Mejora en la disposición de planta de la empresa Ingeniería, Fabricación y Montaje S.A.C.
Descripción del Articulo
The present research seeks to find an improvement that optimizes the production process through a proper relocation of work areas and equipment, and thus facilitate efficient performance and increase the productivity of the company. In Chapter I, a current description of the company is made, with a...
| Autores: | , |
|---|---|
| Formato: | tesis de grado |
| Fecha de Publicación: | 2017 |
| Institución: | Universidad de Lima |
| Repositorio: | ULIMA-Institucional |
| Lenguaje: | español |
| OAI Identifier: | oai:repositorio.ulima.edu.pe:20.500.12724/17497 |
| Enlace del recurso: | https://hdl.handle.net/20.500.12724/17497 |
| Nivel de acceso: | acceso abierto |
| Materia: | Industrial buildings Productivity Work environment Edificios industriales Productividad Condiciones de trabajo https://purl.org/pe-repo/ocde/ford#2.11.04 |
| id |
RULI_5db1eed7bd42d474a7bc093bdbfc9d3a |
|---|---|
| oai_identifier_str |
oai:repositorio.ulima.edu.pe:20.500.12724/17497 |
| network_acronym_str |
RULI |
| network_name_str |
ULIMA-Institucional |
| repository_id_str |
3883 |
| dc.title.es_PE.fl_str_mv |
Mejora en la disposición de planta de la empresa Ingeniería, Fabricación y Montaje S.A.C. |
| dc.title.alternative.en_EN.fl_str_mv |
Improvement in the plant layout of the Manufacturing and Assembly Engineering Company |
| title |
Mejora en la disposición de planta de la empresa Ingeniería, Fabricación y Montaje S.A.C. |
| spellingShingle |
Mejora en la disposición de planta de la empresa Ingeniería, Fabricación y Montaje S.A.C. Campana Chavez, Jimena Carolina Industrial buildings Industrial buildings Productivity Work environment Edificios industriales Productividad Condiciones de trabajo https://purl.org/pe-repo/ocde/ford#2.11.04 |
| title_short |
Mejora en la disposición de planta de la empresa Ingeniería, Fabricación y Montaje S.A.C. |
| title_full |
Mejora en la disposición de planta de la empresa Ingeniería, Fabricación y Montaje S.A.C. |
| title_fullStr |
Mejora en la disposición de planta de la empresa Ingeniería, Fabricación y Montaje S.A.C. |
| title_full_unstemmed |
Mejora en la disposición de planta de la empresa Ingeniería, Fabricación y Montaje S.A.C. |
| title_sort |
Mejora en la disposición de planta de la empresa Ingeniería, Fabricación y Montaje S.A.C. |
| author |
Campana Chavez, Jimena Carolina |
| author_facet |
Campana Chavez, Jimena Carolina Carbajal Chu, Nicole Astrid |
| author_role |
author |
| author2 |
Carbajal Chu, Nicole Astrid |
| author2_role |
author |
| dc.contributor.advisor.fl_str_mv |
Almandoz Núñez, Ana María |
| dc.contributor.author.fl_str_mv |
Campana Chavez, Jimena Carolina Carbajal Chu, Nicole Astrid |
| dc.subject.en_EN.fl_str_mv |
Industrial buildings Industrial buildings Productivity Work environment |
| topic |
Industrial buildings Industrial buildings Productivity Work environment Edificios industriales Productividad Condiciones de trabajo https://purl.org/pe-repo/ocde/ford#2.11.04 |
| dc.subject.es_PE.fl_str_mv |
Edificios industriales Productividad Condiciones de trabajo |
| dc.subject.ocde.none.fl_str_mv |
https://purl.org/pe-repo/ocde/ford#2.11.04 |
| description |
The present research seeks to find an improvement that optimizes the production process through a proper relocation of work areas and equipment, and thus facilitate efficient performance and increase the productivity of the company. In Chapter I, a current description of the company is made, with a brief historical review of it and also referring to the products they offer. In addition, as an important part of the research, the objectives, the technical, economic and social justifications, the work hypothesis and the reference framework that served as support for the research are presented. In Chapter II, an analysis of the competitive forces and external forces is developed, as well as a description of the main product process the company offers, in this case the dryer. In addition, the main management indicators are shown. In Chapter III, a general diagnosis of the company was made. A matrix of problem selection was used, which was developed with the general manager. From there, the main problem that was found in the area of production and Is the inadequate plant layout, and thus using the Ishikawa method, the root causes of the problem were determined, which are hierarchized by means of the Pareto Diagram. Chapter IV proposes alternatives to solve the problems identified in the previous chapter, where the best solutions were selected through a factor ranking. In Chapter V, the procedures for each solution selected in the previous chapter are described in detail, and most of the engineering tools related to the topic are used. The general budget required for the execution of the solution is presented. In addition, a schedule is detailed in a Gantt Diagram the tasks to be performed step by step in order to comply with the entire implementation of the improvements. Chapter VI identified potential scenarios for planned improvements and a financial economic evaluation of the solution is made. In addition, the social and environmental impacts that bring about the improvements of the company are presented. |
| publishDate |
2017 |
| dc.date.accessioned.none.fl_str_mv |
2023-01-26T17:08:30Z |
| dc.date.available.none.fl_str_mv |
2023-01-26T17:08:30Z |
| dc.date.issued.fl_str_mv |
2017 |
| dc.type.none.fl_str_mv |
info:eu-repo/semantics/bachelorThesis |
| dc.type.other.none.fl_str_mv |
Trabajo de investigación |
| format |
bachelorThesis |
| dc.identifier.citation.es_PE.fl_str_mv |
Campana Chavez, J. C. & Carbajal Chu, N. A. (2017). Mejora en la disposición de planta de la empresa Ingeniería, Fabricación y Montaje S.A.C. [Trabajo de investigación para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/17497 |
| dc.identifier.uri.none.fl_str_mv |
https://hdl.handle.net/20.500.12724/17497 |
| identifier_str_mv |
Campana Chavez, J. C. & Carbajal Chu, N. A. (2017). Mejora en la disposición de planta de la empresa Ingeniería, Fabricación y Montaje S.A.C. [Trabajo de investigación para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/17497 |
| url |
https://hdl.handle.net/20.500.12724/17497 |
| dc.language.iso.none.fl_str_mv |
spa |
| language |
spa |
| dc.relation.ispartof.fl_str_mv |
SUNEDU |
| dc.rights.*.fl_str_mv |
info:eu-repo/semantics/openAccess |
| dc.rights.uri.*.fl_str_mv |
https://creativecommons.org/licenses/by-nc-sa/4.0/ |
| eu_rights_str_mv |
openAccess |
| rights_invalid_str_mv |
https://creativecommons.org/licenses/by-nc-sa/4.0/ |
| dc.format.none.fl_str_mv |
application/pdf |
| dc.publisher.none.fl_str_mv |
Universidad de Lima |
| dc.publisher.country.none.fl_str_mv |
PE |
| publisher.none.fl_str_mv |
Universidad de Lima |
| dc.source.none.fl_str_mv |
Repositorio Institucional - Ulima Universidad de Lima reponame:ULIMA-Institucional instname:Universidad de Lima instacron:ULIMA |
| instname_str |
Universidad de Lima |
| instacron_str |
ULIMA |
| institution |
ULIMA |
| reponame_str |
ULIMA-Institucional |
| collection |
ULIMA-Institucional |
| bitstream.url.fl_str_mv |
https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/5/Campana-Carbajal_Mejora-disposicion-planta-empresa.pdf.jpg https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/10/FA-46696184_SR.pdf.jpg https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/12/FA-45652417_SR.pdf.jpg https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/14/TURNITIN_CAMPANA%20CHAVEZ%20JIMENA%20CAROLINA_20081266.pdf.jpg https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/4/Campana-Carbajal_Mejora-disposicion-planta-empresa.pdf.txt https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/9/FA-46696184_SR.pdf.txt https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/11/FA-45652417_SR.pdf.txt https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/13/TURNITIN_CAMPANA%20CHAVEZ%20JIMENA%20CAROLINA_20081266.pdf.txt https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/1/Campana-Carbajal_Mejora-disposicion-planta-empresa.pdf https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/6/FA-46696184_SR.pdf https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/7/FA-45652417_SR.pdf https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/8/TURNITIN_CAMPANA%20CHAVEZ%20JIMENA%20CAROLINA_20081266.pdf https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/2/license_rdf https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/3/license.txt |
| bitstream.checksum.fl_str_mv |
36d305ae7c098c890be79a35bd220ead 0f73424d52efb09ea295f30fe6b78ff3 05df8db35b56f56fd1dc480701dc9100 19484f33aa686c23b721de5231250500 64513214e55342463a23b822fb534179 4e1a71511f7c88156b950d8218ff208c 71747cf26bb076fb72543c7a29f0b04c 93314dce4ee30a3745919f7870388445 ec8b1467e56d0c58ae67f01256fe375f d148fa5063b4712963e849ba30b44626 a6901c15363065d334bacb4747f6b24e 56be821bf475c331a6a78a202c955b1e 3655808e5dd46167956d6870b0f43800 8a4605be74aa9ea9d79846c1fba20a33 |
| bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 MD5 |
| repository.name.fl_str_mv |
Repositorio Universidad de Lima |
| repository.mail.fl_str_mv |
repositorio@ulima.edu.pe |
| _version_ |
1852319747593469952 |
| spelling |
Almandoz Núñez, Ana MaríaCampana Chavez, Jimena CarolinaCarbajal Chu, Nicole Astrid2023-01-26T17:08:30Z2023-01-26T17:08:30Z2017Campana Chavez, J. C. & Carbajal Chu, N. A. (2017). Mejora en la disposición de planta de la empresa Ingeniería, Fabricación y Montaje S.A.C. [Trabajo de investigación para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/17497https://hdl.handle.net/20.500.12724/17497The present research seeks to find an improvement that optimizes the production process through a proper relocation of work areas and equipment, and thus facilitate efficient performance and increase the productivity of the company. In Chapter I, a current description of the company is made, with a brief historical review of it and also referring to the products they offer. In addition, as an important part of the research, the objectives, the technical, economic and social justifications, the work hypothesis and the reference framework that served as support for the research are presented. In Chapter II, an analysis of the competitive forces and external forces is developed, as well as a description of the main product process the company offers, in this case the dryer. In addition, the main management indicators are shown. In Chapter III, a general diagnosis of the company was made. A matrix of problem selection was used, which was developed with the general manager. From there, the main problem that was found in the area of production and Is the inadequate plant layout, and thus using the Ishikawa method, the root causes of the problem were determined, which are hierarchized by means of the Pareto Diagram. Chapter IV proposes alternatives to solve the problems identified in the previous chapter, where the best solutions were selected through a factor ranking. In Chapter V, the procedures for each solution selected in the previous chapter are described in detail, and most of the engineering tools related to the topic are used. The general budget required for the execution of the solution is presented. In addition, a schedule is detailed in a Gantt Diagram the tasks to be performed step by step in order to comply with the entire implementation of the improvements. Chapter VI identified potential scenarios for planned improvements and a financial economic evaluation of the solution is made. In addition, the social and environmental impacts that bring about the improvements of the company are presented.La presente investigación busca encontrar una mejora que maximice el rendimiento del proceso de producción mediante una adecuada reubicación de las áreas de trabajo y equipos, y de esa manera facilitar el desempeño eficiente e incrementar así la productividad de la empresa. Esta propuesta de mejora se desarrollará en seis capítulos que proponen un análisis de la organización, estableciendo alternativas de solución que ayuden a remediar la problemática encontrada referida a la inadecuada disposición de planta. En el capítulo I, se hace una descripción actual de la empresa, con una breve reseña histórica de la misma y también referente a los productos que ofrecen. Adicionalmente como parte importante de la investigación, se dan a conocer los objetivos, las justificaciones técnicas, económicas y sociales, la hipótesis del trabajo y el marco referencial que sirvió como apoyo para la investigación. En el capítulo II, se desarrolla un análisis de las fuerzas competitivas y fuerzas externas, también una descripción del proceso del producto principal que la empresa ofrece, en este caso el secador. Adicionalmente se muestran los principales indicadores de gestión. En el capítulo III, se realiza un diagnóstico general de la empresa, para ello se utilizó una matriz de selección de problemas, la cual fue desarrollada con el Gerente General, luego se seleccionó el problema principal que se encontró en el área de producción y es la inadecuada disposición de planta, y así haciendo uso del método de Ishikawa, se determinaron las causas raíz del problema encontrado, las cuales se jerarquizan por medio del Diagrama de Pareto. En el capítulo IV, se proponen alternativas de solución a los problemas que se determinaron en el capítulo anterior, donde se seleccionaron las mejores soluciones por medio de un ranking de factores. En el capítulo V, se describen detalladamente los procedimientos a cada solución seleccionada en el capítulo anterior y se emplean muchas de las herramientas de ingeniería relacionadas al tema. Se presenta el presupuesto general requerido para la xii ejecución de la solución. Además, se detallan en un cronograma por medio de un Diagrama de Gantt las tareas a realizarse paso a paso con el fin de cumplir con la totalidad de la implementación de las mejoras. En el capítulo VI, se determinaron los posibles escenarios de las mejoras planeadas; y se realiza una evaluación económica financiera de la solución. Además, se presentan los impactos sociales y ambientales que conllevan las mejoras de la empresa.application/pdfspaUniversidad de LimaPEinfo:eu-repo/semantics/openAccesshttps://creativecommons.org/licenses/by-nc-sa/4.0/Repositorio Institucional - UlimaUniversidad de Limareponame:ULIMA-Institucionalinstname:Universidad de Limainstacron:ULIMAIndustrial buildingsIndustrial buildingsProductivityWork environmentEdificios industrialesProductividadCondiciones de trabajohttps://purl.org/pe-repo/ocde/ford#2.11.04Mejora en la disposición de planta de la empresa Ingeniería, Fabricación y Montaje S.A.C.Improvement in the plant layout of the Manufacturing and Assembly Engineering Companyinfo:eu-repo/semantics/bachelorThesisTrabajo de investigaciónSUNEDUTítulo ProfesionalIngeniería IndustrialUniversidad de Lima. Facultad de Ingeniería y ArquitecturaIngeniero Industrialhttps://orcid.org/0000-0002-9139-1099091650147220264669618445652417https://purl.org/pe-repo/renati/level#tituloProfesionalArroyo Gordillo, Pedro AntonioAlmandoz Núñez, Ana MaríaUgarte Gomez, José LuisMontoya Barragán, Jorge Alfredohttps://purl.org/pe-repo/renati/type#trabajoDeInvestigacion9THUMBNAILCampana-Carbajal_Mejora-disposicion-planta-empresa.pdf.jpgCampana-Carbajal_Mejora-disposicion-planta-empresa.pdf.jpgGenerated Thumbnailimage/jpeg11413https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/5/Campana-Carbajal_Mejora-disposicion-planta-empresa.pdf.jpg36d305ae7c098c890be79a35bd220eadMD55FA-46696184_SR.pdf.jpgFA-46696184_SR.pdf.jpgGenerated Thumbnailimage/jpeg13093https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/10/FA-46696184_SR.pdf.jpg0f73424d52efb09ea295f30fe6b78ff3MD510FA-45652417_SR.pdf.jpgFA-45652417_SR.pdf.jpgGenerated Thumbnailimage/jpeg12001https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/12/FA-45652417_SR.pdf.jpg05df8db35b56f56fd1dc480701dc9100MD512TURNITIN_CAMPANA CHAVEZ JIMENA CAROLINA_20081266.pdf.jpgTURNITIN_CAMPANA CHAVEZ JIMENA CAROLINA_20081266.pdf.jpgGenerated Thumbnailimage/jpeg10367https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/14/TURNITIN_CAMPANA%20CHAVEZ%20JIMENA%20CAROLINA_20081266.pdf.jpg19484f33aa686c23b721de5231250500MD514TEXTCampana-Carbajal_Mejora-disposicion-planta-empresa.pdf.txtCampana-Carbajal_Mejora-disposicion-planta-empresa.pdf.txtExtracted texttext/plain145492https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/4/Campana-Carbajal_Mejora-disposicion-planta-empresa.pdf.txt64513214e55342463a23b822fb534179MD54FA-46696184_SR.pdf.txtFA-46696184_SR.pdf.txtExtracted texttext/plain1353https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/9/FA-46696184_SR.pdf.txt4e1a71511f7c88156b950d8218ff208cMD59FA-45652417_SR.pdf.txtFA-45652417_SR.pdf.txtExtracted texttext/plain1443https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/11/FA-45652417_SR.pdf.txt71747cf26bb076fb72543c7a29f0b04cMD511TURNITIN_CAMPANA CHAVEZ JIMENA CAROLINA_20081266.pdf.txtTURNITIN_CAMPANA CHAVEZ JIMENA CAROLINA_20081266.pdf.txtExtracted texttext/plain2007https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/13/TURNITIN_CAMPANA%20CHAVEZ%20JIMENA%20CAROLINA_20081266.pdf.txt93314dce4ee30a3745919f7870388445MD513ORIGINALCampana-Carbajal_Mejora-disposicion-planta-empresa.pdfCampana-Carbajal_Mejora-disposicion-planta-empresa.pdfTrabajo de investigaciónapplication/pdf3169669https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/1/Campana-Carbajal_Mejora-disposicion-planta-empresa.pdfec8b1467e56d0c58ae67f01256fe375fMD51FA-46696184_SR.pdfFA-46696184_SR.pdfAutorizaciónapplication/pdf571126https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/6/FA-46696184_SR.pdfd148fa5063b4712963e849ba30b44626MD56FA-45652417_SR.pdfFA-45652417_SR.pdfAutorizaciónapplication/pdf570730https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/7/FA-45652417_SR.pdfa6901c15363065d334bacb4747f6b24eMD57TURNITIN_CAMPANA CHAVEZ JIMENA CAROLINA_20081266.pdfTURNITIN_CAMPANA CHAVEZ JIMENA CAROLINA_20081266.pdfReporte de similitudapplication/pdf27795465https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/8/TURNITIN_CAMPANA%20CHAVEZ%20JIMENA%20CAROLINA_20081266.pdf56be821bf475c331a6a78a202c955b1eMD58CC-LICENSElicense_rdflicense_rdfapplication/rdf+xml; charset=utf-8811https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/2/license_rdf3655808e5dd46167956d6870b0f43800MD52LICENSElicense.txtlicense.txttext/plain; charset=utf-81748https://repositorio.ulima.edu.pe/bitstream/20.500.12724/17497/3/license.txt8a4605be74aa9ea9d79846c1fba20a33MD5320.500.12724/17497oai:repositorio.ulima.edu.pe:20.500.12724/174972024-11-11 13:11:52.964Repositorio Universidad de Limarepositorio@ulima.edu.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 |
| score |
12.858393 |
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).