Withdrawals of electric power and energy national interconnected contract without back care system regulated market held by the peruvian electric distribution companies: Background: Causes and consequences
Descripción del Articulo
The subject of this article is to show an overview of a problem that occurred in the Peruvian Electricity Sector in 2004 and, unfortunately, still produces practical and legal effects in the current system. We refer to the “physical withdrawals of capacity and energy from the SEIN for the attention...
| Autor: | |
|---|---|
| Formato: | artículo |
| Fecha de Publicación: | 2016 |
| Institución: | Universidad de San Martín de Porres |
| Repositorio: | Revistas - Universidad de San Martín de Porres |
| Lenguaje: | español |
| OAI Identifier: | oai:revistas.usmp.edu.pe:article/405 |
| Enlace del recurso: | https://portalrevistas.aulavirtualusmp.pe/index.php/VJ/article/view/405 |
| Nivel de acceso: | acceso abierto |
| Materia: | Crisis of PPA physical withdrawals without PPA marginal costs of short-term spot market bus bar tariff PPA SEIN Crisis de los contratos retiros sin contrato costos marginales de corto plazo mercado spot tarifa en barra |
| id |
REVUSMP_9d0e439298ffc3568b5e4f8dce587e8e |
|---|---|
| oai_identifier_str |
oai:revistas.usmp.edu.pe:article/405 |
| network_acronym_str |
REVUSMP |
| network_name_str |
Revistas - Universidad de San Martín de Porres |
| repository_id_str |
|
| spelling |
Withdrawals of electric power and energy national interconnected contract without back care system regulated market held by the peruvian electric distribution companies: Background: Causes and consequencesRetiros de potencia y energía del sistema eléctrico interconectado nacional, sin respaldo contractual para la atención del mercado regulado, llevados a cabo por las empresas peruanas de distribución eléctrica: Antecedentes, causas y consecuenciasVignolo Cueva, GiancarloCrisis of PPAphysical withdrawals without PPAmarginal costs of short-termspot marketbus bar tariffPPASEINCrisis de los contratosretiros sin contratocostos marginales de corto plazomercado spottarifa en barraPPASEINThe subject of this article is to show an overview of a problem that occurred in the Peruvian Electricity Sector in 2004 and, unfortunately, still produces practical and legal effects in the current system. We refer to the “physical withdrawals of capacity and energy from the SEIN for the attention of the regulated market”, by the different distribution companies without having a PPA signed and valid with any generating power company.El objeto del presente artículo consiste en mostrarle al lector un panorama general sobre un problema que ocurrió en el sector eléctrico peruano en el 2004 y que lamentablemente aún produce efectos prácticos y jurídicos en el ordenamiento vigente, pues no ha podido ser resuelto y solucionado de manera integral y definitiva. Nos referimos a los retiros físicos de potencia y energía del SEIN, destinados a la atención del mercado regulado, por parte de las distintas empresas distribuidoras, sin que tengan un contrato de suministro (PPA) firmado y vigente con alguna empresa generadora.Fondo Editorial de la Universidad de San Martín de Porres2016-03-14info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://portalrevistas.aulavirtualusmp.pe/index.php/VJ/article/view/405Vox Juris; Vol. 30 No. 2 (2015): VOX JURIS 30; 227-239Vox Juris; Vol. 30 Núm. 2 (2015): VOX JURIS 30; 227-2392521-52801812-6804reponame:Revistas - Universidad de San Martín de Porresinstname:Universidad de San Martín de Porresinstacron:USMPspahttps://portalrevistas.aulavirtualusmp.pe/index.php/VJ/article/view/405/350Derechos de autor 2016 Giancarlo Vignolo Cuevainfo:eu-repo/semantics/openAccessoai:revistas.usmp.edu.pe:article/4052020-02-21T17:11:25Z |
| dc.title.none.fl_str_mv |
Withdrawals of electric power and energy national interconnected contract without back care system regulated market held by the peruvian electric distribution companies: Background: Causes and consequences Retiros de potencia y energía del sistema eléctrico interconectado nacional, sin respaldo contractual para la atención del mercado regulado, llevados a cabo por las empresas peruanas de distribución eléctrica: Antecedentes, causas y consecuencias |
| title |
Withdrawals of electric power and energy national interconnected contract without back care system regulated market held by the peruvian electric distribution companies: Background: Causes and consequences |
| spellingShingle |
Withdrawals of electric power and energy national interconnected contract without back care system regulated market held by the peruvian electric distribution companies: Background: Causes and consequences Vignolo Cueva, Giancarlo Crisis of PPA physical withdrawals without PPA marginal costs of short-term spot market bus bar tariff PPA SEIN Crisis de los contratos retiros sin contrato costos marginales de corto plazo mercado spot tarifa en barra PPA SEIN |
| title_short |
Withdrawals of electric power and energy national interconnected contract without back care system regulated market held by the peruvian electric distribution companies: Background: Causes and consequences |
| title_full |
Withdrawals of electric power and energy national interconnected contract without back care system regulated market held by the peruvian electric distribution companies: Background: Causes and consequences |
| title_fullStr |
Withdrawals of electric power and energy national interconnected contract without back care system regulated market held by the peruvian electric distribution companies: Background: Causes and consequences |
| title_full_unstemmed |
Withdrawals of electric power and energy national interconnected contract without back care system regulated market held by the peruvian electric distribution companies: Background: Causes and consequences |
| title_sort |
Withdrawals of electric power and energy national interconnected contract without back care system regulated market held by the peruvian electric distribution companies: Background: Causes and consequences |
| dc.creator.none.fl_str_mv |
Vignolo Cueva, Giancarlo |
| author |
Vignolo Cueva, Giancarlo |
| author_facet |
Vignolo Cueva, Giancarlo |
| author_role |
author |
| dc.subject.none.fl_str_mv |
Crisis of PPA physical withdrawals without PPA marginal costs of short-term spot market bus bar tariff PPA SEIN Crisis de los contratos retiros sin contrato costos marginales de corto plazo mercado spot tarifa en barra PPA SEIN |
| topic |
Crisis of PPA physical withdrawals without PPA marginal costs of short-term spot market bus bar tariff PPA SEIN Crisis de los contratos retiros sin contrato costos marginales de corto plazo mercado spot tarifa en barra PPA SEIN |
| description |
The subject of this article is to show an overview of a problem that occurred in the Peruvian Electricity Sector in 2004 and, unfortunately, still produces practical and legal effects in the current system. We refer to the “physical withdrawals of capacity and energy from the SEIN for the attention of the regulated market”, by the different distribution companies without having a PPA signed and valid with any generating power company. |
| publishDate |
2016 |
| dc.date.none.fl_str_mv |
2016-03-14 |
| dc.type.none.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
| format |
article |
| status_str |
publishedVersion |
| dc.identifier.none.fl_str_mv |
https://portalrevistas.aulavirtualusmp.pe/index.php/VJ/article/view/405 |
| url |
https://portalrevistas.aulavirtualusmp.pe/index.php/VJ/article/view/405 |
| dc.language.none.fl_str_mv |
spa |
| language |
spa |
| dc.relation.none.fl_str_mv |
https://portalrevistas.aulavirtualusmp.pe/index.php/VJ/article/view/405/350 |
| dc.rights.none.fl_str_mv |
Derechos de autor 2016 Giancarlo Vignolo Cueva info:eu-repo/semantics/openAccess |
| rights_invalid_str_mv |
Derechos de autor 2016 Giancarlo Vignolo Cueva |
| eu_rights_str_mv |
openAccess |
| dc.format.none.fl_str_mv |
application/pdf |
| dc.publisher.none.fl_str_mv |
Fondo Editorial de la Universidad de San Martín de Porres |
| publisher.none.fl_str_mv |
Fondo Editorial de la Universidad de San Martín de Porres |
| dc.source.none.fl_str_mv |
Vox Juris; Vol. 30 No. 2 (2015): VOX JURIS 30; 227-239 Vox Juris; Vol. 30 Núm. 2 (2015): VOX JURIS 30; 227-239 2521-5280 1812-6804 reponame:Revistas - Universidad de San Martín de Porres instname:Universidad de San Martín de Porres instacron:USMP |
| instname_str |
Universidad de San Martín de Porres |
| instacron_str |
USMP |
| institution |
USMP |
| reponame_str |
Revistas - Universidad de San Martín de Porres |
| collection |
Revistas - Universidad de San Martín de Porres |
| repository.name.fl_str_mv |
|
| repository.mail.fl_str_mv |
|
| _version_ |
1846883124012646400 |
| score |
12.636967 |
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).