Aumento de la Disponibilidad Mediante la Implementación de un Plan de Mantenimiento Preventivo a las Maquinarias de la Empresa Atlanta Metal drill s.a.c.
Descripción del Articulo
        This research paper describes the implementation of a preventive maintenance plan for the critical machines and equipment involved in the production process of the Atlanta Metal Drill SAC company, guaranteeing an increase in the operational availability of the equipment of the workshop Of the compan...
              
            
    
                        | Autor: | |
|---|---|
| Formato: | tesis de grado | 
| Fecha de Publicación: | 2018 | 
| Institución: | Universidad Nacional de Trujillo | 
| Repositorio: | UNITRU-Tesis | 
| Lenguaje: | español | 
| OAI Identifier: | oai:dspace.unitru.edu.pe:20.500.14414/10142 | 
| Enlace del recurso: | https://hdl.handle.net/20.500.14414/10142 | 
| Nivel de acceso: | acceso abierto | 
| Materia: | Mantenimiento preventivo | 
| Sumario: | This research paper describes the implementation of a preventive maintenance plan for the critical machines and equipment involved in the production process of the Atlanta Metal Drill SAC company, guaranteeing an increase in the operational availability of the equipment of the workshop Of the company, in an efficient and safe way. In order to meet this objective, it was necessary to collect information on the history of failure times of all the machines in the area of master, being a total of 23 machines with which the company has such as lathes, milling machines, boring machines, welding machines, Compressors, crane bridges and drills. The machines under study were subjected to a criticality analysis, resulting in four critical machines due to their higher incidence of failures: vertical lathe lathe lathe and boring machine. The maintenance indicators were then calculated, obtaining a low availability, but after the implementation of the preventive maintenance plan, it was possible to increase the availability of critical machines by more than 10%, ie the parallel lathe From 83.33% to 93.84%; The milling machine from 84.72% to 94.79% and the boring machine from 86.97 to 96.96, thus improving the performance of the machines. Through the development of the methodology for the preventive maintenance plan throughout the development of the thesis were determined the following basic points such as  Maintenance indicators  Comparison of maintenance indicators  Economic evaluation to determine that the development of this thesis through the preventive maintenance plan is really feasible | 
|---|
 Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
    La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).