residential buildings developed by the same property company in Lima, Peru, this research commences with a comprehensive analysis of the existing design processes from the projects. By pinpointing key sources of variability and streamlining the design flow, the proposed VDC implementation aims to enhance compliance with project timelines and the approval of design drawings. The optimized process yielded tangible results, significantly reducing design time, completing tasks ahead of the scheduled deadline, and improving the delivery of technical files by 25%. These outcomes underscore the benefits of this optimized process, including enhanced project efficiency and improved design quality, thereby making a compelling case for applying VDC in similar construction projects by property companies.
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).