Mejora del proceso de producción de piezas industriales en la empresa SEFASI E.I.R.L mediante la técnica de las 5S y un plan de mantenimiento preventivo
Descripción del Articulo
The purpose of the research was to determine which activities do not add value to the product and create delays in the delivery process before its deadlines. To be able to determine this, a 5S plan will be implemented, as well as a preventive maintenance plan to the production line of the workshop,...
| Autores: | , |
|---|---|
| Formato: | tesis de grado |
| Fecha de Publicación: | 2021 |
| Institución: | Universidad de Lima |
| Repositorio: | ULIMA-Institucional |
| Lenguaje: | español |
| OAI Identifier: | oai:repositorio.ulima.edu.pe:20.500.12724/14315 |
| Enlace del recurso: | https://hdl.handle.net/20.500.12724/14315 |
| Nivel de acceso: | acceso abierto |
| Materia: | Líneas de montaje Administración de la producción Estudio de tiempos Assembly lines Production management Time study https://purl.org/pe-repo/ocde/ford#2.11.04 |
| id |
RULI_e1908f50a219b556ab5ebe01311cdaaf |
|---|---|
| oai_identifier_str |
oai:repositorio.ulima.edu.pe:20.500.12724/14315 |
| network_acronym_str |
RULI |
| network_name_str |
ULIMA-Institucional |
| repository_id_str |
3883 |
| dc.title.es_PE.fl_str_mv |
Mejora del proceso de producción de piezas industriales en la empresa SEFASI E.I.R.L mediante la técnica de las 5S y un plan de mantenimiento preventivo |
| title |
Mejora del proceso de producción de piezas industriales en la empresa SEFASI E.I.R.L mediante la técnica de las 5S y un plan de mantenimiento preventivo |
| spellingShingle |
Mejora del proceso de producción de piezas industriales en la empresa SEFASI E.I.R.L mediante la técnica de las 5S y un plan de mantenimiento preventivo Nuñez Castillo, Pablo Oscar Líneas de montaje Administración de la producción Estudio de tiempos Assembly lines Production management Time study https://purl.org/pe-repo/ocde/ford#2.11.04 |
| title_short |
Mejora del proceso de producción de piezas industriales en la empresa SEFASI E.I.R.L mediante la técnica de las 5S y un plan de mantenimiento preventivo |
| title_full |
Mejora del proceso de producción de piezas industriales en la empresa SEFASI E.I.R.L mediante la técnica de las 5S y un plan de mantenimiento preventivo |
| title_fullStr |
Mejora del proceso de producción de piezas industriales en la empresa SEFASI E.I.R.L mediante la técnica de las 5S y un plan de mantenimiento preventivo |
| title_full_unstemmed |
Mejora del proceso de producción de piezas industriales en la empresa SEFASI E.I.R.L mediante la técnica de las 5S y un plan de mantenimiento preventivo |
| title_sort |
Mejora del proceso de producción de piezas industriales en la empresa SEFASI E.I.R.L mediante la técnica de las 5S y un plan de mantenimiento preventivo |
| author |
Nuñez Castillo, Pablo Oscar |
| author_facet |
Nuñez Castillo, Pablo Oscar Perez Campos, Luis Jean Pierr |
| author_role |
author |
| author2 |
Perez Campos, Luis Jean Pierr |
| author2_role |
author |
| dc.contributor.advisor.fl_str_mv |
Lizárraga Portugal, Carlos Augusto |
| dc.contributor.author.fl_str_mv |
Nuñez Castillo, Pablo Oscar Perez Campos, Luis Jean Pierr |
| dc.subject.es_PE.fl_str_mv |
Líneas de montaje Administración de la producción Estudio de tiempos Assembly lines Production management Time study |
| topic |
Líneas de montaje Administración de la producción Estudio de tiempos Assembly lines Production management Time study https://purl.org/pe-repo/ocde/ford#2.11.04 |
| dc.subject.ocde.none.fl_str_mv |
https://purl.org/pe-repo/ocde/ford#2.11.04 |
| description |
The purpose of the research was to determine which activities do not add value to the product and create delays in the delivery process before its deadlines. To be able to determine this, a 5S plan will be implemented, as well as a preventive maintenance plan to the production line of the workshop, this way we will guarantee the company’s sustainability in an extremely competitive market. The proposals to improve will be focused on the manufacturing of one of the most representative products of the company; however, the benefits will impact on the whole production line as well as the remaining products give the fact that they share the same workstations, and equipment among products. Additionally, a 13-month deadline will be set to implement the necessary tools to develop the 5S plan and the preventive maintenance for the production line. First, an analysis to determine the company’s current situation will take place. Starting from a Value Stream Mapping (VSM), followed by a cause-effect diagram to determine the main causes of the company’s troublesome. Finally, after identifying the main process losses, more improvement opportunities will be identified to employ the selected tools. As a consequence of the improvements, it is expected to reduce the quantity of activities that do not add value to the process to 30% and get machine availability to 90% as the reduction of the quantity of inoperative machine hours during the year. All of the above, will be joined by TIR > COK and an indicator benefit/cost more than 1. |
| publishDate |
2021 |
| dc.date.accessioned.none.fl_str_mv |
2021-10-21T11:48:56Z |
| dc.date.available.none.fl_str_mv |
2021-10-21T11:48:56Z |
| dc.date.issued.fl_str_mv |
2021 |
| dc.type.none.fl_str_mv |
info:eu-repo/semantics/bachelorThesis |
| dc.type.other.none.fl_str_mv |
Tesis |
| format |
bachelorThesis |
| dc.identifier.citation.es_PE.fl_str_mv |
Nuñez Castillo, P. O. y Perez Campos, L. J. P. (2021). Mejora del proceso de producción de piezas industriales en la empresa SEFASI E.I.R.L mediante la técnica de las 5S y un plan de mantenimiento preventivo [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/14315 |
| dc.identifier.uri.none.fl_str_mv |
https://hdl.handle.net/20.500.12724/14315 |
| dc.identifier.isni.none.fl_str_mv |
121541816 |
| identifier_str_mv |
Nuñez Castillo, P. O. y Perez Campos, L. J. P. (2021). Mejora del proceso de producción de piezas industriales en la empresa SEFASI E.I.R.L mediante la técnica de las 5S y un plan de mantenimiento preventivo [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/14315 121541816 |
| url |
https://hdl.handle.net/20.500.12724/14315 |
| dc.language.iso.none.fl_str_mv |
spa |
| language |
spa |
| dc.relation.ispartof.fl_str_mv |
SUNEDU |
| dc.rights.*.fl_str_mv |
info:eu-repo/semantics/openAccess |
| dc.rights.uri.*.fl_str_mv |
https://creativecommons.org/licenses/by-nc-sa/4.0/ |
| eu_rights_str_mv |
openAccess |
| rights_invalid_str_mv |
https://creativecommons.org/licenses/by-nc-sa/4.0/ |
| dc.format.none.fl_str_mv |
application/pdf |
| dc.publisher.none.fl_str_mv |
Universidad de Lima |
| dc.publisher.country.none.fl_str_mv |
PE |
| publisher.none.fl_str_mv |
Universidad de Lima |
| dc.source.none.fl_str_mv |
Repositorio Institucional - Ulima Universidad de Lima reponame:ULIMA-Institucional instname:Universidad de Lima instacron:ULIMA |
| instname_str |
Universidad de Lima |
| instacron_str |
ULIMA |
| institution |
ULIMA |
| reponame_str |
ULIMA-Institucional |
| collection |
ULIMA-Institucional |
| bitstream.url.fl_str_mv |
https://repositorio.ulima.edu.pe/bitstream/20.500.12724/14315/3/license.txt https://repositorio.ulima.edu.pe/bitstream/20.500.12724/14315/4/Nu%c3%b1ez-Perez_Mejora-proceso-producci%c3%b3n.pdf.txt https://repositorio.ulima.edu.pe/bitstream/20.500.12724/14315/2/license_rdf https://repositorio.ulima.edu.pe/bitstream/20.500.12724/14315/1/Nu%c3%b1ez-Perez_Mejora-proceso-producci%c3%b3n.pdf https://repositorio.ulima.edu.pe/bitstream/20.500.12724/14315/5/Nu%c3%b1ez-Perez_Mejora-proceso-producci%c3%b3n.pdf.jpg |
| bitstream.checksum.fl_str_mv |
8a4605be74aa9ea9d79846c1fba20a33 b3d6876cb146c50193852f74f63acd47 8fc46f5e71650fd7adee84a69b9163c2 53bda65484d67bb42ad20bf064c32171 ca98df44c2a67798661cc78192d96e2e |
| bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 MD5 MD5 MD5 |
| repository.name.fl_str_mv |
Repositorio Universidad de Lima |
| repository.mail.fl_str_mv |
repositorio@ulima.edu.pe |
| _version_ |
1847246187844861952 |
| spelling |
Lizárraga Portugal, Carlos AugustoNuñez Castillo, Pablo OscarPerez Campos, Luis Jean Pierr2021-10-21T11:48:56Z2021-10-21T11:48:56Z2021Nuñez Castillo, P. O. y Perez Campos, L. J. P. (2021). Mejora del proceso de producción de piezas industriales en la empresa SEFASI E.I.R.L mediante la técnica de las 5S y un plan de mantenimiento preventivo [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/14315https://hdl.handle.net/20.500.12724/14315121541816The purpose of the research was to determine which activities do not add value to the product and create delays in the delivery process before its deadlines. To be able to determine this, a 5S plan will be implemented, as well as a preventive maintenance plan to the production line of the workshop, this way we will guarantee the company’s sustainability in an extremely competitive market. The proposals to improve will be focused on the manufacturing of one of the most representative products of the company; however, the benefits will impact on the whole production line as well as the remaining products give the fact that they share the same workstations, and equipment among products. Additionally, a 13-month deadline will be set to implement the necessary tools to develop the 5S plan and the preventive maintenance for the production line. First, an analysis to determine the company’s current situation will take place. Starting from a Value Stream Mapping (VSM), followed by a cause-effect diagram to determine the main causes of the company’s troublesome. Finally, after identifying the main process losses, more improvement opportunities will be identified to employ the selected tools. As a consequence of the improvements, it is expected to reduce the quantity of activities that do not add value to the process to 30% and get machine availability to 90% as the reduction of the quantity of inoperative machine hours during the year. All of the above, will be joined by TIR > COK and an indicator benefit/cost more than 1.El presente trabajo tiene como objetivo disminuir las actividades que no añaden valor al producto y generan retrasos en la entrega de los pedidos de piezas industriales dentro de los plazos establecidos, esto se busca conseguir a partir de la implementación la técnica de 5S; así como, un plan de mantenimiento preventivo, garantizando de esta forma la sostenibilidad de la empresa dentro de un mercado sumamente competitivo. El alcance de las propuestas de mejora se enfocará en la fabricación de uno de los productos más representativos de la empresa, no obstante, los beneficios impactarán en toda la línea de producción, así como, en el resto de productos fabricados en el taller, ya que comparten las mismas estaciones de trabajo y maquinaria entre un producto y otro. Así mismo, se destinará el plazo de 3 meses, para la implementación de las herramientas necesarias para el desarrollo del plan piloto de 5S y plan de mantenimiento preventivo. Lo primero que se realizará será el análisis de la situación actual de la empresa, el cual partirá de la técnica de Mapa de Flujo del Valor (VSM) actual, seguido por diagrama causa-efecto, determinado las causas raíces de la problemática en la empresa, finalmente, se dará enfoque a aquellas causas seleccionadas como las más críticas. Por otro lado, identificado las principales pérdidas del proceso, se procederán a identificar las oportunidades de mejora en las que se emplearán las herramientas seleccionadas. Como consecuencia de las mejoras implementadas, se espera reducir las actividades que no agregan valor al proceso al 30% y contar con una disponibilidad de máquina del 90%; así mismo, reducir a 470 la cantidad de minutos perdidos por parada no prevista de máquina a la semana. Todo esto acompañado de un TIR > COK y un indicador Beneficio/Costo mayor a 1.application/pdfspaUniversidad de LimaPEinfo:eu-repo/semantics/openAccesshttps://creativecommons.org/licenses/by-nc-sa/4.0/Repositorio Institucional - UlimaUniversidad de Limareponame:ULIMA-Institucionalinstname:Universidad de Limainstacron:ULIMALíneas de montajeAdministración de la producciónEstudio de tiemposAssembly linesProduction managementTime studyhttps://purl.org/pe-repo/ocde/ford#2.11.04Mejora del proceso de producción de piezas industriales en la empresa SEFASI E.I.R.L mediante la técnica de las 5S y un plan de mantenimiento preventivoinfo:eu-repo/semantics/bachelorThesisTesisSUNEDUTítulo ProfesionalIngeniería IndustrialUniversidad de Lima. Facultad de Ingeniería y ArquitecturaIngeniero Industrialhttps://orcid.org/0000-0002-7057-4099436913527220264685036648007635https://purl.org/pe-repo/renati/level#tituloProfesionalSotomayor Cabrera, ArístidesReaño Vera, Abel Antonio MartinGálvez Zárate, Carloshttps://purl.org/pe-repo/renati/type#tesisOILICENSElicense.txtlicense.txttext/plain; charset=utf-81748https://repositorio.ulima.edu.pe/bitstream/20.500.12724/14315/3/license.txt8a4605be74aa9ea9d79846c1fba20a33MD53TEXTNuñez-Perez_Mejora-proceso-producción.pdf.txtNuñez-Perez_Mejora-proceso-producción.pdf.txtExtracted texttext/plain110191https://repositorio.ulima.edu.pe/bitstream/20.500.12724/14315/4/Nu%c3%b1ez-Perez_Mejora-proceso-producci%c3%b3n.pdf.txtb3d6876cb146c50193852f74f63acd47MD54CC-LICENSElicense_rdflicense_rdfapplication/rdf+xml; charset=utf-81037https://repositorio.ulima.edu.pe/bitstream/20.500.12724/14315/2/license_rdf8fc46f5e71650fd7adee84a69b9163c2MD52ORIGINALNuñez-Perez_Mejora-proceso-producción.pdfNuñez-Perez_Mejora-proceso-producción.pdfTesisapplication/pdf1595526https://repositorio.ulima.edu.pe/bitstream/20.500.12724/14315/1/Nu%c3%b1ez-Perez_Mejora-proceso-producci%c3%b3n.pdf53bda65484d67bb42ad20bf064c32171MD51THUMBNAILNuñez-Perez_Mejora-proceso-producción.pdf.jpgNuñez-Perez_Mejora-proceso-producción.pdf.jpgGenerated Thumbnailimage/jpeg12071https://repositorio.ulima.edu.pe/bitstream/20.500.12724/14315/5/Nu%c3%b1ez-Perez_Mejora-proceso-producci%c3%b3n.pdf.jpgca98df44c2a67798661cc78192d96e2eMD5520.500.12724/14315oai:repositorio.ulima.edu.pe:20.500.12724/143152025-09-17 13:55:03.614Repositorio Universidad de Limarepositorio@ulima.edu.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 |
| score |
12.883251 |
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).