Estudio de prefactibilidad para la instalación de una planta productora de muebles multifunción de dormitorio, elaborados a base de melamina

Descripción del Articulo

The present study seeks to apply the tools and concepts used in the industrial engineering career for the implementation of a bedroom furniture production plant. This product has as a target market in Metropolitan Lima, addressing the socioeconomic levels B and C1,. Also, it is segmented according t...

Descripción completa

Detalles Bibliográficos
Autor: Arenas Martos, Natali
Formato: tesis de grado
Fecha de Publicación:2019
Institución:Universidad de Lima
Repositorio:ULIMA-Institucional
Lenguaje:español
OAI Identifier:oai:repositorio.ulima.edu.pe:20.500.12724/11278
Enlace del recurso:https://hdl.handle.net/20.500.12724/11278
http://doi.org/10.26439/ulima.tesis/11278
Nivel de acceso:acceso abierto
Materia:Furniture
Furniture industry
Particle board
Industrial projects
Muebles
Industria del mueble
Proyectos industriales
Tableros aglomerados
https://purl.org/pe-repo/ocde/ford#2.11.04
Descripción
Sumario:The present study seeks to apply the tools and concepts used in the industrial engineering career for the implementation of a bedroom furniture production plant. This product has as a target market in Metropolitan Lima, addressing the socioeconomic levels B and C1,. Also, it is segmented according to age range to people from 18 to 55 years. The product is sold unarmed at a price of S / .1 203.60, which includes installation and shipping. The plant is located in the Villa el Salvador district in the province of Metropolitan Lima. A maximum production capacity of 5,243 units was determined, the bottleneck being the stage of the drilling process, in addition to having a semi-automatic production process. Regarding the financial and economic analysis, an investment of 1 008 629 soles was determined, in which 60% corresponds to external financing by a banking entity. A financial NPV of 944,102 soles, a financial IRR of 74% and a cost benefit value equal to 3.34 soles were estimated in the project's life horizon corresponding to 6 years, in addition to an estimated investment recovery period of 2 years, 7 months and 2 days, demonstrating the financial viability of the project. Finally, a positive effect on the contribution to society is determined since an aggregate value of 6,529,182.40 soles and a capital density of 18,678.31 soles / employment is generated.
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).