Tópicos Sugeridos dentro de su búsqueda.
Tópicos Sugeridos dentro de su búsqueda.
Buscar alternativas:
sanitation project » sanitation projects (Expander búsqueda), translation project (Expander búsqueda), irrigation project (Expander búsqueda)
para sanitation » rural sanitation (Expander búsqueda), case sanitation (Expander búsqueda), basic sanitation (Expander búsqueda)
sanitation project » sanitation projects (Expander búsqueda), translation project (Expander búsqueda), irrigation project (Expander búsqueda)
para sanitation » rural sanitation (Expander búsqueda), case sanitation (Expander búsqueda), basic sanitation (Expander búsqueda)
1
artículo
Publicado 2019
Enlace
Enlace
This paper focus on implementation of communication strategies developed in the Rehabilitation of Potable Water and Sewerage Network Lote 3 project, executed between 2013 and 2014 in the district of Comas, north of Lima-Peru, and belonging to the Servicio de Agua Potable y Alcantarillado de Lima (SEDAPAL), company responsible for water and sewage in Lima. As a result, it could be observed that the implementation of a diagnosis of perceptions, the communication plan and the communication and education products allowed to facilitate the design of messages according to the context of the project, taking into account the speeches of the users against and in favor of the project, as well as the objectives sought by the executing company.
2
artículo
Publicado 2019
Enlace
Enlace
This paper focus on implementation of communication strategies developed in the Rehabilitation of Potable Water and Sewerage Network Lote 3 project, executed between 2013 and 2014 in the district of Comas, north of Lima-Peru, and belonging to the Servicio de Agua Potable y Alcantarillado de Lima (SEDAPAL), company responsible for water and sewage in Lima. As a result, it could be observed that the implementation of a diagnosis of perceptions, the communication plan and the communication and education products allowed to facilitate the design of messages according to the context of the project, taking into account the speeches of the users against and in favor of the project, as well as the objectives sought by the executing company.
3
artículo
Publicado 2020
Enlace
Enlace
The research work was carried out with the information and evaluation of executed contracts for the execution of works in the Sanitation Services Provider Entity (EPS TACNA SA) Period 2012 - 2018, this investigation has the purpose of design a contract management model to improve the project management in sanitation works in the EPS TACNA SA; During this period of execution of works by CONTRACT MODE we have been able to see an innumerable numbers of queries, contradictions, omissions, negligence; having to be acquitted by the Supervision or directly by the Project Consultant. This confusing project generates risks in the projects executed by EPS Tacna SA, which in many cases cause the investments to be affected by paralyzes, unjustified delays finally in arbitration and this implies that they do not maintain their investment cycle and therefore loss of entity. FIDIC (International Federa...
4
artículo
Publicado 2020
Enlace
Enlace
The research work was carried out with the information and evaluation of executed contracts for the execution of works in the Sanitation Services Provider Entity (EPS TACNA SA) Period 2012 - 2018, this investigation has the purpose of design a contract management model to improve the project management in sanitation works in the EPS TACNA SA; During this period of execution of works by CONTRACT MODE we have been able to see an innumerable numbers of queries, contradictions, omissions, negligence; having to be acquitted by the Supervision or directly by the Project Consultant. This confusing project generates risks in the projects executed by EPS Tacna SA, which in many cases cause the investments to be affected by paralyzes, unjustified delays finally in arbitration and this implies that they do not maintain their investment cycle and therefore loss of entity. FIDIC (International Federa...
5
artículo
Publicado 2020
Enlace
Enlace
The research work was carried out with the information and evaluation of executed contracts for the execution of works in the Sanitation Services Provider Entity (EPS TACNA SA) Period 2012 - 2018, this investigation has the purpose of design a contract management model to improve the project management in sanitation works in the EPS TACNA SA; During this period of execution of works by CONTRACT MODE we have been able to see an innumerable numbers of queries, contradictions, omissions, negligence; having to be acquitted by the Supervision or directly by the Project Consultant. This confusing project generates risks in the projects executed by EPS Tacna SA, which in many cases cause the investments to be affected by paralyzes, unjustified delays finally in arbitration and this implies that they do not maintain their investment cycle and therefore loss of entity. FIDIC (International Federa...
6
artículo
Publicado 2022
Enlace
Enlace
The research aims to determine that artificial intelligence is related to the management of public investment projects in Peru. This is demonstrated thanks to the study consisting of a literature review and the design of a survey, with a census sample. According to the results of the Spearman test, the described hypotheses are proved and as a contribution, an optimization model for project prioritization (MOPP) is proposed.
7
artículo
Publicado 2022
Enlace
Enlace
Esta investigación tiene como objetivo determinar que la inteligencia artificial se relaciona con la gestión de proyectos de inversión pública en el Perú. Esto se demuestra en la revisión de bibliografía y el diseño de una encuesta, con una muestra censal. Según los resultados de la prueba Spearman, se comprueban las hipótesis descritas. Finalmente, se propone como aporte un modelo de optimización para la priorización de proyectos (MOPP).
8
artículo
Publicado 2020
Enlace
Enlace
The document that is presented addresses the problem of frequent deviations that occur in the management of projects, poor execution of work in time. Cost and specifications, which finally marks the planned utilities for the projects, as well as the consequent dissatisfaction of the clients that as a client usually does not perform a control task but rather leaves all the activities to the supervisor and this entails no Take action before the events occur. All this is basically linked to the ¡nadequate supervision and execution of work in the construction processes by the companies, that is, do not count or apply a method, system to carry the work properly. The main objective of this work is to develop an integrated system of Process Management for the client (public entity), all from the compatibility of the technical file completed and approved to then move on to the elaboration of th...
9
artículo
Publicado 2020
Enlace
Enlace
The document that is presented addresses the problem of frequent deviations that occur in the management of projects, poor execution of work in time. Cost and specifications, which finally marks the planned utilities for the projects, as well as the consequent dissatisfaction of the clients that as a client usually does not perform a control task but rather leaves all the activities to the supervisor and this entails no Take action before the events occur. All this is basically linked to the ¡nadequate supervision and execution of work in the construction processes by the companies, that is, do not count or apply a method, system to carry the work properly. The main objective of this work is to develop an integrated system of Process Management for the client (public entity), all from the compatibility of the technical file completed and approved to then move on to the elaboration of th...
10
artículo
Publicado 2020
Enlace
Enlace
The document that is presented addresses the problem of frequent deviations that occur in the management of projects, poor execution of work in time. Cost and specifications, which finally marks the planned utilities for the projects, as well as the consequent dissatisfaction of the clients that as a client usually does not perform a control task but rather leaves all the activities to the supervisor and this entails no Take action before the events occur. All this is basically linked to the ¡nadequate supervision and execution of work in the construction processes by the companies, that is, do not count or apply a method, system to carry the work properly. The main objective of this work is to develop an integrated system of Process Management for the client (public entity), all from the compatibility of the technical file completed and approved to then move on to the elaboration of th...
11
artículo
Publicado 2020
Enlace
Enlace
Infrastructure projects incorporate, as a general rule, a complex contractual structure that must respond to the needs of the project, including the risk management in the construction of the works.The objective is to develop a risk management model that improves the scope, time and cost of the direct management basic sanitation projects executed by the EPS of the Tacna Region, 2017. For this purpose, the research used is of the application type. , not experimental and quantitative. Determine the specific objectives through tools and techniques, through surveys and expert evaluation, which are processed with the Monte Carlo Method using the RiskyProject Professional Program that records the risks that are part of the scope, determines the contingency in cost and time.The risk management model to be followed responds to the good practices of the PMBOK. The application of the proposed mode...
12
artículo
Publicado 2020
Enlace
Enlace
Infrastructure projects incorporate, as a general rule, a complex contractual structure that must respond to the needs of the project, including the risk management in the construction of the works.The objective is to develop a risk management model that improves the scope, time and cost of the direct management basic sanitation projects executed by the EPS of the Tacna Region, 2017. For this purpose, the research used is of the application type. , not experimental and quantitative. Determine the specific objectives through tools and techniques, through surveys and expert evaluation, which are processed with the Monte Carlo Method using the RiskyProject Professional Program that records the risks that are part of the scope, determines the contingency in cost and time.The risk management model to be followed responds to the good practices of the PMBOK. The application of the proposed mode...
13
artículo
Publicado 2020
Enlace
Enlace
Infrastructure projects incorporate, as a general rule, a complex contractual structure that must respond to the needs of the project, including the risk management in the construction of the works.The objective is to develop a risk management model that improves the scope, time and cost of the direct management basic sanitation projects executed by the EPS of the Tacna Region, 2017. For this purpose, the research used is of the application type. , not experimental and quantitative. Determine the specific objectives through tools and techniques, through surveys and expert evaluation, which are processed with the Monte Carlo Method using the RiskyProject Professional Program that records the risks that are part of the scope, determines the contingency in cost and time.The risk management model to be followed responds to the good practices of the PMBOK. The application of the proposed mode...
14
Publicado 2019
Enlace
Enlace
Este trabajo se realizó con fines de participar en la solución de la problemática social debida a la falta de atención a los servicios básicos de agua y saneamiento de la población, como consecuencia del crecimiento acelerado y factores migratorios, buscando la mejora de la calidad de vida, al contar con una obra de gran envergadura. De manera que se ha participado en la formulación del proyecto en mención para lograr una propuesta adecuadamente estudiada. Para su elaboración se ha tomado en cuenta el desarrollo de actividades relacionadas al diseño de instalaciones de agua potable y alcantarillado urbano. Se han aplicado todos los conceptos básicos requeridos en el Área de Construcción, en especial lo que corresponde al manejo de metrados, costos, presupuestos y demás, siguiendo los lineamientos establecidos para su manejo, así como la participación de nuestra casa super...
15
artículo
Publicado 2020
Enlace
Enlace
The house and chapel of the old Punchauca hacienda was declared a National Monumental Heritage Site in 1980. This recognition was given for having been the site, during the independence period, of the interview between the Liberator José de San Martín and the viceroy José de la Serna. However, after this declaration, the National Institute of Culture and today the Ministry of Culture have done little to carry out a complete delimitation of the intangible area, the legal physical sanitation, and to carry out an integral project of recovery and restoration of the monument, and its subsequent execution. Moreover, in recent years, the building has been cut down, affecting the integrity of the monument. In this sense, with the Bicentennial approaching and according to institutional documents of the State, we reviewed the actions carried out in P...
16
artículo
Publicado 2020
Enlace
Enlace
The house and chapel of the old Punchauca hacienda was declared a National Monumental Heritage Site in 1980. This recognition was given for having been the site, during the independence period, of the interview between the Liberator José de San Martín and the viceroy José de la Serna. However, after this declaration, the National Institute of Culture and today the Ministry of Culture have done little to carry out a complete delimitation of the intangible area, the legal physical sanitation, and to carry out an integral project of recovery and restoration of the monument, and its subsequent execution. Moreover, in recent years, the building has been cut down, affecting the integrity of the monument. In this sense, with the Bicentennial approaching and according to institutional documents of the State, we reviewed the actions carried out in P...
17
tesis de grado
Publicado 2025
Enlace
Enlace
El trabajo de suficiencia profesional se enfoca en la experiencia y los aportes del asistente técnico, quien aplica sus conocimientos en el control de la ejecución del proyecto "Instalación del saneamiento básico integral en la comunidad nativa Séptimo Unido Santa Fe de Aguachini del distrito de Puerto Bermúdez, provincia Oxapampa – región Pasco", con CUI 2235359 para la Subgerencia de Supervisión de Obras del Gobierno Regional de Pasco. El objetivo primordial de este proyecto es maximizar la calidad de vida de los habitantes mediante la provisión de servic ios de agua potable, asegurando que se cumplan los estándares de salud, higiene y sostenibilidad ambiental. En este contexto, mi rol se centra en asistir en el control y monitoreo de la obra a lo largo de todas las fases de ejecución. La contratación se realizó bajo un sistema de costos unitarios, con un monto total de ...
18
artículo
Publicado 2025
Enlace
Enlace
This study carries out an analysis of progress and improvements in investment in projects in the public sector of Peru between the years 2001 and 2022. To do this, descriptive statistics were carried out on the main characteristics of investment in the public sector and interviews with the sectorists of the General Directorate of Multiannual Investment Programming (DGPMI) of the Ministry of Economy and Finance (MEF). The research methodology is qualitative, since a brief account is made of some research concerning the topic of investment in the public sector in the Formulation and Evaluation (M&E), and Execution stage; Likewise, semi-structured interviews were carried out with the Transportation, Agriculture, Sanitation, Education and Health sectors of the DGPMI of the MEF. The main results of this research are the following: the viability time of the projects was reduced through the...
19
artículo
Publicado 2019
Enlace
Enlace
The objective of the research was to determine the Impact of Public Investment projects on improving the living conditions of the population of the district of Marías - Huánuco 2007-2015. The type of research was applied, whose level of investigation was correlational. The research design was non-experimental - transversal. The research population consisted of 678 people over 18 years of age, from the district of Marías, beneficiary of the public investment projects of water and sanitation, health, education and electrification, located in the localities of Maynas, Patay Rondos, Marías, Chipaquillo, Guenehuylca, Ichic Marías, Pura, Tantacoto, Ticte, Ututo, Gorgor. The sample of the investigation was constituted by 80 people of the district of Marias, for the calculation of the size of the sample Probabilistic sampling was used. The results arrived at in the present investigation wer...
20
artículo
Publicado 2022
Enlace
Enlace
Investment decisions in public policies have been associated with a sectoral and services approach. Infrastructure and investment plans are usually linked to project portfolios in transportation, sanitation, education, health, irrigation, among others. However, the territorial approach in the preparation and management of projects has acquired greater relevance in government policies. For example, in investments in economic logistics corridor, in a drainage basin, in risk management against natural hazards, or in urban development and mobility. The fact is that decision-making is based on the analysis of a territory and all the multisectoral and socioeconomic dynamics that it implies. The investment, budget and planning systems have advanced significantly in the application of tools and methodologies. It remains to promote and advance on this path so that it can be expressed in the execu...