Pre‐feasibility study and design of a biogas recovery and transport system from the San José (Lambayeque) stabilization ponds towards a power generating station

Descripción del Articulo

The pre‐feasibility study and design of a biogas recovery and transport system for power generation was carried out. The purpose of this study was twofold: to reduce the emissions of greenhouse gases (GHG) produced by the anaerobic lagoons of the San José (Lambayeque) wastewater treatment plant; and...

Descripción completa

Detalles Bibliográficos
Autores: Palacios M., Juan D., Rachi M., José F., Delgado D., Oscar E.
Formato: artículo
Fecha de Publicación:2017
Institución:Universidad Nacional de Ingeniería
Repositorio:Revistas - Universidad Nacional de Ingeniería
Lenguaje:español
OAI Identifier:oai:oai:revistas.uni.edu.pe:article/177
Enlace del recurso:https://revistas.uni.edu.pe/index.php/tecnia/article/view/177
Nivel de acceso:acceso abierto
Materia:captación y transporte de biogás
tratamiento de aguas residuales
pre-factibilidad
mecanismos de desarrollo limpio
biogas recovery and transport
wastewater treatment
pre‐feasibility
clean development mechanism
id REVUNI_79fd0cc48707d9bccf6db879b060bbd0
oai_identifier_str oai:oai:revistas.uni.edu.pe:article/177
network_acronym_str REVUNI
network_name_str Revistas - Universidad Nacional de Ingeniería
repository_id_str
spelling Pre‐feasibility study and design of a biogas recovery and transport system from the San José (Lambayeque) stabilization ponds towards a power generating stationEstudio de pre‐factibilidad y diseño de un sistema de captación y transporte de biogás para generación eléctrica en lagunas de estabilización de San José‐LambayequePalacios M., Juan D.Rachi M., José F.Delgado D., Oscar E.captación y transporte de biogástratamiento de aguas residualespre-factibilidadmecanismos de desarrollo limpiobiogas recovery and transportwastewater treatmentpre‐feasibilityclean development mechanismThe pre‐feasibility study and design of a biogas recovery and transport system for power generation was carried out. The purpose of this study was twofold: to reduce the emissions of greenhouse gases (GHG) produced by the anaerobic lagoons of the San José (Lambayeque) wastewater treatment plant; and to obtain a renewable energy source that could make the plant self‐sustaining. Initially, information on the current state of the system and on the plant operating conditions was collected. Then, after analyzing the data obtained and applying the guidelines of the Inter‐American Development Bank (IDB) for Clean Development Mechanism (CDM) projects, the amounts of GHG emitted in the environment was estimated to 33,885 t CO2e / year. Solutions to the problem were then proposed and, among them, a cover system was considered as the most appropriate. This allowed an estimation of the annual generation potential with the project and the reduction of emissions to 27,620.36 tC02 / year. With the above estimates, a preliminary design of the biogas plant was carried out. Finally, an economic evaluation was completed, giving a Net Present Value (NPV) and an Internal Rate of Return (IRR) that confirmed the pre‐feasibility of the project. Con el objetivo de poder reducir las emisiones de gases de efecto invernadero (GEI) producidas por las lagunas anaerobias de la planta de tratamiento de aguas residuales del distrito de San José en Lambayeque y conseguir una fuente de energía renovable que pueda hacer autosustentable a la planta se realizó el Estudio de pre‐factibilidad y diseño de un sistema de captación y transporte de biogás para la generación eléctrica; inicialmente se observaron y recopilaron datos del estado actual del sistema y las condiciones de la planta, posteriormente mediante el análisis de datos obtenidos y aplicación de lineamientos del Banco Interamericano de Desarrollo (BID) para proyectos de Mecanismos de Desarrollo Limpio (MDL) se buscó estimar las cantidades de GEI emitidas al medio ambiente, siendo estas de 33885,04535 tCO2e/año; se procedió a realizar propuestas de solución al problema; siendo un sistema de cubierta la propuesta considerada más adecuada, después se procedió a estimar la reducción de emisiones con el Proyecto obteniendo 27620,36 tC02/año y el potencial de generación anual. Una vez estimado lo anterior se procedió a la realización del diseño preliminar de la planta de biogás y finalmente se culminó con la evaluación económica para dando un Valor Actual Neto (VAR) y una Tasa Interna de Retorno (TIR) que confirmó la pre‐factibilidad del proyecto.    Universidad Nacional de Ingeniería2017-12-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionArtículo evaluado por paresapplication/pdfaudio/mpegtext/htmlhttps://revistas.uni.edu.pe/index.php/tecnia/article/view/17710.21754/tecnia.v27i2.177TECNIA; Vol. 27 No. 2 (2017); 73-86TECNIA; Vol. 27 Núm. 2 (2017); 73-862309-04130375-7765reponame:Revistas - Universidad Nacional de Ingenieríainstname:Universidad Nacional de Ingenieríainstacron:UNIspahttps://revistas.uni.edu.pe/index.php/tecnia/article/view/177/52https://revistas.uni.edu.pe/index.php/tecnia/article/view/177/454https://revistas.uni.edu.pe/index.php/tecnia/article/view/177/543Derechos de autor 2017 TECNIAhttp://creativecommons.org/licenses/by/4.0info:eu-repo/semantics/openAccessoai:oai:revistas.uni.edu.pe:article/1772023-11-28T15:31:03Z
dc.title.none.fl_str_mv Pre‐feasibility study and design of a biogas recovery and transport system from the San José (Lambayeque) stabilization ponds towards a power generating station
Estudio de pre‐factibilidad y diseño de un sistema de captación y transporte de biogás para generación eléctrica en lagunas de estabilización de San José‐Lambayeque
title Pre‐feasibility study and design of a biogas recovery and transport system from the San José (Lambayeque) stabilization ponds towards a power generating station
spellingShingle Pre‐feasibility study and design of a biogas recovery and transport system from the San José (Lambayeque) stabilization ponds towards a power generating station
Palacios M., Juan D.
captación y transporte de biogás
tratamiento de aguas residuales
pre-factibilidad
mecanismos de desarrollo limpio
biogas recovery and transport
wastewater treatment
pre‐feasibility
clean development mechanism
title_short Pre‐feasibility study and design of a biogas recovery and transport system from the San José (Lambayeque) stabilization ponds towards a power generating station
title_full Pre‐feasibility study and design of a biogas recovery and transport system from the San José (Lambayeque) stabilization ponds towards a power generating station
title_fullStr Pre‐feasibility study and design of a biogas recovery and transport system from the San José (Lambayeque) stabilization ponds towards a power generating station
title_full_unstemmed Pre‐feasibility study and design of a biogas recovery and transport system from the San José (Lambayeque) stabilization ponds towards a power generating station
title_sort Pre‐feasibility study and design of a biogas recovery and transport system from the San José (Lambayeque) stabilization ponds towards a power generating station
dc.creator.none.fl_str_mv Palacios M., Juan D.
Rachi M., José F.
Delgado D., Oscar E.
author Palacios M., Juan D.
author_facet Palacios M., Juan D.
Rachi M., José F.
Delgado D., Oscar E.
author_role author
author2 Rachi M., José F.
Delgado D., Oscar E.
author2_role author
author
dc.subject.none.fl_str_mv captación y transporte de biogás
tratamiento de aguas residuales
pre-factibilidad
mecanismos de desarrollo limpio
biogas recovery and transport
wastewater treatment
pre‐feasibility
clean development mechanism
topic captación y transporte de biogás
tratamiento de aguas residuales
pre-factibilidad
mecanismos de desarrollo limpio
biogas recovery and transport
wastewater treatment
pre‐feasibility
clean development mechanism
description The pre‐feasibility study and design of a biogas recovery and transport system for power generation was carried out. The purpose of this study was twofold: to reduce the emissions of greenhouse gases (GHG) produced by the anaerobic lagoons of the San José (Lambayeque) wastewater treatment plant; and to obtain a renewable energy source that could make the plant self‐sustaining. Initially, information on the current state of the system and on the plant operating conditions was collected. Then, after analyzing the data obtained and applying the guidelines of the Inter‐American Development Bank (IDB) for Clean Development Mechanism (CDM) projects, the amounts of GHG emitted in the environment was estimated to 33,885 t CO2e / year. Solutions to the problem were then proposed and, among them, a cover system was considered as the most appropriate. This allowed an estimation of the annual generation potential with the project and the reduction of emissions to 27,620.36 tC02 / year. With the above estimates, a preliminary design of the biogas plant was carried out. Finally, an economic evaluation was completed, giving a Net Present Value (NPV) and an Internal Rate of Return (IRR) that confirmed the pre‐feasibility of the project. 
publishDate 2017
dc.date.none.fl_str_mv 2017-12-01
dc.type.none.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
Artículo evaluado por pares
format article
status_str publishedVersion
dc.identifier.none.fl_str_mv https://revistas.uni.edu.pe/index.php/tecnia/article/view/177
10.21754/tecnia.v27i2.177
url https://revistas.uni.edu.pe/index.php/tecnia/article/view/177
identifier_str_mv 10.21754/tecnia.v27i2.177
dc.language.none.fl_str_mv spa
language spa
dc.relation.none.fl_str_mv https://revistas.uni.edu.pe/index.php/tecnia/article/view/177/52
https://revistas.uni.edu.pe/index.php/tecnia/article/view/177/454
https://revistas.uni.edu.pe/index.php/tecnia/article/view/177/543
dc.rights.none.fl_str_mv Derechos de autor 2017 TECNIA
http://creativecommons.org/licenses/by/4.0
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Derechos de autor 2017 TECNIA
http://creativecommons.org/licenses/by/4.0
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
audio/mpeg
text/html
dc.publisher.none.fl_str_mv Universidad Nacional de Ingeniería
publisher.none.fl_str_mv Universidad Nacional de Ingeniería
dc.source.none.fl_str_mv TECNIA; Vol. 27 No. 2 (2017); 73-86
TECNIA; Vol. 27 Núm. 2 (2017); 73-86
2309-0413
0375-7765
reponame:Revistas - Universidad Nacional de Ingeniería
instname:Universidad Nacional de Ingeniería
instacron:UNI
instname_str Universidad Nacional de Ingeniería
instacron_str UNI
institution UNI
reponame_str Revistas - Universidad Nacional de Ingeniería
collection Revistas - Universidad Nacional de Ingeniería
repository.name.fl_str_mv
repository.mail.fl_str_mv
_version_ 1833562776197398528
score 13.968331
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).