Transparency-based protocol for decision-making regarding seismic rehabilitation projects of public buildings

Descripción del Articulo

Motivation and problem definition: A large number of public buildings designed with obsolete criteria are at high seismic risk and in need of structural rehabilitation. The task of selecting the optimal strategy poses important challenges for decision-makers due to the variety of intervention option...

Descripción completa

Detalles Bibliográficos
Autores: Santa-Cruz S., Córdova-Arias C., Brioso X., Vázquez-Rowe I.
Formato: artículo
Fecha de Publicación:2021
Institución:Consejo Nacional de Ciencia Tecnología e Innovación
Repositorio:CONCYTEC-Institucional
Lenguaje:inglés
OAI Identifier:oai:repositorio.concytec.gob.pe:20.500.12390/2382
Enlace del recurso:https://hdl.handle.net/20.500.12390/2382
https://doi.org/10.1016/j.ijdrr.2021.102116
Nivel de acceso:acceso abierto
Materia:Stakeholders
Anti-corruption
Auditability
BIM
Collaborative workshop
ICT
LCA
MCDM
Seismic mitigation
http://purl.org/pe-repo/ocde/ford#2.02.06
id CONC_f04a2a9c8336c4494d27111ea7c62681
oai_identifier_str oai:repositorio.concytec.gob.pe:20.500.12390/2382
network_acronym_str CONC
network_name_str CONCYTEC-Institucional
repository_id_str 4689
dc.title.none.fl_str_mv Transparency-based protocol for decision-making regarding seismic rehabilitation projects of public buildings
title Transparency-based protocol for decision-making regarding seismic rehabilitation projects of public buildings
spellingShingle Transparency-based protocol for decision-making regarding seismic rehabilitation projects of public buildings
Santa-Cruz S.
Stakeholders
Anti-corruption
Auditability
BIM
Collaborative workshop
ICT
LCA
MCDM
Seismic mitigation
http://purl.org/pe-repo/ocde/ford#2.02.06
title_short Transparency-based protocol for decision-making regarding seismic rehabilitation projects of public buildings
title_full Transparency-based protocol for decision-making regarding seismic rehabilitation projects of public buildings
title_fullStr Transparency-based protocol for decision-making regarding seismic rehabilitation projects of public buildings
title_full_unstemmed Transparency-based protocol for decision-making regarding seismic rehabilitation projects of public buildings
title_sort Transparency-based protocol for decision-making regarding seismic rehabilitation projects of public buildings
author Santa-Cruz S.
author_facet Santa-Cruz S.
Córdova-Arias C.
Brioso X.
Vázquez-Rowe I.
author_role author
author2 Córdova-Arias C.
Brioso X.
Vázquez-Rowe I.
author2_role author
author
author
dc.contributor.author.fl_str_mv Santa-Cruz S.
Córdova-Arias C.
Brioso X.
Vázquez-Rowe I.
dc.subject.none.fl_str_mv Stakeholders
topic Stakeholders
Anti-corruption
Auditability
BIM
Collaborative workshop
ICT
LCA
MCDM
Seismic mitigation
http://purl.org/pe-repo/ocde/ford#2.02.06
dc.subject.es_PE.fl_str_mv Anti-corruption
Auditability
BIM
Collaborative workshop
ICT
LCA
MCDM
Seismic mitigation
dc.subject.ocde.none.fl_str_mv http://purl.org/pe-repo/ocde/ford#2.02.06
description Motivation and problem definition: A large number of public buildings designed with obsolete criteria are at high seismic risk and in need of structural rehabilitation. The task of selecting the optimal strategy poses important challenges for decision-makers due to the variety of intervention options and the fact that the construction sector is perceived to be one of the most corrupt in the economy. Objective: Given that transparency is an efficient anti-corruption strategy, a protocol is proposed for decision-making in seismic rehabilitation projects of public infrastructure that incorporates criteria which serve to increase transparency in the project development. Methods: Firstly, the literature was reviewed to describe current practices and regulations linked to decision-making in seismic rehabilitation/retrofitting of buildings. Secondly, relevant criteria that should be taken into account to favor transparency in decision-making were proposed. Thirdly, these criteria were integrated into a protocol that uses information and communication technologies (ICTs), Building Information Modeling (BIM), and collaborative methodologies that involve all stakeholders that will participate in the decision-making process. Finally, the protocol was applied to a real decision-making case study for the selection of alternatives for large-scale reinforcement of state schools in the city of Lima. Results: The criteria of auditability or ease of control of the construction process is well regarded by stakeholders as a mechanism to increase transparency. Including these transparency criteria could influence the selection of reinforcement alternatives, especially if the profile of stakeholders is environmentally-oriented. The sensitivity analysis confirmed the dependency of the selection on the decision-maker profile. © 2021 Elsevier Ltd
publishDate 2021
dc.date.accessioned.none.fl_str_mv 2024-05-30T23:13:38Z
dc.date.available.none.fl_str_mv 2024-05-30T23:13:38Z
dc.date.issued.fl_str_mv 2021
dc.type.none.fl_str_mv info:eu-repo/semantics/article
format article
dc.identifier.uri.none.fl_str_mv https://hdl.handle.net/20.500.12390/2382
dc.identifier.doi.none.fl_str_mv https://doi.org/10.1016/j.ijdrr.2021.102116
dc.identifier.scopus.none.fl_str_mv 2-s2.0-85100657374
url https://hdl.handle.net/20.500.12390/2382
https://doi.org/10.1016/j.ijdrr.2021.102116
identifier_str_mv 2-s2.0-85100657374
dc.language.iso.none.fl_str_mv eng
language eng
dc.relation.ispartof.none.fl_str_mv International Journal of Disaster Risk Reduction
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.publisher.none.fl_str_mv Elsevier Ltd
publisher.none.fl_str_mv Elsevier Ltd
dc.source.none.fl_str_mv reponame:CONCYTEC-Institucional
instname:Consejo Nacional de Ciencia Tecnología e Innovación
instacron:CONCYTEC
instname_str Consejo Nacional de Ciencia Tecnología e Innovación
instacron_str CONCYTEC
institution CONCYTEC
reponame_str CONCYTEC-Institucional
collection CONCYTEC-Institucional
repository.name.fl_str_mv Repositorio Institucional CONCYTEC
repository.mail.fl_str_mv repositorio@concytec.gob.pe
_version_ 1839175784230551552
spelling Publicationrp05811600rp05812600rp01910600rp01052600Santa-Cruz S.Córdova-Arias C.Brioso X.Vázquez-Rowe I.2024-05-30T23:13:38Z2024-05-30T23:13:38Z2021https://hdl.handle.net/20.500.12390/2382https://doi.org/10.1016/j.ijdrr.2021.1021162-s2.0-85100657374Motivation and problem definition: A large number of public buildings designed with obsolete criteria are at high seismic risk and in need of structural rehabilitation. The task of selecting the optimal strategy poses important challenges for decision-makers due to the variety of intervention options and the fact that the construction sector is perceived to be one of the most corrupt in the economy. Objective: Given that transparency is an efficient anti-corruption strategy, a protocol is proposed for decision-making in seismic rehabilitation projects of public infrastructure that incorporates criteria which serve to increase transparency in the project development. Methods: Firstly, the literature was reviewed to describe current practices and regulations linked to decision-making in seismic rehabilitation/retrofitting of buildings. Secondly, relevant criteria that should be taken into account to favor transparency in decision-making were proposed. Thirdly, these criteria were integrated into a protocol that uses information and communication technologies (ICTs), Building Information Modeling (BIM), and collaborative methodologies that involve all stakeholders that will participate in the decision-making process. Finally, the protocol was applied to a real decision-making case study for the selection of alternatives for large-scale reinforcement of state schools in the city of Lima. Results: The criteria of auditability or ease of control of the construction process is well regarded by stakeholders as a mechanism to increase transparency. Including these transparency criteria could influence the selection of reinforcement alternatives, especially if the profile of stakeholders is environmentally-oriented. The sensitivity analysis confirmed the dependency of the selection on the decision-maker profile. © 2021 Elsevier LtdFondo Nacional de Desarrollo Científico y Tecnológico - FondecytengElsevier LtdInternational Journal of Disaster Risk Reductioninfo:eu-repo/semantics/openAccessStakeholdersAnti-corruption-1Auditability-1BIM-1Collaborative workshop-1ICT-1LCA-1MCDM-1Seismic mitigation-1http://purl.org/pe-repo/ocde/ford#2.02.06-1Transparency-based protocol for decision-making regarding seismic rehabilitation projects of public buildingsinfo:eu-repo/semantics/articlereponame:CONCYTEC-Institucionalinstname:Consejo Nacional de Ciencia Tecnología e Innovacióninstacron:CONCYTEC#PLACEHOLDER_PARENT_METADATA_VALUE##PLACEHOLDER_PARENT_METADATA_VALUE##PLACEHOLDER_PARENT_METADATA_VALUE##PLACEHOLDER_PARENT_METADATA_VALUE##PLACEHOLDER_PARENT_METADATA_VALUE#20.500.12390/2382oai:repositorio.concytec.gob.pe:20.500.12390/23822024-05-30 15:42:15.615http://purl.org/coar/access_right/c_14cbinfo:eu-repo/semantics/closedAccessmetadata only accesshttps://repositorio.concytec.gob.peRepositorio Institucional CONCYTECrepositorio@concytec.gob.pe#PLACEHOLDER_PARENT_METADATA_VALUE##PLACEHOLDER_PARENT_METADATA_VALUE##PLACEHOLDER_PARENT_METADATA_VALUE##PLACEHOLDER_PARENT_METADATA_VALUE#<Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="e0bf88dc-3c31-491b-8c12-3f4d75f260c1"> <Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843</Type> <Language>eng</Language> <Title>Transparency-based protocol for decision-making regarding seismic rehabilitation projects of public buildings</Title> <PublishedIn> <Publication> <Title>International Journal of Disaster Risk Reduction</Title> </Publication> </PublishedIn> <PublicationDate>2021</PublicationDate> <DOI>https://doi.org/10.1016/j.ijdrr.2021.102116</DOI> <SCP-Number>2-s2.0-85100657374</SCP-Number> <Authors> <Author> <DisplayName>Santa-Cruz S.</DisplayName> <Person id="rp05811" /> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> <Author> <DisplayName>Córdova-Arias C.</DisplayName> <Person id="rp05812" /> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> <Author> <DisplayName>Brioso X.</DisplayName> <Person id="rp01910" /> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> <Author> <DisplayName>Vázquez-Rowe I.</DisplayName> <Person id="rp01052" /> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Elsevier Ltd</DisplayName> <OrgUnit /> </Publisher> </Publishers> <Keyword>Stakeholders</Keyword> <Keyword>Anti-corruption</Keyword> <Keyword>Auditability</Keyword> <Keyword>BIM</Keyword> <Keyword>Collaborative workshop</Keyword> <Keyword>ICT</Keyword> <Keyword>LCA</Keyword> <Keyword>MCDM</Keyword> <Keyword>Seismic mitigation</Keyword> <Abstract>Motivation and problem definition: A large number of public buildings designed with obsolete criteria are at high seismic risk and in need of structural rehabilitation. The task of selecting the optimal strategy poses important challenges for decision-makers due to the variety of intervention options and the fact that the construction sector is perceived to be one of the most corrupt in the economy. Objective: Given that transparency is an efficient anti-corruption strategy, a protocol is proposed for decision-making in seismic rehabilitation projects of public infrastructure that incorporates criteria which serve to increase transparency in the project development. Methods: Firstly, the literature was reviewed to describe current practices and regulations linked to decision-making in seismic rehabilitation/retrofitting of buildings. Secondly, relevant criteria that should be taken into account to favor transparency in decision-making were proposed. Thirdly, these criteria were integrated into a protocol that uses information and communication technologies (ICTs), Building Information Modeling (BIM), and collaborative methodologies that involve all stakeholders that will participate in the decision-making process. Finally, the protocol was applied to a real decision-making case study for the selection of alternatives for large-scale reinforcement of state schools in the city of Lima. Results: The criteria of auditability or ease of control of the construction process is well regarded by stakeholders as a mechanism to increase transparency. Including these transparency criteria could influence the selection of reinforcement alternatives, especially if the profile of stakeholders is environmentally-oriented. The sensitivity analysis confirmed the dependency of the selection on the decision-maker profile. © 2021 Elsevier Ltd</Abstract> <Access xmlns="http://purl.org/coar/access_right" > </Access> </Publication> -1
score 13.448654
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).