Proposal for the implementation of a safety plan integrating the Deming cycle to minimize scaffolding accidents at height in a multifamily building

Descripción del Articulo

The article below presents the application of a safety plan based on the Deming cycle, also known as the PDCA (Plan, Do, Check, Act) cycle, the objective of the research is to minimize scaffolding fall from height accidents in the construction industry workplace. This methodology is effective in imp...

Descripción completa

Detalles Bibliográficos
Autores: Palomino, Anthony Edwards Arroyo, Paima, Kristhofer Raul Maldonado, Castaneda, Humberto Ramirez
Formato: artículo
Fecha de Publicación:2023
Institución:Universidad Peruana de Ciencias Aplicadas
Repositorio:UPC-Institucional
Lenguaje:inglés
OAI Identifier:oai:repositorioacademico.upc.edu.pe:10757/673027
Enlace del recurso:http://hdl.handle.net/10757/673027
Nivel de acceso:acceso embargado
Materia:accidents
construction
continuous improvement
Deming's cycle
PDCA cycle
scaffolding
Descripción
Sumario:The article below presents the application of a safety plan based on the Deming cycle, also known as the PDCA (Plan, Do, Check, Act) cycle, the objective of the research is to minimize scaffolding fall from height accidents in the construction industry workplace. This methodology is effective in improving the quality and productivity of various processes through a continuous improvement approach. The application will be carried out through a series of surveys of workers in a construction company.The implementation process begins with a planning phase in which goals and objectives to reduce scaffolding accidents are defined. The next phase is Doing, in which the designed safety plan is put into practice. Safety measures for scaffolding, personnel training, etc. are implemented. In the third phase of verification, the results of the measures adopted are evaluated, analyzing the data collected in the previous phase to check whether the proposed objectives have been achieved. Finally, in the action phase, measures are adopted on the basis of the results and analysis of the verification phase. If the objectives have been achieved, the measures are implemented on an ongoing basis. If not, areas for improvement are identified and a new action plan is developed to address them. The cycle is continuously repeated and lessons learned are applied in each iteration. Consistent and systematic application of the Deming cycle leads to a gradual improvement in scaffolding safety, thereby reducing the number of accidents caused by falls and contributing to a safer working environment.
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).