Elaboración de un plan de mantenimiento correctivo programado de motores eléctricos síncronos de 1250 HP para la empresa minera – Metalúrgica Shougang Hierro Perú S.A., 2018

Descripción del Articulo

The synchronous motor of 1250 HP, 4 kV to 60 Hz of high performance and constant speed, corrects the power factor and drives the ball mill operating in the "Concentration" sub-process carried out in the Magnetic Plant of San Nicolás in the company Minera – Metalúrgica Shougang Hierro Perú...

Descripción completa

Detalles Bibliográficos
Autor: Herrera Salas, José Denilson
Formato: tesis de grado
Fecha de Publicación:2019
Institución:Universidad Tecnológica del Perú
Repositorio:UTP-Institucional
Lenguaje:español
OAI Identifier:oai:repositorio.utp.edu.pe:20.500.12867/2448
Enlace del recurso:https://hdl.handle.net/20.500.12867/2448
Nivel de acceso:acceso abierto
Materia:Mantenimiento y reparación
Programas de mantenimiento
Servicios de mantenimiento
Motores eléctricos
https://purl.org/pe-repo/ocde/ford#2.02.01
Descripción
Sumario:The synchronous motor of 1250 HP, 4 kV to 60 Hz of high performance and constant speed, corrects the power factor and drives the ball mill operating in the "Concentration" sub-process carried out in the Magnetic Plant of San Nicolás in the company Minera – Metalúrgica Shougang Hierro Perú S.A. The mill is called "milling medium" and uses 2" diameter carbon steel balls to obtain final products of iron ore with a diameter of 0.074 mm to 0.4 mm. In this subprocess, secondary milling is carried out, which consists in crushing and rectifying the ore. The interruptions in the productive process generated by operational problems in the synchronous motor, originate from the humid, highly corrosive and particulate contamination of the ore and are concentrated in the armature and field windings, constantly lowering the insulation resistance of these. Currently scheduled corrective maintenance is basic. The present "scheduled corrective maintenance plan of the synchronous motor" is elaborated, to significantly improve the continuity of the operation of the engine in question, achieving that the repair in the San Nicolás Electric Workshop (hereinafter, TE SN) is optimal. The electrical control tests are announced (procedural standards rules and compliance requirements: IEEE & IEC) and the finishing process through flow charts, quantifying costs and giving the objectives, conclusions and recommendations of the case to maintain the continuity of the production process.
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).