Incumplimiento con la calidad adecuada en los procesos constructivos de obras de edificación, caso de estudio de centro comercial
Descripción del Articulo
This work focuses on quality improvement concerning the structural elements of a shopping center, in order to reduce and minimize the most relevant Non-Conformities that occurred on site. The project was based on the construction and expansion of tenants of a shopping center that will be rented as i...
Autor: | |
---|---|
Formato: | tesis de maestría |
Fecha de Publicación: | 2020 |
Institución: | Universidad Peruana de Ciencias Aplicadas |
Repositorio: | UPC-Institucional |
Lenguaje: | español |
OAI Identifier: | oai:repositorioacademico.upc.edu.pe:10757/653704 |
Enlace del recurso: | http://hdl.handle.net/10757/653704 |
Nivel de acceso: | acceso abierto |
Materia: | Calidad Análisis causa raíz Diagrama de causa efecto Diagrama de pareto Gasto incurrido Improvement Quality Root cause analysis Cause effect diagram Pareto chart Incurred expense https://purl.org/pe-repo/ocde/ford#2.01.03 |
Sumario: | This work focuses on quality improvement concerning the structural elements of a shopping center, in order to reduce and minimize the most relevant Non-Conformities that occurred on site. The project was based on the construction and expansion of tenants of a shopping center that will be rented as its purpose. By applying the Root Cause Analysis and using the Ishikawa diagram and Pareto diagram tools, it was possible to find the possible causes of quality noncompliance in the structural elements, which were subsequently validated in order to determine corrective actions. In the first chapter the problem statement, main and secondary problems, justification for the study, limitation and general and specific objectives are indicated. In the Second Chapter the theoretical framework is pointed out, where it mentions the quality in Peru, the total quality management, the costs of quality in construction, quality engineering and definitions. The third chapter indicates the use of Root Cause Analysis, the Cause Effect Diagram and Pareto Diagram tools. In the fourth chapter, the development of root cause analysis is presented using a sequence of steps. In the fifth chapter, The Economic Evaluation, Construction Budget, Repair Cost and Incurred Expense Analysis. Finally, in chapter six, the conclusions and recommendations of this work will be presented. |
---|
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).