Proposal of a Model for the Management of Changes in the Design Phase of Public Works of Educational Infrastructures Based on the BIM and ICE Methodologies
Descripción del Articulo
The construction industry is essential for the economic development of a country. However, changing management in these projects can be complex due to communication between different stakeholders. Construction changes are common and can occur at any stage of the project, which can have negative impa...
Autores: | , , |
---|---|
Formato: | artículo |
Fecha de Publicación: | 2024 |
Institución: | Universidad Peruana de Ciencias Aplicadas |
Repositorio: | UPC-Institucional |
Lenguaje: | inglés |
OAI Identifier: | oai:repositorioacademico.upc.edu.pe:10757/676020 |
Enlace del recurso: | http://hdl.handle.net/10757/676020 |
Nivel de acceso: | acceso embargado |
Materia: | 3D Model BIM Methodology Change Management Construction Industry Control Coordination ICE Sessions Information and Communication Technologies |
id |
UUPC_cb61f72efb38ce734b21e77f291b02d9 |
---|---|
oai_identifier_str |
oai:repositorioacademico.upc.edu.pe:10757/676020 |
network_acronym_str |
UUPC |
network_name_str |
UPC-Institucional |
repository_id_str |
2670 |
dc.title.es_PE.fl_str_mv |
Proposal of a Model for the Management of Changes in the Design Phase of Public Works of Educational Infrastructures Based on the BIM and ICE Methodologies |
title |
Proposal of a Model for the Management of Changes in the Design Phase of Public Works of Educational Infrastructures Based on the BIM and ICE Methodologies |
spellingShingle |
Proposal of a Model for the Management of Changes in the Design Phase of Public Works of Educational Infrastructures Based on the BIM and ICE Methodologies Sardi, Andrea Natalia Valderrama 3D Model BIM Methodology Change Management Construction Industry Control Coordination ICE Sessions Information and Communication Technologies |
title_short |
Proposal of a Model for the Management of Changes in the Design Phase of Public Works of Educational Infrastructures Based on the BIM and ICE Methodologies |
title_full |
Proposal of a Model for the Management of Changes in the Design Phase of Public Works of Educational Infrastructures Based on the BIM and ICE Methodologies |
title_fullStr |
Proposal of a Model for the Management of Changes in the Design Phase of Public Works of Educational Infrastructures Based on the BIM and ICE Methodologies |
title_full_unstemmed |
Proposal of a Model for the Management of Changes in the Design Phase of Public Works of Educational Infrastructures Based on the BIM and ICE Methodologies |
title_sort |
Proposal of a Model for the Management of Changes in the Design Phase of Public Works of Educational Infrastructures Based on the BIM and ICE Methodologies |
author |
Sardi, Andrea Natalia Valderrama |
author_facet |
Sardi, Andrea Natalia Valderrama Romero, Karla Rosario Fernandez Oliveros, Brian Irving Arriola |
author_role |
author |
author2 |
Romero, Karla Rosario Fernandez Oliveros, Brian Irving Arriola |
author2_role |
author author |
dc.contributor.author.fl_str_mv |
Sardi, Andrea Natalia Valderrama Romero, Karla Rosario Fernandez Oliveros, Brian Irving Arriola |
dc.subject.es_PE.fl_str_mv |
3D Model BIM Methodology Change Management Construction Industry Control Coordination ICE Sessions Information and Communication Technologies |
topic |
3D Model BIM Methodology Change Management Construction Industry Control Coordination ICE Sessions Information and Communication Technologies |
description |
The construction industry is essential for the economic development of a country. However, changing management in these projects can be complex due to communication between different stakeholders. Construction changes are common and can occur at any stage of the project, which can have negative impacts on costs and schedules. It is important to have clear communication of the vision and benefits of changes before implementing them. The use of Information and Communication Technologies (ICT) in construction can improve communication, collaboration, knowledge management, and acquisition processes. In this context, a change management model is proposed in the design phase of infrastructure works based on the BIM (Building Information Modeling) and ICE (Interactive Concurrent Engineering) methodologies. The model is divided into six phases: search and compilation of information, analysis of causes, design of the management model, test and validation of the model, analysis of results, and final adjustment of the model. The proposed model uses BIM tools and concepts and ICE sessions to improve the flow of information and the organizational relationship between participants in the design phase of construction works. In summary, the proposed model seeks to address the complexities of change management in construction through the use of BIM methodology and ICE sessions, improving communication and coordination between the different actors involved in infrastructure projects. |
publishDate |
2024 |
dc.date.accessioned.none.fl_str_mv |
2024-10-06T11:09:33Z |
dc.date.available.none.fl_str_mv |
2024-10-06T11:09:33Z |
dc.date.issued.fl_str_mv |
2024-01-01 |
dc.type.es_PE.fl_str_mv |
info:eu-repo/semantics/article |
format |
article |
dc.identifier.issn.none.fl_str_mv |
21903018 |
dc.identifier.doi.none.fl_str_mv |
10.1007/978-3-031-66961-3_50 |
dc.identifier.uri.none.fl_str_mv |
http://hdl.handle.net/10757/676020 |
dc.identifier.eissn.none.fl_str_mv |
21903026 |
dc.identifier.journal.es_PE.fl_str_mv |
Smart Innovation, Systems and Technologies |
dc.identifier.eid.none.fl_str_mv |
2-s2.0-85202621677 |
dc.identifier.scopusid.none.fl_str_mv |
SCOPUS_ID:85202621677 |
identifier_str_mv |
21903018 10.1007/978-3-031-66961-3_50 21903026 Smart Innovation, Systems and Technologies 2-s2.0-85202621677 SCOPUS_ID:85202621677 |
url |
http://hdl.handle.net/10757/676020 |
dc.language.iso.es_PE.fl_str_mv |
eng |
language |
eng |
dc.rights.es_PE.fl_str_mv |
info:eu-repo/semantics/embargoedAccess |
eu_rights_str_mv |
embargoedAccess |
dc.format.es_PE.fl_str_mv |
application/html |
dc.publisher.es_PE.fl_str_mv |
Springer Science and Business Media Deutschland GmbH |
dc.source.none.fl_str_mv |
reponame:UPC-Institucional instname:Universidad Peruana de Ciencias Aplicadas instacron:UPC |
instname_str |
Universidad Peruana de Ciencias Aplicadas |
instacron_str |
UPC |
institution |
UPC |
reponame_str |
UPC-Institucional |
collection |
UPC-Institucional |
dc.source.journaltitle.none.fl_str_mv |
Smart Innovation, Systems and Technologies |
dc.source.volume.none.fl_str_mv |
402 SIST |
dc.source.beginpage.none.fl_str_mv |
525 |
dc.source.endpage.none.fl_str_mv |
546 |
bitstream.url.fl_str_mv |
https://repositorioacademico.upc.edu.pe/bitstream/10757/676020/1/license.txt |
bitstream.checksum.fl_str_mv |
8a4605be74aa9ea9d79846c1fba20a33 |
bitstream.checksumAlgorithm.fl_str_mv |
MD5 |
repository.name.fl_str_mv |
Repositorio académico upc |
repository.mail.fl_str_mv |
upc@openrepository.com |
_version_ |
1837187181380108288 |
spelling |
ded05bad724f624f23291ae2ba8c7d76300f0ab0eadd8ad9931c21a97dffb7bfa8c300364b236e554fdcfb290959f6cb64b47cSardi, Andrea Natalia ValderramaRomero, Karla Rosario FernandezOliveros, Brian Irving Arriola2024-10-06T11:09:33Z2024-10-06T11:09:33Z2024-01-012190301810.1007/978-3-031-66961-3_50http://hdl.handle.net/10757/67602021903026Smart Innovation, Systems and Technologies2-s2.0-85202621677SCOPUS_ID:85202621677The construction industry is essential for the economic development of a country. However, changing management in these projects can be complex due to communication between different stakeholders. Construction changes are common and can occur at any stage of the project, which can have negative impacts on costs and schedules. It is important to have clear communication of the vision and benefits of changes before implementing them. The use of Information and Communication Technologies (ICT) in construction can improve communication, collaboration, knowledge management, and acquisition processes. In this context, a change management model is proposed in the design phase of infrastructure works based on the BIM (Building Information Modeling) and ICE (Interactive Concurrent Engineering) methodologies. The model is divided into six phases: search and compilation of information, analysis of causes, design of the management model, test and validation of the model, analysis of results, and final adjustment of the model. The proposed model uses BIM tools and concepts and ICE sessions to improve the flow of information and the organizational relationship between participants in the design phase of construction works. In summary, the proposed model seeks to address the complexities of change management in construction through the use of BIM methodology and ICE sessions, improving communication and coordination between the different actors involved in infrastructure projects.application/htmlengSpringer Science and Business Media Deutschland GmbHinfo:eu-repo/semantics/embargoedAccess3D ModelBIM MethodologyChange ManagementConstruction IndustryControlCoordinationICE SessionsInformation and Communication TechnologiesProposal of a Model for the Management of Changes in the Design Phase of Public Works of Educational Infrastructures Based on the BIM and ICE Methodologiesinfo:eu-repo/semantics/articleSmart Innovation, Systems and Technologies402 SIST525546reponame:UPC-Institucionalinstname:Universidad Peruana de Ciencias Aplicadasinstacron:UPCLICENSElicense.txtlicense.txttext/plain; charset=utf-81748https://repositorioacademico.upc.edu.pe/bitstream/10757/676020/1/license.txt8a4605be74aa9ea9d79846c1fba20a33MD51false10757/676020oai:repositorioacademico.upc.edu.pe:10757/6760202024-10-06 11:09:35.329Repositorio académico upcupc@openrepository.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 |
score |
13.95948 |
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).