Estudio de prefactibilidad para la instalación de una planta de producción de sidra a partir de manzana delicia con miel de abeja
Descripción del Articulo
This pre-feasibility study will analyze the commercial, technical and economic viability of implementing a plant for the production of cider from "manzana Delicia" and honey in Peru. The product in mention is obtained through the fermentation of apple juice and bee honey, with a semi-sweet...
Autores: | , |
---|---|
Formato: | tesis de grado |
Fecha de Publicación: | 2020 |
Institución: | Universidad de Lima |
Repositorio: | ULIMA-Institucional |
Lenguaje: | español |
OAI Identifier: | oai:repositorio.ulima.edu.pe:20.500.12724/12301 |
Enlace del recurso: | https://hdl.handle.net/20.500.12724/12301 |
Nivel de acceso: | acceso abierto |
Materia: | Cider industry Alcoholic beverage industry Feasibility studies Industria de la sidra Industria de las bebidas alcohólicas Estudios de factibilidad https://purl.org/pe-repo/ocde/ford#2.11.04 |
Sumario: | This pre-feasibility study will analyze the commercial, technical and economic viability of implementing a plant for the production of cider from "manzana Delicia" and honey in Peru. The product in mention is obtained through the fermentation of apple juice and bee honey, with a semi-sweet and slightly carbonated flavor in a 330 ml presentation. It results attractive due to the growth in format of beverages "ready to drink" and as excellent alternative since it is free of gluten. Market studies were conducted and consumption patterns were analyzed, which allowed a psychographic segmentation of the market, establishing a target audience that belongs to the NSE A and B of Metropolitan Lima in the age range between 18-60 years. After defining the commercial viability, a technical investigation was performed which determined, by means of location analysis, that the district of Lurin is the most suitable for the location of the plant. For this purpose, critical factors were established and a factor ranking was carried out at macro level (provinces) and micro level (districts). The size of the market is the limitation of the project with 438,302 liters of cider per year. With such information, the analysis on the engineering required by the project was made, by which it was determined that the necessary area for the plant is of 718m2 and 17 collaborators are needed. Finally, the economic, financial and social viability of the pre-feasibility study was determined, concluding that the project would be profitable, obtaining in the economic evaluation a NPV of S/ 3,091,171, an IRR of 57% and a recovery period of 3.53 years. On the other hand, the financial evaluation obtained a NPV of S/ 3,619,072, an IRR of 74% and a recovery period of 2.86 years. |
---|
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).