Influence of work systems and lost time in the calculation of equipment for open pit mining of the Antilla deposit, Apurímac

Descripción del Articulo

The Antilla ore body open pit mining equipment is estimated for a total movement of 544 million metric tons of ore and waste in 20 years of active operation. Mining equipment is evaluated from the point of view of 3 working systems and time savings on the performance system. Three working alternativ...

Descripción completa

Detalles Bibliográficos
Autores: Ortiz Sánchez, Oswaldo, Canchari Silverio, Godelia, Giraldo Paredez, Emiliano
Formato: artículo
Fecha de Publicación:2011
Institución:Universidad Nacional Mayor de San Marcos
Repositorio:Revistas - Universidad Nacional Mayor de San Marcos
Lenguaje:español
OAI Identifier:oai:ojs.csi.unmsm:article/668
Enlace del recurso:https://revistasinvestigacion.unmsm.edu.pe/index.php/iigeo/article/view/668
Nivel de acceso:acceso abierto
Materia:Performance parameters
ore reserves
alternatives
equipment
productivity
open pit operation
Parámetros de performance
reservas
alternativas
equipamiento
rendimiento
tajo a cielo abierto
Descripción
Sumario:The Antilla ore body open pit mining equipment is estimated for a total movement of 544 million metric tons of ore and waste in 20 years of active operation. Mining equipment is evaluated from the point of view of 3 working systems and time savings on the performance system. Three working alternatives are analyzed: Alternative 1 consists of three-8 hour shifts per day, six day per week operation. Alternative 2 includes three-8 hour shifts per day, 7 day per week and alternative 3 consists of four-six hour shifts per day 7 day per week work. Equipment size is chosen as a function of daily production, pit geometry, bench height, working angle and space requirements for safe operation of each equipment. Performance parameters used in equipment estimation were taken from 3 similar mining operations. Lost time analysis on the equipment performance were also considered in order to improve utilization of the 4 types of equipment required in the open pit operation.
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).