Estudio de pre factibilidad para la instalación de una planta procesadora de escamas de polipropileno reciclado
Descripción del Articulo
This research project´s main objective is to understand the viability of installing a recycled polypropylene pellets manufacturing plant. This goes in hand with the identified issue at both a national and international level, related to the amount of garbage and waste that human beings are producing...
| Autores: | , |
|---|---|
| Formato: | tesis de grado |
| Fecha de Publicación: | 2018 |
| Institución: | Universidad de Lima |
| Repositorio: | ULIMA-Institucional |
| Lenguaje: | español |
| OAI Identifier: | oai:repositorio.ulima.edu.pe:20.500.12724/8431 |
| Enlace del recurso: | https://hdl.handle.net/20.500.12724/8431 http://doi.org/10.26439/ulima.tesis/8431 |
| Nivel de acceso: | acceso abierto |
| Materia: | Industria del reciclado Proyectos industriales Plastics Recycling industry Industrial projects Plásticos https://purl.org/pe-repo/ocde/ford#2.11.04 |
| id |
RULI_3e5403c7d119ed5478f194c6bbe43370 |
|---|---|
| oai_identifier_str |
oai:repositorio.ulima.edu.pe:20.500.12724/8431 |
| network_acronym_str |
RULI |
| network_name_str |
ULIMA-Institucional |
| repository_id_str |
3883 |
| dc.title.es_PE.fl_str_mv |
Estudio de pre factibilidad para la instalación de una planta procesadora de escamas de polipropileno reciclado |
| title |
Estudio de pre factibilidad para la instalación de una planta procesadora de escamas de polipropileno reciclado |
| spellingShingle |
Estudio de pre factibilidad para la instalación de una planta procesadora de escamas de polipropileno reciclado De Azambuja Hevia, Joao Alberto Industria del reciclado Proyectos industriales Plastics Recycling industry Industrial projects Plásticos https://purl.org/pe-repo/ocde/ford#2.11.04 |
| title_short |
Estudio de pre factibilidad para la instalación de una planta procesadora de escamas de polipropileno reciclado |
| title_full |
Estudio de pre factibilidad para la instalación de una planta procesadora de escamas de polipropileno reciclado |
| title_fullStr |
Estudio de pre factibilidad para la instalación de una planta procesadora de escamas de polipropileno reciclado |
| title_full_unstemmed |
Estudio de pre factibilidad para la instalación de una planta procesadora de escamas de polipropileno reciclado |
| title_sort |
Estudio de pre factibilidad para la instalación de una planta procesadora de escamas de polipropileno reciclado |
| author |
De Azambuja Hevia, Joao Alberto |
| author_facet |
De Azambuja Hevia, Joao Alberto Morales Brazzoduro, Diego Gustavo |
| author_role |
author |
| author2 |
Morales Brazzoduro, Diego Gustavo |
| author2_role |
author |
| dc.contributor.advisor.fl_str_mv |
Larios Francia, Rosa Patricia |
| dc.contributor.author.fl_str_mv |
De Azambuja Hevia, Joao Alberto Morales Brazzoduro, Diego Gustavo |
| dc.subject.en_EN.fl_str_mv |
Industria del reciclado Proyectos industriales Plastics Recycling industry Industrial projects |
| topic |
Industria del reciclado Proyectos industriales Plastics Recycling industry Industrial projects Plásticos https://purl.org/pe-repo/ocde/ford#2.11.04 |
| dc.subject.es_PE.fl_str_mv |
Plásticos |
| dc.subject.ocde.none.fl_str_mv |
https://purl.org/pe-repo/ocde/ford#2.11.04 |
| description |
This research project´s main objective is to understand the viability of installing a recycled polypropylene pellets manufacturing plant. This goes in hand with the identified issue at both a national and international level, related to the amount of garbage and waste that human beings are producing. The solution for this issue is recycling, which is the topic developed in this investigation, focused specifically on polymers. Along the document, several themes will be developed which include the market study and project demand in order to fully understand the industrial sector being approached, both the historical and potential demand, the supply, target market and commercial strategies. Then, the plant localization and optimum size are analyzed based on the critical macro and micro factors determined to guarantee the success of the project and explain the selection of the localization. Later, the project engineering is developed with the product specifications, technology and machinery to be used, installed capacity, production requirements and plant arrangement. Further on, the organization and administration is proposed and finally an economic, financial and social analysis is performed to evaluate the project and lead to solid conclusions. All of this is done to determine if the project is feasible economically, financially and socially. In the economic evaluation, a positive VAN of S/ 706 176 is obtained and a TIR of 25,04%, while in the financial evaluation the result is a positive VAN of S/ 1 003 242 and a TIR of 31,60%. In both cases, the project demonstrates that it is profitable and with a higher TIR in comparison to the market cost opportunity calculated to be 18,51%. In the social aspect, all social indicators are favorable as it is shown in the results of capital intensity (0,36) and revenue generation (0,05). |
| publishDate |
2018 |
| dc.date.accessioned.none.fl_str_mv |
2019-06-07T23:40:15Z |
| dc.date.available.none.fl_str_mv |
2019-06-07T23:40:15Z |
| dc.date.issued.fl_str_mv |
2018 |
| dc.type.none.fl_str_mv |
info:eu-repo/semantics/bachelorThesis |
| dc.type.other.none.fl_str_mv |
Trabajo de investigación |
| format |
bachelorThesis |
| dc.identifier.citation.es_PE.fl_str_mv |
Morales Brazzoduro, D. G. y De Azambuja Hevia, J. A. (2018). Estudio de pre factibilidad para la instalación de una planta procesadora de escamas de polipropileno reciclado (trabajo de investigación para optar por el título profesional de Ingeniero Industrial). Universidad de Lima. |
| dc.identifier.uri.none.fl_str_mv |
https://hdl.handle.net/20.500.12724/8431 |
| dc.identifier.doi.none.fl_str_mv |
http://doi.org/10.26439/ulima.tesis/8431 |
| identifier_str_mv |
Morales Brazzoduro, D. G. y De Azambuja Hevia, J. A. (2018). Estudio de pre factibilidad para la instalación de una planta procesadora de escamas de polipropileno reciclado (trabajo de investigación para optar por el título profesional de Ingeniero Industrial). Universidad de Lima. |
| url |
https://hdl.handle.net/20.500.12724/8431 http://doi.org/10.26439/ulima.tesis/8431 |
| dc.language.iso.none.fl_str_mv |
spa |
| language |
spa |
| dc.relation.ispartof.fl_str_mv |
SUNEDU |
| dc.rights.*.fl_str_mv |
info:eu-repo/semantics/openAccess |
| dc.rights.uri.*.fl_str_mv |
https://creativecommons.org/licenses/by-nc-sa/4.0/ |
| eu_rights_str_mv |
openAccess |
| rights_invalid_str_mv |
https://creativecommons.org/licenses/by-nc-sa/4.0/ |
| dc.format.none.fl_str_mv |
application/pdf |
| dc.publisher.none.fl_str_mv |
Universidad de Lima |
| dc.publisher.country.none.fl_str_mv |
PE |
| publisher.none.fl_str_mv |
Universidad de Lima |
| dc.source.none.fl_str_mv |
Repositorio Institucional - Ulima Universidad de Lima reponame:ULIMA-Institucional instname:Universidad de Lima instacron:ULIMA |
| instname_str |
Universidad de Lima |
| instacron_str |
ULIMA |
| institution |
ULIMA |
| reponame_str |
ULIMA-Institucional |
| collection |
ULIMA-Institucional |
| bitstream.url.fl_str_mv |
https://repositorio.ulima.edu.pe/bitstream/20.500.12724/8431/1/Morales_Brazzoduro_Diego_Gustavo.pdf https://repositorio.ulima.edu.pe/bitstream/20.500.12724/8431/2/license.txt https://repositorio.ulima.edu.pe/bitstream/20.500.12724/8431/3/Morales_Brazzoduro_Diego_Gustavo.pdf.txt https://repositorio.ulima.edu.pe/bitstream/20.500.12724/8431/4/Morales_Brazzoduro_Diego_Gustavo.pdf.jpg |
| bitstream.checksum.fl_str_mv |
56a3500e972b55998e5e58ff440ae934 8a4605be74aa9ea9d79846c1fba20a33 946460d2ba167dbda07ef1cb8b71b777 a198f32e95d690aeeda5522ccca852d1 |
| bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 MD5 MD5 |
| repository.name.fl_str_mv |
Repositorio Universidad de Lima |
| repository.mail.fl_str_mv |
repositorio@ulima.edu.pe |
| _version_ |
1849149225443524608 |
| spelling |
Larios Francia, Rosa PatriciaDe Azambuja Hevia, Joao AlbertoMorales Brazzoduro, Diego Gustavo2019-06-07T23:40:15Z2019-06-07T23:40:15Z2018Morales Brazzoduro, D. G. y De Azambuja Hevia, J. A. (2018). Estudio de pre factibilidad para la instalación de una planta procesadora de escamas de polipropileno reciclado (trabajo de investigación para optar por el título profesional de Ingeniero Industrial). Universidad de Lima.https://hdl.handle.net/20.500.12724/8431http://doi.org/10.26439/ulima.tesis/8431This research project´s main objective is to understand the viability of installing a recycled polypropylene pellets manufacturing plant. This goes in hand with the identified issue at both a national and international level, related to the amount of garbage and waste that human beings are producing. The solution for this issue is recycling, which is the topic developed in this investigation, focused specifically on polymers. Along the document, several themes will be developed which include the market study and project demand in order to fully understand the industrial sector being approached, both the historical and potential demand, the supply, target market and commercial strategies. Then, the plant localization and optimum size are analyzed based on the critical macro and micro factors determined to guarantee the success of the project and explain the selection of the localization. Later, the project engineering is developed with the product specifications, technology and machinery to be used, installed capacity, production requirements and plant arrangement. Further on, the organization and administration is proposed and finally an economic, financial and social analysis is performed to evaluate the project and lead to solid conclusions. All of this is done to determine if the project is feasible economically, financially and socially. In the economic evaluation, a positive VAN of S/ 706 176 is obtained and a TIR of 25,04%, while in the financial evaluation the result is a positive VAN of S/ 1 003 242 and a TIR of 31,60%. In both cases, the project demonstrates that it is profitable and with a higher TIR in comparison to the market cost opportunity calculated to be 18,51%. In the social aspect, all social indicators are favorable as it is shown in the results of capital intensity (0,36) and revenue generation (0,05).El presente proyecto de investigación profundiza en la viabilidad de la instalación de una planta procesadora de escamas de polipropileno reciclado. Esto va de la mano con la problemática identificada tanto a nivel nacional como mundial, que es la contaminación causada por la cantidad de desechos y residuos sólidos que los seres humanos producimos. La solución para esto es el reciclaje, tema que se trabaja en el transcurso de la presente investigación, enfocándolo en polímeros puntualmente. En el trascurso del documento se abordan los temas del estudio de mercado y demanda del proyecto para entender a fondo el sector industrial al que se ingresa, la demanda tanto histórica como potencial, la oferta, el mercado objetivo y las estrategias de comercialización. Luego, se revisa la localización y tamaño óptimo de la planta en base a los factores macro y micro más críticos para asegurar el éxito del proyecto y en base a eso se sustentará la selección de la ubicación. Más adelante, se trabaja la ingeniería del proyecto con las especificaciones del producto, la tecnología y maquinaria a utilizar, la capacidad instalada, los requerimientos de producción y disposición de planta. Seguido a eso, se plantea la organización y administración y por último se elabora un análisis económico, financiero y social para evaluar el proyecto y alcanzar las conclusiones. Todo esto se realiza para determinar si el proyecto es factible económica, financiera y socialmente. En el caso de la evaluación económica, se obtiene un VAN positivo de S/ 706 176 y un TIR de 25,04% y en el escenario financiero, un VAN positivo de S/ 1 003 242 y un TIR de 31,60%. En ambos casos el proyecto demuestra ser rentable y con un TIR mayor al costo de oportunidad calculado del mercado equivalente a 18,51%. En el aspecto social, todos los indicadores sociales muestran ser favorables como se demuestra con los resultados de intensidad de capital (0,36) y de generación de divisas (0,05).Trabajo de investigaciónapplication/pdfspaUniversidad de LimaPEinfo:eu-repo/semantics/openAccesshttps://creativecommons.org/licenses/by-nc-sa/4.0/Repositorio Institucional - UlimaUniversidad de Limareponame:ULIMA-Institucionalinstname:Universidad de Limainstacron:ULIMAIndustria del recicladoProyectos industrialesPlasticsRecycling industryIndustrial projectsPlásticoshttps://purl.org/pe-repo/ocde/ford#2.11.04Estudio de pre factibilidad para la instalación de una planta procesadora de escamas de polipropileno recicladoinfo:eu-repo/semantics/bachelorThesisTrabajo de investigaciónSUNEDUTítulo ProfesionalIngeniería IndustrialUniversidad de Lima. Facultad de Ingeniería y ArquitecturaIngeniero Industrial722026https://purl.org/pe-repo/renati/level#tituloProfesionalhttps://purl.org/pe-repo/renati/type#trabajoDeInvestigacionOIORIGINALMorales_Brazzoduro_Diego_Gustavo.pdfMorales_Brazzoduro_Diego_Gustavo.pdfTrabajo de investigaciónapplication/pdf2028671https://repositorio.ulima.edu.pe/bitstream/20.500.12724/8431/1/Morales_Brazzoduro_Diego_Gustavo.pdf56a3500e972b55998e5e58ff440ae934MD51LICENSElicense.txtlicense.txttext/plain; charset=utf-81748https://repositorio.ulima.edu.pe/bitstream/20.500.12724/8431/2/license.txt8a4605be74aa9ea9d79846c1fba20a33MD52TEXTMorales_Brazzoduro_Diego_Gustavo.pdf.txtMorales_Brazzoduro_Diego_Gustavo.pdf.txtExtracted texttext/plain240336https://repositorio.ulima.edu.pe/bitstream/20.500.12724/8431/3/Morales_Brazzoduro_Diego_Gustavo.pdf.txt946460d2ba167dbda07ef1cb8b71b777MD53THUMBNAILMorales_Brazzoduro_Diego_Gustavo.pdf.jpgMorales_Brazzoduro_Diego_Gustavo.pdf.jpgGenerated Thumbnailimage/jpeg11693https://repositorio.ulima.edu.pe/bitstream/20.500.12724/8431/4/Morales_Brazzoduro_Diego_Gustavo.pdf.jpga198f32e95d690aeeda5522ccca852d1MD5420.500.12724/8431oai:repositorio.ulima.edu.pe:20.500.12724/84312024-10-04 18:38:32.815Repositorio Universidad de Limarepositorio@ulima.edu.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 |
| score |
13.046508 |
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).