Pre‐feasibility study and design of a biogas recovery and transport system from the San José (Lambayeque) stabilization ponds towards a power generating station
Descripción del Articulo
The pre‐feasibility study and design of a biogas recovery and transport system for power generation was carried out. The purpose of this study was twofold: to reduce the emissions of greenhouse gases (GHG) produced by the anaerobic lagoons of the San José (Lambayeque) wastewater treatment plant; and...
| Autores: | , , |
|---|---|
| Formato: | artículo |
| Fecha de Publicación: | 2017 |
| Institución: | Universidad Nacional de Ingeniería |
| Repositorio: | Revistas - Universidad Nacional de Ingeniería |
| Lenguaje: | español |
| OAI Identifier: | oai:oai:revistas.uni.edu.pe:article/177 |
| Enlace del recurso: | https://revistas.uni.edu.pe/index.php/tecnia/article/view/177 |
| Nivel de acceso: | acceso abierto |
| Materia: | captación y transporte de biogás tratamiento de aguas residuales pre-factibilidad mecanismos de desarrollo limpio biogas recovery and transport wastewater treatment pre‐feasibility clean development mechanism |
| Sumario: | The pre‐feasibility study and design of a biogas recovery and transport system for power generation was carried out. The purpose of this study was twofold: to reduce the emissions of greenhouse gases (GHG) produced by the anaerobic lagoons of the San José (Lambayeque) wastewater treatment plant; and to obtain a renewable energy source that could make the plant self‐sustaining. Initially, information on the current state of the system and on the plant operating conditions was collected. Then, after analyzing the data obtained and applying the guidelines of the Inter‐American Development Bank (IDB) for Clean Development Mechanism (CDM) projects, the amounts of GHG emitted in the environment was estimated to 33,885 t CO2e / year. Solutions to the problem were then proposed and, among them, a cover system was considered as the most appropriate. This allowed an estimation of the annual generation potential with the project and the reduction of emissions to 27,620.36 tC02 / year. With the above estimates, a preliminary design of the biogas plant was carried out. Finally, an economic evaluation was completed, giving a Net Present Value (NPV) and an Internal Rate of Return (IRR) that confirmed the pre‐feasibility of the project. |
|---|
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).