Optimization Model that Minimizes the Penalty Caused by Delayed Delivery of Construction Projects

Descripción del Articulo

Purpose: This work aims to minimize the penalty generated by delays in delivering construction projects operated by a single machine. Theoretical framework: The fundamental issues to develop this work are optimization and its application to delays in construction projects operated in their initial s...

Descripción completa

Detalles Bibliográficos
Autor: Arce Fernández,Nilthon
Formato: artículo
Fecha de Publicación:2023
Institución:Universidad Nacional de Jaén
Repositorio:UNJ-Institucional
Lenguaje:inglés
OAI Identifier:oai:repositorio.unj.edu.pe:20.500.14689/1041
Enlace del recurso:http://hdl.handle.net/20.500.14689/1041
https://doi.org/10.26668/businessreview/2023.v8i7.2553
Nivel de acceso:acceso abierto
Materia:optimization
penalty
construction project
mathematical model
projects with a single machine
https://purl.org/pe-repo/ocde/ford#1.01.02
Descripción
Sumario:Purpose: This work aims to minimize the penalty generated by delays in delivering construction projects operated by a single machine. Theoretical framework: The fundamental issues to develop this work are optimization and its application to delays in construction projects operated in their initial stage by a single machine. Design/Methodology/Approach: We presented a construction case study, developed an optimization model, implemented a computational optimization tool and obtained the optimal sequence to perform the tasks. Findings: The numerical results demonstrated the model’s usefulness in minimizing the penalty generated by delays in the delivery of projects. Research, practical & social implications: The benefit of this study is to help managers or decision-makers schedule their construction projects with limited resources and deadlines per activity to minimize penalty costs of delay. Originality/Value: Considering that the construction sector generates the largest labor force in Peru, the study has an important social value by providing a tool to improve operations and incentivize construction companies to continue operating. In addition, it provides a substantial basis for future work by applying optimization in a specific area of civil engineering. To our knowledge, no researcher or company in Peru has yet addressed this study.
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).