Estudio de prefactibilidad para la instalación de una planta de habilitación de viviendas prefabricadas
Descripción del Articulo
This project's main goal is to determine the technological, economic, financial, commercial and social feasibility of an assembly plant for prefabricated houses built with drywall and galvanized steel. These houses have shorter construction times, lower prices and have aseismic properties in co...
| Autores: | , |
|---|---|
| Formato: | tesis de grado |
| Fecha de Publicación: | 2020 |
| Institución: | Universidad de Lima |
| Repositorio: | ULIMA-Institucional |
| Lenguaje: | español |
| OAI Identifier: | oai:repositorio.ulima.edu.pe:20.500.12724/11657 |
| Enlace del recurso: | https://hdl.handle.net/20.500.12724/11657 |
| Nivel de acceso: | acceso abierto |
| Materia: | Casas prefabricadas Viviendas Proyectos industriales Estudios de factibilidad Prefabricated houses Housing Industrial projects https://purl.org/pe-repo/ocde/ford#2.11.04 |
| id |
RULI_c9a5a8f82d550d97186354868362ba2a |
|---|---|
| oai_identifier_str |
oai:repositorio.ulima.edu.pe:20.500.12724/11657 |
| network_acronym_str |
RULI |
| network_name_str |
ULIMA-Institucional |
| repository_id_str |
3883 |
| dc.title.es_PE.fl_str_mv |
Estudio de prefactibilidad para la instalación de una planta de habilitación de viviendas prefabricadas |
| title |
Estudio de prefactibilidad para la instalación de una planta de habilitación de viviendas prefabricadas |
| spellingShingle |
Estudio de prefactibilidad para la instalación de una planta de habilitación de viviendas prefabricadas Cock Guerrero, Diego André Casas prefabricadas Viviendas Proyectos industriales Estudios de factibilidad Prefabricated houses Housing Industrial projects https://purl.org/pe-repo/ocde/ford#2.11.04 |
| title_short |
Estudio de prefactibilidad para la instalación de una planta de habilitación de viviendas prefabricadas |
| title_full |
Estudio de prefactibilidad para la instalación de una planta de habilitación de viviendas prefabricadas |
| title_fullStr |
Estudio de prefactibilidad para la instalación de una planta de habilitación de viviendas prefabricadas |
| title_full_unstemmed |
Estudio de prefactibilidad para la instalación de una planta de habilitación de viviendas prefabricadas |
| title_sort |
Estudio de prefactibilidad para la instalación de una planta de habilitación de viviendas prefabricadas |
| author |
Cock Guerrero, Diego André |
| author_facet |
Cock Guerrero, Diego André Mc Farlane Garcés, Paul Christian |
| author_role |
author |
| author2 |
Mc Farlane Garcés, Paul Christian |
| author2_role |
author |
| dc.contributor.advisor.fl_str_mv |
Salinas Pedemonte, Pedro Arturo |
| dc.contributor.author.fl_str_mv |
Cock Guerrero, Diego André Mc Farlane Garcés, Paul Christian |
| dc.subject.en_EN.fl_str_mv |
Casas prefabricadas Viviendas Proyectos industriales Estudios de factibilidad |
| topic |
Casas prefabricadas Viviendas Proyectos industriales Estudios de factibilidad Prefabricated houses Housing Industrial projects https://purl.org/pe-repo/ocde/ford#2.11.04 |
| dc.subject.es_PE.fl_str_mv |
Prefabricated houses Housing Industrial projects |
| dc.subject.ocde.none.fl_str_mv |
https://purl.org/pe-repo/ocde/ford#2.11.04 |
| description |
This project's main goal is to determine the technological, economic, financial, commercial and social feasibility of an assembly plant for prefabricated houses built with drywall and galvanized steel. These houses have shorter construction times, lower prices and have aseismic properties in contrast with traditional built houses; those characteristics are well received in our target market, which consists of low-income citizens. This statement can be reflected in the survey we conducted. We gathered data on the loans made through MiVivienda in the last years and we were able to determine a demand of 52 social houses for the first year, considering psychographic and demographic segmentation. The project’s location was chosen having in account factors such as the proximity to the target market, existing infrastructure, and workforce availability. Villa El Salvador was the best option among the analyzed districts. The size of the project was determined by the market size. To be able to reach the break-even point, we have to sell 40 houses. Moving on to the economic and financial evaluation, S/ 282 000 is the required investment, from which S/ 85 000 are financed through a financial institution over a 3-year period. The results were a three years investment recovery period, NPV of S/ 254 223 and a 57,91% IRR. Our sensitivity analysis determined that the price and the direct costs were the most sensible variables. The aggregate value on the final year of the project is S/ 9MM which reflects that materials gain a lot of value during the construction process. We also obtained that for every employee, an investment of S/ 13 429 is required. |
| publishDate |
2020 |
| dc.date.accessioned.none.fl_str_mv |
2020-10-16T16:19:22Z |
| dc.date.available.none.fl_str_mv |
2020-10-16T16:19:22Z |
| dc.date.issued.fl_str_mv |
2020 |
| dc.type.none.fl_str_mv |
info:eu-repo/semantics/bachelorThesis |
| dc.type.other.none.fl_str_mv |
Tesis |
| format |
bachelorThesis |
| dc.identifier.citation.es_PE.fl_str_mv |
Cock Guerrero, D. A. y Mc Farlane Garcés, P. C. (2020). Estudio de prefactibilidad para la instalación de una planta de habilitación de viviendas prefabricadas (tesis para optar el título profesional de Ingeniero Industrial). Universidad de Lima. |
| dc.identifier.uri.none.fl_str_mv |
https://hdl.handle.net/20.500.12724/11657 |
| dc.identifier.isni.none.fl_str_mv |
121541816 |
| identifier_str_mv |
Cock Guerrero, D. A. y Mc Farlane Garcés, P. C. (2020). Estudio de prefactibilidad para la instalación de una planta de habilitación de viviendas prefabricadas (tesis para optar el título profesional de Ingeniero Industrial). Universidad de Lima. 121541816 |
| url |
https://hdl.handle.net/20.500.12724/11657 |
| dc.language.iso.none.fl_str_mv |
spa |
| language |
spa |
| dc.relation.ispartof.fl_str_mv |
SUNEDU |
| dc.rights.*.fl_str_mv |
info:eu-repo/semantics/openAccess |
| dc.rights.uri.*.fl_str_mv |
https://creativecommons.org/licenses/by-nc-sa/4.0/ |
| eu_rights_str_mv |
openAccess |
| rights_invalid_str_mv |
https://creativecommons.org/licenses/by-nc-sa/4.0/ |
| dc.format.none.fl_str_mv |
application/pdf |
| dc.publisher.none.fl_str_mv |
Universidad de Lima |
| dc.publisher.country.none.fl_str_mv |
PE |
| publisher.none.fl_str_mv |
Universidad de Lima |
| dc.source.none.fl_str_mv |
Repositorio Institucional - Ulima Universidad de Lima reponame:ULIMA-Institucional instname:Universidad de Lima instacron:ULIMA |
| instname_str |
Universidad de Lima |
| instacron_str |
ULIMA |
| institution |
ULIMA |
| reponame_str |
ULIMA-Institucional |
| collection |
ULIMA-Institucional |
| bitstream.url.fl_str_mv |
https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11657/1/Cock_Guerrero_Diego_Andr%c3%a9.pdf https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11657/5/Cock_Guerrero_Diego_Andr%c3%a9.pdf.jpg https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11657/2/license_rdf https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11657/4/Cock_Guerrero_Diego_Andr%c3%a9.pdf.txt https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11657/3/license.txt |
| bitstream.checksum.fl_str_mv |
bd0caa9cd69ee648707740197284ed43 6100229344de11b998947d2f4913ad09 3655808e5dd46167956d6870b0f43800 0d91ec85935a406c3e6a09bfd90610cb 8a4605be74aa9ea9d79846c1fba20a33 |
| bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 MD5 MD5 MD5 |
| repository.name.fl_str_mv |
Repositorio Universidad de Lima |
| repository.mail.fl_str_mv |
repositorio@ulima.edu.pe |
| _version_ |
1846611941544427520 |
| spelling |
Salinas Pedemonte, Pedro ArturoCock Guerrero, Diego AndréMc Farlane Garcés, Paul Christian2020-10-16T16:19:22Z2020-10-16T16:19:22Z2020Cock Guerrero, D. A. y Mc Farlane Garcés, P. C. (2020). Estudio de prefactibilidad para la instalación de una planta de habilitación de viviendas prefabricadas (tesis para optar el título profesional de Ingeniero Industrial). Universidad de Lima.https://hdl.handle.net/20.500.12724/11657121541816This project's main goal is to determine the technological, economic, financial, commercial and social feasibility of an assembly plant for prefabricated houses built with drywall and galvanized steel. These houses have shorter construction times, lower prices and have aseismic properties in contrast with traditional built houses; those characteristics are well received in our target market, which consists of low-income citizens. This statement can be reflected in the survey we conducted. We gathered data on the loans made through MiVivienda in the last years and we were able to determine a demand of 52 social houses for the first year, considering psychographic and demographic segmentation. The project’s location was chosen having in account factors such as the proximity to the target market, existing infrastructure, and workforce availability. Villa El Salvador was the best option among the analyzed districts. The size of the project was determined by the market size. To be able to reach the break-even point, we have to sell 40 houses. Moving on to the economic and financial evaluation, S/ 282 000 is the required investment, from which S/ 85 000 are financed through a financial institution over a 3-year period. The results were a three years investment recovery period, NPV of S/ 254 223 and a 57,91% IRR. Our sensitivity analysis determined that the price and the direct costs were the most sensible variables. The aggregate value on the final year of the project is S/ 9MM which reflects that materials gain a lot of value during the construction process. We also obtained that for every employee, an investment of S/ 13 429 is required.El objetivo de este proyecto es determinar la factibilidad tecnológica, económica, financiera, de mercado y social de una planta de habilitación de estructuras para la venta de viviendas construidas con el sistema constructivo en seco con drywall y acero galvanizado. Este sistema cuenta con ventajas en tiempos de entrega, precio y propiedades antisísmicas frente a su contraparte tradicional. La encuesta reflejó la alta aceptación de las viviendas. Con la información histórica de financiamientos por MiVivienda, se pudo proyectar una demanda para el proyecto de 52 viviendas para el primer año de operación, teniendo en cuenta segmentación psicográfica y demográfica. La localización del proyecto estuvo supeditada a factores tales como la cercanía al mercado, la infraestructura existente y la mano de obra disponible entre otros. Se optó por construir la planta en Villa el Salvador, Lima. El tamaño de proyecto estuvo determinado por el mercado. Se requiere vender 40 viviendas prefabricadas para superar el punto de equilibrio. En cuanto a la evaluación económica y financiera, se determinó que la inversión necesaria para llevar a cabo este proyecto es de S/ 282 000, de los cuales S/ 85 000 son financiados por una entidad financiera pagaderos en un plazo de 3 años. Se halló que el proyecto tiene un periodo de recupero de aproximadamente 3 años, VAN de S/ 254 223 y una TIR de 57,91%, y con un análisis de sensibilidad se determinó que el valor de venta y los costos directos son las variables más sensibles para los resultados obtenidos. El valor agregado al cabo de los 5 años de proyecto es de S/ 9 millones lo que refleja que las materias primas luego de pasar por el proceso de construcción generan un alto valor agregado. Además de obtuvo que, por cada colaborador, la inversión es de S/ 13 429.Tesisapplication/pdfspaUniversidad de LimaPEinfo:eu-repo/semantics/openAccesshttps://creativecommons.org/licenses/by-nc-sa/4.0/Repositorio Institucional - UlimaUniversidad de Limareponame:ULIMA-Institucionalinstname:Universidad de Limainstacron:ULIMACasas prefabricadasViviendasProyectos industrialesEstudios de factibilidadPrefabricated housesHousingIndustrial projectshttps://purl.org/pe-repo/ocde/ford#2.11.04Estudio de prefactibilidad para la instalación de una planta de habilitación de viviendas prefabricadasinfo:eu-repo/semantics/bachelorThesisTesisSUNEDUTítulo ProfesionalIngeniería IndustrialUniversidad de Lima. Facultad de Ingeniería y ArquitecturaIngeniero Industrialhttps://orcid.org/0000-0002-7021-154691385977220267043970572397401https://purl.org/pe-repo/renati/level#tituloProfesionalArroyo Gordillo, PedroSalinas Pedemonte, PedroNavarro Neyra, Miguel AngelOta Montalbán, Julio Franciscohttps://purl.org/pe-repo/renati/type#tesisOIORIGINALCock_Guerrero_Diego_André.pdfCock_Guerrero_Diego_André.pdfapplication/pdf6550355https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11657/1/Cock_Guerrero_Diego_Andr%c3%a9.pdfbd0caa9cd69ee648707740197284ed43MD51THUMBNAILCock_Guerrero_Diego_André.pdf.jpgCock_Guerrero_Diego_André.pdf.jpgGenerated Thumbnailimage/jpeg10658https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11657/5/Cock_Guerrero_Diego_Andr%c3%a9.pdf.jpg6100229344de11b998947d2f4913ad09MD55CC-LICENSElicense_rdflicense_rdfapplication/rdf+xml; charset=utf-8811https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11657/2/license_rdf3655808e5dd46167956d6870b0f43800MD52TEXTCock_Guerrero_Diego_André.pdf.txtCock_Guerrero_Diego_André.pdf.txtExtracted texttext/plain257644https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11657/4/Cock_Guerrero_Diego_Andr%c3%a9.pdf.txt0d91ec85935a406c3e6a09bfd90610cbMD54LICENSElicense.txtlicense.txttext/plain; charset=utf-81748https://repositorio.ulima.edu.pe/bitstream/20.500.12724/11657/3/license.txt8a4605be74aa9ea9d79846c1fba20a33MD5320.500.12724/11657oai:repositorio.ulima.edu.pe:20.500.12724/116572025-09-17 13:55:02.079Repositorio Universidad de Limarepositorio@ulima.edu.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 |
| score |
13.040751 |
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).