Reducing Subcontractor Progress Monitoring Time on Multifamily Building Finishes Using a BIM-Based Procedure

Descripción del Articulo

In multifamily project construction, specialty subcontracting is common, but monitoring subcontractors, especially during finishing, presents significant challenges due to manual methods that are time consuming, make it difficult to detect deviations, and result in cost overruns and delays. This res...

Descripción completa

Detalles Bibliográficos
Autores: Bazán, Darwin, Díaz, Leonardo, Ulloa, Karem
Formato: artículo
Fecha de Publicación:2025
Institución:Universidad Peruana de Ciencias Aplicadas
Repositorio:UPC-Institucional
Lenguaje:inglés
OAI Identifier:oai:repositorioacademico.upc.edu.pe:10757/687659
Enlace del recurso:http://hdl.handle.net/10757/687659
Nivel de acceso:acceso abierto
Materia:BIM
Construction
Monitoring time
Progress monitoring
Subcontractors
https://purl.org/pe-repo/ocde/ford#2.01.00
Descripción
Sumario:In multifamily project construction, specialty subcontracting is common, but monitoring subcontractors, especially during finishing, presents significant challenges due to manual methods that are time consuming, make it difficult to detect deviations, and result in cost overruns and delays. This research proposes an automated monitoring procedure using a BIM model that integrates tools such as Revit, Navisworks, MS Project and Trimble Connect. The methodology includes four stages: analysis of information through surveys, identification of the traditional procedure in three companies, development of the new automated approach and validation in a pilot project. The results show a 42.4% reduction in daily monitoring time for subcontractors and a 41.4% reduction for technical personnel, in addition to improved access to real-time information. This optimizes coordination, reduces errors and ensures compliance with deadlines, significantly improving resource management in multifamily projects.
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).