Impact of the implementation of the tailings management protocol on tailings dam risk management at Huaron mine, 2021

Descripción del Articulo

The general objective of the study was to determine the impact of the implementation of the tailings management protocol on the risk management of the tailings dam. Methodologically, it was an applied research, explanatory level, non-experimental design, longitudinal section. The sample was six fail...

Descripción completa

Detalles Bibliográficos
Autores: Velásquez Méndez, Erick Jesús, Guadalupe Gómez, Enrique
Formato: artículo
Fecha de Publicación:2023
Institución:Universidad Nacional Mayor de San Marcos
Repositorio:Revistas - Universidad Nacional Mayor de San Marcos
Lenguaje:español
OAI Identifier:oai:ojs.csi.unmsm:article/25998
Enlace del recurso:https://revistasinvestigacion.unmsm.edu.pe/index.php/iigeo/article/view/25998
Nivel de acceso:acceso abierto
Materia:administración
gestión
protocolo
relavera
relaves
riesgos
Management
protocol
risks
tailings
tailings dam
Descripción
Sumario:The general objective of the study was to determine the impact of the implementation of the tailings management protocol on the risk management of the tailings dam. Methodologically, it was an applied research, explanatory level, non-experimental design, longitudinal section. The sample was six failure mode analyses. The results show the difference before and after the implementation of the tailings management protocol; Before implementation the probability of occurrence was rare at 33.3%; and then the probability of occurrence is rare (83.3%). The difference in the consequence of the occurrence of the detected failures is that before implementation, the majority of the detected failures were catastrophic in nature (66.7%); and then in most failures it is (0.00%). And the difference in the level of risk in the tailings dam is that before implementation it was high (33.3%); and then it is high (0.00%). In conclusion, it has been shown that the impact of the implementation of the tailings management protocol is significant in the risk management of the tailings dam at Pan American Silver Huaron, 2021. (p<0.05).
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).