Incumplimiento con la calidad adecuada en los procesos constructivos de obras de edificación, caso de estudio de centro comercial

Descripción del Articulo

This work focuses on quality improvement concerning the structural elements of a shopping center, in order to reduce and minimize the most relevant Non-Conformities that occurred on site. The project was based on the construction and expansion of tenants of a shopping center that will be rented as i...

Descripción completa

Detalles Bibliográficos
Autor: Sobero Alania, Macario charles
Formato: tesis de maestría
Fecha de Publicación:2020
Institución:Universidad Peruana de Ciencias Aplicadas
Repositorio:UPC-Institucional
Lenguaje:español
OAI Identifier:oai:repositorioacademico.upc.edu.pe:10757/653704
Enlace del recurso:http://hdl.handle.net/10757/653704
Nivel de acceso:acceso abierto
Materia:Calidad
Análisis causa raíz
Diagrama de causa efecto
Diagrama de pareto
Gasto incurrido
Improvement
Quality
Root cause analysis
Cause effect diagram
Pareto chart
Incurred expense
https://purl.org/pe-repo/ocde/ford#2.01.03
Descripción
Sumario:This work focuses on quality improvement concerning the structural elements of a shopping center, in order to reduce and minimize the most relevant Non-Conformities that occurred on site. The project was based on the construction and expansion of tenants of a shopping center that will be rented as its purpose. By applying the Root Cause Analysis and using the Ishikawa diagram and Pareto diagram tools, it was possible to find the possible causes of quality noncompliance in the structural elements, which were subsequently validated in order to determine corrective actions. In the first chapter the problem statement, main and secondary problems, justification for the study, limitation and general and specific objectives are indicated. In the Second Chapter the theoretical framework is pointed out, where it mentions the quality in Peru, the total quality management, the costs of quality in construction, quality engineering and definitions. The third chapter indicates the use of Root Cause Analysis, the Cause Effect Diagram and Pareto Diagram tools. In the fourth chapter, the development of root cause analysis is presented using a sequence of steps. In the fifth chapter, The Economic Evaluation, Construction Budget, Repair Cost and Incurred Expense Analysis. Finally, in chapter six, the conclusions and recommendations of this work will be presented.
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).