Gestión de la Continuidad de Negocio: Caso Ravmar Freight del Sector Logístico
Descripción del Articulo
The COVID-19 pandemic demonstrated the need for the implementation of a business continuity system in organizations to deal with critical situations and events that could stop their operations. The objective of this study is to design the business continuity management system (BCMS) of the Ravmar fr...
Autores: | , , |
---|---|
Formato: | artículo |
Fecha de Publicación: | 2021 |
Institución: | Pontificia Universidad Católica del Perú |
Repositorio: | Revistas - Pontificia Universidad Católica del Perú |
Lenguaje: | español |
OAI Identifier: | oai:revistaspuc:article/24544 |
Enlace del recurso: | http://revistas.pucp.edu.pe/index.php/360gestion/article/view/24544 |
Nivel de acceso: | acceso abierto |
Materia: | Business continuity management system BCMS ISO 22301:2019 Business continuity plan Contingency plan Risk management Sistema de gestión de continuidad del negocio SGCN Plan de continuidad del negocio Plan de contingencia Gestión de riesgos |
Sumario: | The COVID-19 pandemic demonstrated the need for the implementation of a business continuity system in organizations to deal with critical situations and events that could stop their operations. The objective of this study is to design the business continuity management system (BCMS) of the Ravmar freight agency, based on the ISO 22301:2019 standard. The work method is analytical-descriptive and applied management. To do this, virtual interviews were held with Ravmar's Senior Management to learn about its processes in detail and, then, all the information obtained was analyzed in order to determine the company's level of compliance with the requirements of the ISO standard. After the diagnosis, the proposal for the design of the BCMS was developed for the organization in question, ensuring a level of 100 % compliance of the requirements indicated by the clauses of the rule. Finally, the feasibility analysis of the design implementation was carried out, concluding that the proposal is viable and that the level of compliance presented by the Ravmar BCMS, in accordance with the requirements stipulated in ISO 22301:2019, is of 10 %. This percentage shows that the organization does not have information related to business continuity for the processes that are part of the export service |
---|
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).