Estudio de prefactibilidad para la instalación de una planta productora de snacks de manzana deshidratada
Descripción del Articulo
The aim of this research is to determine the market, technological, economic, financial, and social viability of the project over five years. In this context, a market study is carried out and the target market is selected. Women between 25 and 39 years-old belonging to economic sectors A and B of z...
| Autores: | , |
|---|---|
| Formato: | tesis de grado |
| Fecha de Publicación: | 2020 |
| Institución: | Universidad de Lima |
| Repositorio: | ULIMA-Institucional |
| Lenguaje: | español |
| OAI Identifier: | oai:repositorio.ulima.edu.pe:20.500.12724/12720 |
| Enlace del recurso: | https://hdl.handle.net/20.500.12724/12720 |
| Nivel de acceso: | acceso abierto |
| Materia: | Snacks Apples Feasibility studies Manzanas Estudios de factibilidad https://purl.org/pe-repo/ocde/ford#2.11.04 |
| id |
RULI_330e3c42a99cd19e6eef4acd31cb7f0c |
|---|---|
| oai_identifier_str |
oai:repositorio.ulima.edu.pe:20.500.12724/12720 |
| network_acronym_str |
RULI |
| network_name_str |
ULIMA-Institucional |
| repository_id_str |
3883 |
| dc.title.es_PE.fl_str_mv |
Estudio de prefactibilidad para la instalación de una planta productora de snacks de manzana deshidratada |
| title |
Estudio de prefactibilidad para la instalación de una planta productora de snacks de manzana deshidratada |
| spellingShingle |
Estudio de prefactibilidad para la instalación de una planta productora de snacks de manzana deshidratada Aizcorbe Santillana, Thais Snacks Apples Feasibility studies Manzanas Estudios de factibilidad https://purl.org/pe-repo/ocde/ford#2.11.04 |
| title_short |
Estudio de prefactibilidad para la instalación de una planta productora de snacks de manzana deshidratada |
| title_full |
Estudio de prefactibilidad para la instalación de una planta productora de snacks de manzana deshidratada |
| title_fullStr |
Estudio de prefactibilidad para la instalación de una planta productora de snacks de manzana deshidratada |
| title_full_unstemmed |
Estudio de prefactibilidad para la instalación de una planta productora de snacks de manzana deshidratada |
| title_sort |
Estudio de prefactibilidad para la instalación de una planta productora de snacks de manzana deshidratada |
| author |
Aizcorbe Santillana, Thais |
| author_facet |
Aizcorbe Santillana, Thais Alegre Moretti, Maria Alejandra |
| author_role |
author |
| author2 |
Alegre Moretti, Maria Alejandra |
| author2_role |
author |
| dc.contributor.advisor.fl_str_mv |
Carreño Bardales, Pedro César |
| dc.contributor.author.fl_str_mv |
Aizcorbe Santillana, Thais Alegre Moretti, Maria Alejandra |
| dc.subject.en_EN.fl_str_mv |
Snacks Apples Feasibility studies |
| topic |
Snacks Apples Feasibility studies Manzanas Estudios de factibilidad https://purl.org/pe-repo/ocde/ford#2.11.04 |
| dc.subject.es_PE.fl_str_mv |
Manzanas Estudios de factibilidad |
| dc.subject.ocde.none.fl_str_mv |
https://purl.org/pe-repo/ocde/ford#2.11.04 |
| description |
The aim of this research is to determine the market, technological, economic, financial, and social viability of the project over five years. In this context, a market study is carried out and the target market is selected. Women between 25 and 39 years-old belonging to economic sectors A and B of zones 7 and 8 of Lima become the ideal target market for dried apple snacks, since they are the ones who mostly pursue a healthy lifestyle and who do not have economic limitations to buy products that may contribute to their lifestyle. They will be able to buy these snacks in supermarkets, convenience stores and organic stores. The price set for these establishments will be S/740 per box, which will include 100 bags of snacks of 40g each. The production plant will be installed in Chilca, district of Lima selected for having more competitive advantages and the plant size corresponds to the market-size relationship, equivalent to 13 010 kilograms of product. The technology necessary to carry out the snacks production process exists and works. Also, the installed capacity of the plant is only limited by the activity of verification and selection of raw material. The company in charge of producing these dried snacks will be the closed company “Snacks MT S.A.C”, whose organization chart will be made up of the CEO, 04 managers, executives, quality inspectors, operators and warehousemen. Regarding the economic and financial viability of the study is validated that, in the positive and pessimistic scenario proposed, the NPV is positive, the IRR is greater than the cost of capital (16%) and the B/C ratio is greater than zero, in both cases. Lastly, regarding the social evaluation of the study is shown that the implementation of the plant will bring new job opportunities. |
| publishDate |
2020 |
| dc.date.accessioned.none.fl_str_mv |
2021-03-17T02:14:09Z |
| dc.date.available.none.fl_str_mv |
2021-03-17T02:14:09Z |
| dc.date.issued.fl_str_mv |
2020 |
| dc.type.none.fl_str_mv |
info:eu-repo/semantics/bachelorThesis |
| dc.type.other.none.fl_str_mv |
Tesis |
| format |
bachelorThesis |
| dc.identifier.citation.es_PE.fl_str_mv |
Aizcorbe Santillana, T. y Alegre Moretti, M. A. (2020). Estudio de prefactibilidad para la instalación de una planta productora de snacks de manzana deshidratada [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/12720 |
| dc.identifier.uri.none.fl_str_mv |
https://hdl.handle.net/20.500.12724/12720 |
| dc.identifier.isni.none.fl_str_mv |
121541816 |
| identifier_str_mv |
Aizcorbe Santillana, T. y Alegre Moretti, M. A. (2020). Estudio de prefactibilidad para la instalación de una planta productora de snacks de manzana deshidratada [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/12720 121541816 |
| url |
https://hdl.handle.net/20.500.12724/12720 |
| dc.language.iso.none.fl_str_mv |
spa |
| language |
spa |
| dc.relation.ispartof.fl_str_mv |
SUNEDU |
| dc.rights.*.fl_str_mv |
info:eu-repo/semantics/openAccess |
| dc.rights.uri.*.fl_str_mv |
https://creativecommons.org/licenses/by-nc-sa/4.0/ |
| eu_rights_str_mv |
openAccess |
| rights_invalid_str_mv |
https://creativecommons.org/licenses/by-nc-sa/4.0/ |
| dc.format.none.fl_str_mv |
application/pdf |
| dc.publisher.none.fl_str_mv |
Universidad de Lima |
| dc.publisher.country.none.fl_str_mv |
PE |
| publisher.none.fl_str_mv |
Universidad de Lima |
| dc.source.none.fl_str_mv |
Repositorio Institucional - Ulima Universidad de Lima reponame:ULIMA-Institucional instname:Universidad de Lima instacron:ULIMA |
| instname_str |
Universidad de Lima |
| instacron_str |
ULIMA |
| institution |
ULIMA |
| reponame_str |
ULIMA-Institucional |
| collection |
ULIMA-Institucional |
| bitstream.url.fl_str_mv |
https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12720/4/Aizcorde_Estudio-prefactibilidad-instalacion.pdf.txt https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12720/1/Aizcorde_Estudio-prefactibilidad-instalacion.pdf https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12720/2/license_rdf https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12720/3/license.txt https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12720/5/Aizcorde_Estudio-prefactibilidad-instalacion.pdf.jpg |
| bitstream.checksum.fl_str_mv |
a4932c3968e2b1ea7d98be42bf5fc7e6 002875110837e38746b876c0247272bc 3655808e5dd46167956d6870b0f43800 8a4605be74aa9ea9d79846c1fba20a33 025f920937d55d1fd369f61cb7739aa3 |
| bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 MD5 MD5 MD5 |
| repository.name.fl_str_mv |
Repositorio Universidad de Lima |
| repository.mail.fl_str_mv |
repositorio@ulima.edu.pe |
| _version_ |
1847246049770471424 |
| spelling |
Carreño Bardales, Pedro CésarAizcorbe Santillana, ThaisAlegre Moretti, Maria Alejandra2021-03-17T02:14:09Z2021-03-17T02:14:09Z2020Aizcorbe Santillana, T. y Alegre Moretti, M. A. (2020). Estudio de prefactibilidad para la instalación de una planta productora de snacks de manzana deshidratada [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/12720https://hdl.handle.net/20.500.12724/12720121541816The aim of this research is to determine the market, technological, economic, financial, and social viability of the project over five years. In this context, a market study is carried out and the target market is selected. Women between 25 and 39 years-old belonging to economic sectors A and B of zones 7 and 8 of Lima become the ideal target market for dried apple snacks, since they are the ones who mostly pursue a healthy lifestyle and who do not have economic limitations to buy products that may contribute to their lifestyle. They will be able to buy these snacks in supermarkets, convenience stores and organic stores. The price set for these establishments will be S/740 per box, which will include 100 bags of snacks of 40g each. The production plant will be installed in Chilca, district of Lima selected for having more competitive advantages and the plant size corresponds to the market-size relationship, equivalent to 13 010 kilograms of product. The technology necessary to carry out the snacks production process exists and works. Also, the installed capacity of the plant is only limited by the activity of verification and selection of raw material. The company in charge of producing these dried snacks will be the closed company “Snacks MT S.A.C”, whose organization chart will be made up of the CEO, 04 managers, executives, quality inspectors, operators and warehousemen. Regarding the economic and financial viability of the study is validated that, in the positive and pessimistic scenario proposed, the NPV is positive, the IRR is greater than the cost of capital (16%) and the B/C ratio is greater than zero, in both cases. Lastly, regarding the social evaluation of the study is shown that the implementation of the plant will bring new job opportunities.El objetivo del presente estudio de prefactibilidad es determinar la viabilidad de mercado, tecnológica, económica, financiera y social de la instalación de una planta productora de snacks de manzana delicia deshidratada en un horizonte de cinco años. Para ello, se realiza un estudio de mercado, en el cual se determina que la población objetivo del producto son mujeres entre 25 y 39 años pertenecientes a los sectores económicos A y B de las zonas 7 y 8 de Lima Metropolitana, por ser ellas quienes muestran una inclinación mayor en llevar una vida saludable y quienes a su vez, no presentan limitantes en su poder adquisitivo para comprar productos que contribuyan a su estilo de vida. Cabe resaltar, que ellas podrán encontrar los snacks deshidratados en establecimientos comerciales tales como supermercados, tiendas por convivencia y tiendas orgánicas. El precio de venta fijado a estos establecimientos será de S/740 por caja, en la cual se incluirán 100 bolsas de snacks de 40g cada una. La planta productora será instalada en Chilca, distrito de Lima seleccionado por presentar mayores ventajas competitivas y el tamaño de planta definido corresponde a la relación tamaño-mercado, equivalente a 13 010 kilogramos de producto terminado. Por otro lado, la tecnología necesaria para llevar a cabo el proceso productivo de los snacks existe y funciona. Y, se valida que la capacidad instalada de la planta se encuentra únicamente limitada por la actividad de verificación y selección de la materia prima. Con respecto a la organización, la empresa encargada de la elaboración de estos productos deshidratados será la sociedad anónima cerrada “Snacks MT S.A.C”, cuyo organigrama estará conformado por el gestor del negocio, 04 jefes, ejecutivos, inspectores de calidad, operarios y almaceneros. Asimismo, con respecto a la viabilidad económica y financiera del estudio, se valida que, tanto en el escenario positivo como en el pesimista propuestos, el VAN es positivo, la TIR es mayor que el costo de capital (16%) y la relación B/C es mayor a cero. Por último, con respecto a la viabilidad social del estudio, se demuestra que la puesta en marcha de la planta traerá consigo nuevas oportunidades laborales a compatriotas.application/pdfspaUniversidad de LimaPEinfo:eu-repo/semantics/openAccesshttps://creativecommons.org/licenses/by-nc-sa/4.0/Repositorio Institucional - UlimaUniversidad de Limareponame:ULIMA-Institucionalinstname:Universidad de Limainstacron:ULIMASnacksApplesFeasibility studiesManzanasEstudios de factibilidadhttps://purl.org/pe-repo/ocde/ford#2.11.04Estudio de prefactibilidad para la instalación de una planta productora de snacks de manzana deshidratadainfo:eu-repo/semantics/bachelorThesisTesisSUNEDUTítulo ProfesionalIngeniería IndustrialUniversidad de Lima. Facultad de Ingeniería y ArquitecturaIngeniero Industrialhttps://orcid.org/0000-0001-5163-911X093030517220264819415176128622https://purl.org/pe-repo/renati/level#tituloProfesionalKleeberg Hidalgo, FernandoCarreño Bardales, Pedro CesarBibolotti Sabla, GianninaLuna Victoria León, Gustavohttps://purl.org/pe-repo/renati/type#tesisOITEXTAizcorde_Estudio-prefactibilidad-instalacion.pdf.txtAizcorde_Estudio-prefactibilidad-instalacion.pdf.txtExtracted texttext/plain231562https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12720/4/Aizcorde_Estudio-prefactibilidad-instalacion.pdf.txta4932c3968e2b1ea7d98be42bf5fc7e6MD54ORIGINALAizcorde_Estudio-prefactibilidad-instalacion.pdfAizcorde_Estudio-prefactibilidad-instalacion.pdfapplication/pdf3358061https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12720/1/Aizcorde_Estudio-prefactibilidad-instalacion.pdf002875110837e38746b876c0247272bcMD51CC-LICENSElicense_rdflicense_rdfapplication/rdf+xml; charset=utf-8811https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12720/2/license_rdf3655808e5dd46167956d6870b0f43800MD52LICENSElicense.txtlicense.txttext/plain; charset=utf-81748https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12720/3/license.txt8a4605be74aa9ea9d79846c1fba20a33MD53THUMBNAILAizcorde_Estudio-prefactibilidad-instalacion.pdf.jpgAizcorde_Estudio-prefactibilidad-instalacion.pdf.jpgGenerated Thumbnailimage/jpeg10838https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12720/5/Aizcorde_Estudio-prefactibilidad-instalacion.pdf.jpg025f920937d55d1fd369f61cb7739aa3MD5520.500.12724/12720oai:repositorio.ulima.edu.pe:20.500.12724/127202025-09-17 13:54:59.494Repositorio Universidad de Limarepositorio@ulima.edu.peTk9URTogUExBQ0UgWU9VUiBPV04gTElDRU5TRSBIRVJFClRoaXMgc2FtcGxlIGxpY2Vuc2UgaXMgcHJvdmlkZWQgZm9yIGluZm9ybWF0aW9uYWwgcHVycG9zZXMgb25seS4KCk5PTi1FWENMVVNJVkUgRElTVFJJQlVUSU9OIExJQ0VOU0UKCkJ5IHNpZ25pbmcgYW5kIHN1Ym1pdHRpbmcgdGhpcyBsaWNlbnNlLCB5b3UgKHRoZSBhdXRob3Iocykgb3IgY29weXJpZ2h0Cm93bmVyKSBncmFudHMgdG8gRFNwYWNlIFVuaXZlcnNpdHkgKERTVSkgdGhlIG5vbi1leGNsdXNpdmUgcmlnaHQgdG8gcmVwcm9kdWNlLAp0cmFuc2xhdGUgKGFzIGRlZmluZWQgYmVsb3cpLCBhbmQvb3IgZGlzdHJpYnV0ZSB5b3VyIHN1Ym1pc3Npb24gKGluY2x1ZGluZwp0aGUgYWJzdHJhY3QpIHdvcmxkd2lkZSBpbiBwcmludCBhbmQgZWxlY3Ryb25pYyBmb3JtYXQgYW5kIGluIGFueSBtZWRpdW0sCmluY2x1ZGluZyBidXQgbm90IGxpbWl0ZWQgdG8gYXVkaW8gb3IgdmlkZW8uCgpZb3UgYWdyZWUgdGhhdCBEU1UgbWF5LCB3aXRob3V0IGNoYW5naW5nIHRoZSBjb250ZW50LCB0cmFuc2xhdGUgdGhlCnN1Ym1pc3Npb24gdG8gYW55IG1lZGl1bSBvciBmb3JtYXQgZm9yIHRoZSBwdXJwb3NlIG9mIHByZXNlcnZhdGlvbi4KCllvdSBhbHNvIGFncmVlIHRoYXQgRFNVIG1heSBrZWVwIG1vcmUgdGhhbiBvbmUgY29weSBvZiB0aGlzIHN1Ym1pc3Npb24gZm9yCnB1cnBvc2VzIG9mIHNlY3VyaXR5LCBiYWNrLXVwIGFuZCBwcmVzZXJ2YXRpb24uCgpZb3UgcmVwcmVzZW50IHRoYXQgdGhlIHN1Ym1pc3Npb24gaXMgeW91ciBvcmlnaW5hbCB3b3JrLCBhbmQgdGhhdCB5b3UgaGF2ZQp0aGUgcmlnaHQgdG8gZ3JhbnQgdGhlIHJpZ2h0cyBjb250YWluZWQgaW4gdGhpcyBsaWNlbnNlLiBZb3UgYWxzbyByZXByZXNlbnQKdGhhdCB5b3VyIHN1Ym1pc3Npb24gZG9lcyBub3QsIHRvIHRoZSBiZXN0IG9mIHlvdXIga25vd2xlZGdlLCBpbmZyaW5nZSB1cG9uCmFueW9uZSdzIGNvcHlyaWdodC4KCklmIHRoZSBzdWJtaXNzaW9uIGNvbnRhaW5zIG1hdGVyaWFsIGZvciB3aGljaCB5b3UgZG8gbm90IGhvbGQgY29weXJpZ2h0LAp5b3UgcmVwcmVzZW50IHRoYXQgeW91IGhhdmUgb2J0YWluZWQgdGhlIHVucmVzdHJpY3RlZCBwZXJtaXNzaW9uIG9mIHRoZQpjb3B5cmlnaHQgb3duZXIgdG8gZ3JhbnQgRFNVIHRoZSByaWdodHMgcmVxdWlyZWQgYnkgdGhpcyBsaWNlbnNlLCBhbmQgdGhhdApzdWNoIHRoaXJkLXBhcnR5IG93bmVkIG1hdGVyaWFsIGlzIGNsZWFybHkgaWRlbnRpZmllZCBhbmQgYWNrbm93bGVkZ2VkCndpdGhpbiB0aGUgdGV4dCBvciBjb250ZW50IG9mIHRoZSBzdWJtaXNzaW9uLgoKSUYgVEhFIFNVQk1JU1NJT04gSVMgQkFTRUQgVVBPTiBXT1JLIFRIQVQgSEFTIEJFRU4gU1BPTlNPUkVEIE9SIFNVUFBPUlRFRApCWSBBTiBBR0VOQ1kgT1IgT1JHQU5JWkFUSU9OIE9USEVSIFRIQU4gRFNVLCBZT1UgUkVQUkVTRU5UIFRIQVQgWU9VIEhBVkUKRlVMRklMTEVEIEFOWSBSSUdIVCBPRiBSRVZJRVcgT1IgT1RIRVIgT0JMSUdBVElPTlMgUkVRVUlSRUQgQlkgU1VDSApDT05UUkFDVCBPUiBBR1JFRU1FTlQuCgpEU1Ugd2lsbCBjbGVhcmx5IGlkZW50aWZ5IHlvdXIgbmFtZShzKSBhcyB0aGUgYXV0aG9yKHMpIG9yIG93bmVyKHMpIG9mIHRoZQpzdWJtaXNzaW9uLCBhbmQgd2lsbCBub3QgbWFrZSBhbnkgYWx0ZXJhdGlvbiwgb3RoZXIgdGhhbiBhcyBhbGxvd2VkIGJ5IHRoaXMKbGljZW5zZSwgdG8geW91ciBzdWJtaXNzaW9uLgo= |
| score |
13.0499325 |
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).