Implementation of Lean Construction as a Solution for the Covid-19 Impacts in Residential Construction Projects in Lima, Peru

Descripción del Articulo

At the beginning of 2020, a virus discovered in the province of Wuhan in China identified as SARS- COV-2, denominated COVID-19, began to spread globally, being identified by the World Health Organization (WHO) as a pandemic on March 13 since the epidemic has spread to several countries in all the co...

Descripción completa

Detalles Bibliográficos
Autores: Verán-Leigh, Daniel, Brioso, Xavier
Formato: objeto de conferencia
Fecha de Publicación:2021
Institución:Pontificia Universidad Católica del Perú
Repositorio:PUCP-Institucional
Lenguaje:español
OAI Identifier:oai:repositorio.pucp.edu.pe:20.500.14657/198961
Enlace del recurso:https://repositorio.pucp.edu.pe/index/handle/123456789/198961
https://doi.org/10.24928/2021/0215
Nivel de acceso:acceso abierto
Materia:COVID-19
Lean construction
Last Planner® System
Construction system
https://purl.org/pe-repo/ocde/ford#2.01.01
id RPUC_6fdbb881714329baa38060a1881d905f
oai_identifier_str oai:repositorio.pucp.edu.pe:20.500.14657/198961
network_acronym_str RPUC
network_name_str PUCP-Institucional
repository_id_str 2905
spelling Verán-Leigh, DanielBrioso, XavierPontificia Universidad Católica del Perú2024-03-15T20:58:32Z2024-03-15T20:58:32Z2021https://repositorio.pucp.edu.pe/index/handle/123456789/198961https://doi.org/10.24928/2021/0215At the beginning of 2020, a virus discovered in the province of Wuhan in China identified as SARS- COV-2, denominated COVID-19, began to spread globally, being identified by the World Health Organization (WHO) as a pandemic on March 13 since the epidemic has spread to several countries in all the continents and affects a large number of people (WHO 2020). In Peru the entry of COVID-19 caused the Peruvian government to take different options to control its spread such as mandatory quarantines and lockdowns. In front of this scenario, the Architecture Engineering and Construction (AEC) sector had to reinvent itself since it is a sector where work depends on a significant amount of personnel (IPE 2020). Furthermore, the level of industrialization in Peru is significantly lower compared with industrialized countries, generating that the consumption of labor is greater as well as the cost of the project, searching for new solutions to improve productivity. Moreover, considering the new sanitary measures for COVID-19 including new health protocols, controls, and improvement of working sanitary standards. Therefore, the main purpose of the present paper is to present a planning proposal for a system that integrates the Lean tools and the COVID-19 protocol for armed concrete buildings in Peru and present the preliminary results of its modification on the production system, design of work schedules, planning meetings, among other aspects of the construction system.spaPontificia Universidad Católica del Perú. Facultad de Arte y DiseñoPEinfo:eu-repo/semantics/openAccesshttp://creativecommons.org/licenses/by-nc-nd/2.5/pe/COVID-19Lean constructionLast Planner® SystemConstruction systemhttps://purl.org/pe-repo/ocde/ford#2.01.01Implementation of Lean Construction as a Solution for the Covid-19 Impacts in Residential Construction Projects in Lima, Peruinfo:eu-repo/semantics/conferenceObjectCongresoJuly 14-17, 202129th Annual Conference of the International Group for Lean Construction (IGLC)Lima, Perureponame:PUCP-Institucionalinstname:Pontificia Universidad Católica del Perúinstacron:PUCPORIGINAL941-950.pdf941-950.pdfTexto completoapplication/pdf511397https://repositorio.pucp.edu.pe/bitstreams/c9ce8688-3035-4bd2-aaa8-33032e9ca904/download5e4aaa5a6c7fa2f49766136c06b9ec1bMD51trueAnonymousREADTHUMBNAIL941-950.pdf.jpg941-950.pdf.jpgIM Thumbnailimage/jpeg39873https://repositorio.pucp.edu.pe/bitstreams/57dd8f87-e519-4463-af29-ed8193fd2448/downloade5e59074085dafa4e33bf51702219108MD52falseAnonymousREAD20.500.14657/198961oai:repositorio.pucp.edu.pe:20.500.14657/1989612024-10-05 12:44:25.485http://creativecommons.org/licenses/by-nc-nd/2.5/pe/info:eu-repo/semantics/openAccessopen.accesshttps://repositorio.pucp.edu.peRepositorio Institucional de la PUCPrepositorio@pucp.pe
dc.title.es_ES.fl_str_mv Implementation of Lean Construction as a Solution for the Covid-19 Impacts in Residential Construction Projects in Lima, Peru
title Implementation of Lean Construction as a Solution for the Covid-19 Impacts in Residential Construction Projects in Lima, Peru
spellingShingle Implementation of Lean Construction as a Solution for the Covid-19 Impacts in Residential Construction Projects in Lima, Peru
Verán-Leigh, Daniel
COVID-19
Lean construction
Last Planner® System
Construction system
https://purl.org/pe-repo/ocde/ford#2.01.01
title_short Implementation of Lean Construction as a Solution for the Covid-19 Impacts in Residential Construction Projects in Lima, Peru
title_full Implementation of Lean Construction as a Solution for the Covid-19 Impacts in Residential Construction Projects in Lima, Peru
title_fullStr Implementation of Lean Construction as a Solution for the Covid-19 Impacts in Residential Construction Projects in Lima, Peru
title_full_unstemmed Implementation of Lean Construction as a Solution for the Covid-19 Impacts in Residential Construction Projects in Lima, Peru
title_sort Implementation of Lean Construction as a Solution for the Covid-19 Impacts in Residential Construction Projects in Lima, Peru
author Verán-Leigh, Daniel
author_facet Verán-Leigh, Daniel
Brioso, Xavier
author_role author
author2 Brioso, Xavier
author2_role author
dc.contributor.corporatename.none.fl_str_mv Pontificia Universidad Católica del Perú
dc.contributor.author.fl_str_mv Verán-Leigh, Daniel
Brioso, Xavier
dc.subject.es_ES.fl_str_mv COVID-19
Lean construction
Last Planner® System
Construction system
topic COVID-19
Lean construction
Last Planner® System
Construction system
https://purl.org/pe-repo/ocde/ford#2.01.01
dc.subject.ocde.es_ES.fl_str_mv https://purl.org/pe-repo/ocde/ford#2.01.01
description At the beginning of 2020, a virus discovered in the province of Wuhan in China identified as SARS- COV-2, denominated COVID-19, began to spread globally, being identified by the World Health Organization (WHO) as a pandemic on March 13 since the epidemic has spread to several countries in all the continents and affects a large number of people (WHO 2020). In Peru the entry of COVID-19 caused the Peruvian government to take different options to control its spread such as mandatory quarantines and lockdowns. In front of this scenario, the Architecture Engineering and Construction (AEC) sector had to reinvent itself since it is a sector where work depends on a significant amount of personnel (IPE 2020). Furthermore, the level of industrialization in Peru is significantly lower compared with industrialized countries, generating that the consumption of labor is greater as well as the cost of the project, searching for new solutions to improve productivity. Moreover, considering the new sanitary measures for COVID-19 including new health protocols, controls, and improvement of working sanitary standards. Therefore, the main purpose of the present paper is to present a planning proposal for a system that integrates the Lean tools and the COVID-19 protocol for armed concrete buildings in Peru and present the preliminary results of its modification on the production system, design of work schedules, planning meetings, among other aspects of the construction system.
publishDate 2021
dc.date.accessioned.none.fl_str_mv 2024-03-15T20:58:32Z
dc.date.available.none.fl_str_mv 2024-03-15T20:58:32Z
dc.date.issued.fl_str_mv 2021
dc.type.none.fl_str_mv info:eu-repo/semantics/conferenceObject
dc.type.other.none.fl_str_mv Congreso
format conferenceObject
dc.identifier.uri.none.fl_str_mv https://repositorio.pucp.edu.pe/index/handle/123456789/198961
dc.identifier.doi.none.fl_str_mv https://doi.org/10.24928/2021/0215
url https://repositorio.pucp.edu.pe/index/handle/123456789/198961
https://doi.org/10.24928/2021/0215
dc.language.iso.es_ES.fl_str_mv spa
language spa
dc.relation.conferencedate.none.fl_str_mv July 14-17, 2021
dc.relation.conferencename.none.fl_str_mv 29th Annual Conference of the International Group for Lean Construction (IGLC)
dc.relation.conferenceplace.none.fl_str_mv Lima, Peru
dc.rights.es_ES.fl_str_mv info:eu-repo/semantics/openAccess
dc.rights.uri.*.fl_str_mv http://creativecommons.org/licenses/by-nc-nd/2.5/pe/
eu_rights_str_mv openAccess
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-nd/2.5/pe/
dc.publisher.es_ES.fl_str_mv Pontificia Universidad Católica del Perú. Facultad de Arte y Diseño
dc.publisher.country.es_ES.fl_str_mv PE
dc.source.none.fl_str_mv reponame:PUCP-Institucional
instname:Pontificia Universidad Católica del Perú
instacron:PUCP
instname_str Pontificia Universidad Católica del Perú
instacron_str PUCP
institution PUCP
reponame_str PUCP-Institucional
collection PUCP-Institucional
bitstream.url.fl_str_mv https://repositorio.pucp.edu.pe/bitstreams/c9ce8688-3035-4bd2-aaa8-33032e9ca904/download
https://repositorio.pucp.edu.pe/bitstreams/57dd8f87-e519-4463-af29-ed8193fd2448/download
bitstream.checksum.fl_str_mv 5e4aaa5a6c7fa2f49766136c06b9ec1b
e5e59074085dafa4e33bf51702219108
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
repository.name.fl_str_mv Repositorio Institucional de la PUCP
repository.mail.fl_str_mv repositorio@pucp.pe
_version_ 1835638821744541696
score 13.979831
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).