Estudio de prefactibilidad para la instalación de una planta productora de fosfato diamónico para el mercado de la selva

Descripción del Articulo

The purpose of this research work is to determine the feasibility or not of installing a Diammonium Phosphate Production Plant (the most commercialized phosphate fertilizer in the world) to satisfy the Peruvian jungle market. Next, we will briefly detail the contents and results obtained in the most...

Descripción completa

Detalles Bibliográficos
Autores: Azama Higa, Guillermo Shoei, Rodriguez Carhuaz, Elvis Antony
Formato: tesis de grado
Fecha de Publicación:2021
Institución:Universidad de Lima
Repositorio:ULIMA-Institucional
Lenguaje:español
OAI Identifier:oai:repositorio.ulima.edu.pe:20.500.12724/13136
Enlace del recurso:https://hdl.handle.net/20.500.12724/13136
Nivel de acceso:acceso abierto
Materia:Industria de fertilizantes
Estudios de factibilidad
https://purl.org/pe-repo/ocde/ford#2.11.04
Descripción
Sumario:The purpose of this research work is to determine the feasibility or not of installing a Diammonium Phosphate Production Plant (the most commercialized phosphate fertilizer in the world) to satisfy the Peruvian jungle market. Next, we will briefly detail the contents and results obtained in the most important chapters of the research carried out. Firstly, in the market study chapter, we will show the projected demand for the years of application of the Project from 2020 to 2024, where we obtain a demand in the last year of 67,869 50kg bags of the Product. In the plant location chapter we will show the most relevant locations to install the factory, making evaluations with various factors, both objective and subjective, where we obtain as strategic location the region and province of Piura. In the chapter of plant size, we will see the factors that limit the established, where for the present investigation will be limited by the size-market. In the project engineering chapter, we define the product technically, as well as the production processes and the machines necessary to manufacture our product. In addition, we emphasize the environmental, quality, maintenance and occupational health and safety management that will be performed within the production plant, which covers an area of 4,924.50 m2. In the organization and administration chapter, we define the organizational structure within the industrial company and the tasks performed by each of the 26 collaborators, as well as the purpose of the company and the values instilled within it. Finally, in the budget chapter, we will detail the economic and financial viability through indicators such as NPV S/ 200,564, EIRR 24.10%, NPV S/ 655,861 and EIRR 29.99% for the implementation of the industrial plant, as well as the benefits that would be generated to the shareholders and the socioeconomic impacts in the area of influence of the Project.
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).