Proposal for the implementation of a safety plan integrating the Deming cycle to minimize scaffolding accidents at height in a multifamily building
Descripción del Articulo
The article below presents the application of a safety plan based on the Deming cycle, also known as the PDCA (Plan, Do, Check, Act) cycle, the objective of the research is to minimize scaffolding fall from height accidents in the construction industry workplace. This methodology is effective in imp...
Autores: | , , |
---|---|
Formato: | artículo |
Fecha de Publicación: | 2023 |
Institución: | Universidad Peruana de Ciencias Aplicadas |
Repositorio: | UPC-Institucional |
Lenguaje: | inglés |
OAI Identifier: | oai:repositorioacademico.upc.edu.pe:10757/673027 |
Enlace del recurso: | http://hdl.handle.net/10757/673027 |
Nivel de acceso: | acceso embargado |
Materia: | accidents construction continuous improvement Deming's cycle PDCA cycle scaffolding |
id |
UUPC_46df372c75736b16f43e9f52c86ac507 |
---|---|
oai_identifier_str |
oai:repositorioacademico.upc.edu.pe:10757/673027 |
network_acronym_str |
UUPC |
network_name_str |
UPC-Institucional |
repository_id_str |
2670 |
dc.title.es_PE.fl_str_mv |
Proposal for the implementation of a safety plan integrating the Deming cycle to minimize scaffolding accidents at height in a multifamily building |
title |
Proposal for the implementation of a safety plan integrating the Deming cycle to minimize scaffolding accidents at height in a multifamily building |
spellingShingle |
Proposal for the implementation of a safety plan integrating the Deming cycle to minimize scaffolding accidents at height in a multifamily building Palomino, Anthony Edwards Arroyo accidents construction continuous improvement Deming's cycle PDCA cycle scaffolding |
title_short |
Proposal for the implementation of a safety plan integrating the Deming cycle to minimize scaffolding accidents at height in a multifamily building |
title_full |
Proposal for the implementation of a safety plan integrating the Deming cycle to minimize scaffolding accidents at height in a multifamily building |
title_fullStr |
Proposal for the implementation of a safety plan integrating the Deming cycle to minimize scaffolding accidents at height in a multifamily building |
title_full_unstemmed |
Proposal for the implementation of a safety plan integrating the Deming cycle to minimize scaffolding accidents at height in a multifamily building |
title_sort |
Proposal for the implementation of a safety plan integrating the Deming cycle to minimize scaffolding accidents at height in a multifamily building |
author |
Palomino, Anthony Edwards Arroyo |
author_facet |
Palomino, Anthony Edwards Arroyo Paima, Kristhofer Raul Maldonado Castaneda, Humberto Ramirez |
author_role |
author |
author2 |
Paima, Kristhofer Raul Maldonado Castaneda, Humberto Ramirez |
author2_role |
author author |
dc.contributor.author.fl_str_mv |
Palomino, Anthony Edwards Arroyo Paima, Kristhofer Raul Maldonado Castaneda, Humberto Ramirez |
dc.subject.es_PE.fl_str_mv |
accidents construction continuous improvement Deming's cycle PDCA cycle scaffolding |
topic |
accidents construction continuous improvement Deming's cycle PDCA cycle scaffolding |
description |
The article below presents the application of a safety plan based on the Deming cycle, also known as the PDCA (Plan, Do, Check, Act) cycle, the objective of the research is to minimize scaffolding fall from height accidents in the construction industry workplace. This methodology is effective in improving the quality and productivity of various processes through a continuous improvement approach. The application will be carried out through a series of surveys of workers in a construction company.The implementation process begins with a planning phase in which goals and objectives to reduce scaffolding accidents are defined. The next phase is Doing, in which the designed safety plan is put into practice. Safety measures for scaffolding, personnel training, etc. are implemented. In the third phase of verification, the results of the measures adopted are evaluated, analyzing the data collected in the previous phase to check whether the proposed objectives have been achieved. Finally, in the action phase, measures are adopted on the basis of the results and analysis of the verification phase. If the objectives have been achieved, the measures are implemented on an ongoing basis. If not, areas for improvement are identified and a new action plan is developed to address them. The cycle is continuously repeated and lessons learned are applied in each iteration. Consistent and systematic application of the Deming cycle leads to a gradual improvement in scaffolding safety, thereby reducing the number of accidents caused by falls and contributing to a safer working environment. |
publishDate |
2023 |
dc.date.accessioned.none.fl_str_mv |
2024-03-12T15:17:06Z |
dc.date.available.none.fl_str_mv |
2024-03-12T15:17:06Z |
dc.date.issued.fl_str_mv |
2023-01-01 |
dc.type.es_PE.fl_str_mv |
info:eu-repo/semantics/article |
format |
article |
dc.identifier.doi.none.fl_str_mv |
10.1109/CONIITI61170.2023.10324183 |
dc.identifier.uri.none.fl_str_mv |
http://hdl.handle.net/10757/673027 |
dc.identifier.journal.es_PE.fl_str_mv |
2023 9th International Conference on Innovation and Trends in Engineering, CONIITI 2023 - Proceedings |
dc.identifier.eid.none.fl_str_mv |
2-s2.0-85179555079 |
dc.identifier.scopusid.none.fl_str_mv |
SCOPUS_ID:85179555079 |
dc.identifier.isni.none.fl_str_mv |
0000 0001 2196 144X |
identifier_str_mv |
10.1109/CONIITI61170.2023.10324183 2023 9th International Conference on Innovation and Trends in Engineering, CONIITI 2023 - Proceedings 2-s2.0-85179555079 SCOPUS_ID:85179555079 0000 0001 2196 144X |
url |
http://hdl.handle.net/10757/673027 |
dc.language.iso.es_PE.fl_str_mv |
eng |
language |
eng |
dc.rights.es_PE.fl_str_mv |
info:eu-repo/semantics/embargoedAccess |
eu_rights_str_mv |
embargoedAccess |
dc.format.es_PE.fl_str_mv |
application/html |
dc.publisher.es_PE.fl_str_mv |
Institute of Electrical and Electronics Engineers Inc. |
dc.source.none.fl_str_mv |
reponame:UPC-Institucional instname:Universidad Peruana de Ciencias Aplicadas instacron:UPC |
instname_str |
Universidad Peruana de Ciencias Aplicadas |
instacron_str |
UPC |
institution |
UPC |
reponame_str |
UPC-Institucional |
collection |
UPC-Institucional |
dc.source.journaltitle.none.fl_str_mv |
2023 9th International Conference on Innovation and Trends in Engineering, CONIITI 2023 - Proceedings |
bitstream.url.fl_str_mv |
https://repositorioacademico.upc.edu.pe/bitstream/10757/673027/1/license.txt |
bitstream.checksum.fl_str_mv |
8a4605be74aa9ea9d79846c1fba20a33 |
bitstream.checksumAlgorithm.fl_str_mv |
MD5 |
repository.name.fl_str_mv |
Repositorio académico upc |
repository.mail.fl_str_mv |
upc@openrepository.com |
_version_ |
1837186886723960832 |
spelling |
4c2db70bacbf4a35d0a7941ba0f84386300e4d1e4d315f3f1f918da5bf82ff4b5ad30095e902c391194c7a34833fcabd7c1569300Palomino, Anthony Edwards ArroyoPaima, Kristhofer Raul MaldonadoCastaneda, Humberto Ramirez2024-03-12T15:17:06Z2024-03-12T15:17:06Z2023-01-0110.1109/CONIITI61170.2023.10324183http://hdl.handle.net/10757/6730272023 9th International Conference on Innovation and Trends in Engineering, CONIITI 2023 - Proceedings2-s2.0-85179555079SCOPUS_ID:851795550790000 0001 2196 144XThe article below presents the application of a safety plan based on the Deming cycle, also known as the PDCA (Plan, Do, Check, Act) cycle, the objective of the research is to minimize scaffolding fall from height accidents in the construction industry workplace. This methodology is effective in improving the quality and productivity of various processes through a continuous improvement approach. The application will be carried out through a series of surveys of workers in a construction company.The implementation process begins with a planning phase in which goals and objectives to reduce scaffolding accidents are defined. The next phase is Doing, in which the designed safety plan is put into practice. Safety measures for scaffolding, personnel training, etc. are implemented. In the third phase of verification, the results of the measures adopted are evaluated, analyzing the data collected in the previous phase to check whether the proposed objectives have been achieved. Finally, in the action phase, measures are adopted on the basis of the results and analysis of the verification phase. If the objectives have been achieved, the measures are implemented on an ongoing basis. If not, areas for improvement are identified and a new action plan is developed to address them. The cycle is continuously repeated and lessons learned are applied in each iteration. Consistent and systematic application of the Deming cycle leads to a gradual improvement in scaffolding safety, thereby reducing the number of accidents caused by falls and contributing to a safer working environment.ODS 3: Salud y BienestarODS 8: Trabajo Decente y Crecimiento EconómicoODS 11: Ciudades y Comunidades Sosteniblesapplication/htmlengInstitute of Electrical and Electronics Engineers Inc.info:eu-repo/semantics/embargoedAccessaccidentsconstructioncontinuous improvementDeming's cyclePDCA cyclescaffoldingProposal for the implementation of a safety plan integrating the Deming cycle to minimize scaffolding accidents at height in a multifamily buildinginfo:eu-repo/semantics/article2023 9th International Conference on Innovation and Trends in Engineering, CONIITI 2023 - Proceedingsreponame:UPC-Institucionalinstname:Universidad Peruana de Ciencias Aplicadasinstacron:UPCLICENSElicense.txtlicense.txttext/plain; charset=utf-81748https://repositorioacademico.upc.edu.pe/bitstream/10757/673027/1/license.txt8a4605be74aa9ea9d79846c1fba20a33MD51false10757/673027oai:repositorioacademico.upc.edu.pe:10757/6730272024-07-20 04:25:09.384Repositorio académico upcupc@openrepository.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 |
score |
13.7211075 |
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).