Optimization of educational infrastructure projects through an integral risk management plan, Puno case, 2018
Descripción del Articulo
As a consequence of the national policy of economic reactivation of the last governments, the aim is to improve the construction sector, however, the stoppage rates of works also increase, the application of a Risk Management Plan being important. The objective was to develop an Integral Plan for th...
Autor: | |
---|---|
Formato: | artículo |
Fecha de Publicación: | 2022 |
Institución: | Universidad Privada de Tacna |
Repositorio: | Revistas - Universidad Privada de Tacna |
Lenguaje: | español |
OAI Identifier: | oai:ojs2.172.30.101.191:article/685 |
Enlace del recurso: | https://revistas.upt.edu.pe/ojs/index.php/vestsc/article/view/685 |
Nivel de acceso: | acceso abierto |
id |
REVUPT_1407013f6c0b2dbe41ef17d917c8a2dd |
---|---|
oai_identifier_str |
oai:ojs2.172.30.101.191:article/685 |
network_acronym_str |
REVUPT |
network_name_str |
Revistas - Universidad Privada de Tacna |
repository_id_str |
|
spelling |
Optimization of educational infrastructure projects through an integral risk management plan, Puno case, 2018Optimización de proyectos de infraestructura educativa mediante un plan integral de gestión de riesgos previsibles, caso Puno, 2018Flores Asencio, SandraAs a consequence of the national policy of economic reactivation of the last governments, the aim is to improve the construction sector, however, the stoppage rates of works also increase, the application of a Risk Management Plan being important. The objective was to develop an Integral Plan for the Management of Foreseeable Risks as a proposal to be included in the Technical File, for the planning of the execution of works by direct administration of educational infrastructure projects according to current norms and regulations, aimed at optimizing investment in works. public in the Puno Region. The research method is mixed. The techniques used were documentary analysis, Risk Mapping identification, Risklog risk registry, RBS risk breakdown structure and data assessment through Monte Carlo Simulation. The study population is 22 educational institutions and a case study, the sample is selected and not random. The Integral Risk Management Plan improves the execution of works by direct administration of educational infrastructure, optimizing cost, time, scope and quality, determining an increase of 7.91%, representing a significantly low percentage compared to the increase of 229.16% without the application. of risk management.Como consecuencia de la política nacional de reactivación económica de los últimos gobiernos, se busca mejorar el sector construcción, sin embargo, los índices de paralización de obras también incrementan, siendo importante la aplicación de un Plan de Gestión de Riesgos. El objetivo fue desarrollar un Plan Integral de Gestión de Riesgos Previsibles como propuesta a incluirse en el Expediente Técnico, para la planificación de la ejecución de obras por administración directa de proyectos de infraestructura educativa según norma y reglamento vigente, orientado a optimizar la inversión en obras públicas en la Región de Puno. El método de investigación es mixto. Las técnicas utilizadas fueron el análisis documental, identificación Risk Mapping, registro de riesgos Risklog, estructura de desglose de riesgos RBS y valoración de datos a través de la Simulación de Monte Carlo. La población de estudio son 22 instituciones educativas y un estudio de caso, la muestra es seleccionada y no al azar. El Plan Integral de Gestión de Riesgos mejora la ejecución de las obras por administración directa de Infraestructura educativa, optimizando el costo, tiempo, alcance y calidad, determinándose un incremento de 7.91% representando un porcentaje significativamente bajo respecto al incremento de 229.16% sin la aplicación de gestión de riesgo.Universidad Privada de Tacna2022-11-30info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdftext/htmlhttps://revistas.upt.edu.pe/ojs/index.php/vestsc/article/view/68510.47796/ves.v11i2.685Veritas et Scientia; Vol. 11 Núm. 2 (2022): Veritas et Scientia; 294 – 307Veritas et Scientia; Vol 11 No 2 (2022): Veritas et Scientia; 294 – 3072617-06392307-513910.47796/ves.v11i2reponame:Revistas - Universidad Privada de Tacnainstname:Universidad Privada de Tacnainstacron:UPTspahttps://revistas.upt.edu.pe/ojs/index.php/vestsc/article/view/685/681https://revistas.upt.edu.pe/ojs/index.php/vestsc/article/view/685/727Derechos de autor 2022 Sandra Flores Asenciohttp://creativecommons.org/licenses/by/4.0info:eu-repo/semantics/openAccessoai:ojs2.172.30.101.191:article/6852022-12-21T18:45:31Z |
dc.title.none.fl_str_mv |
Optimization of educational infrastructure projects through an integral risk management plan, Puno case, 2018 Optimización de proyectos de infraestructura educativa mediante un plan integral de gestión de riesgos previsibles, caso Puno, 2018 |
title |
Optimization of educational infrastructure projects through an integral risk management plan, Puno case, 2018 |
spellingShingle |
Optimization of educational infrastructure projects through an integral risk management plan, Puno case, 2018 Flores Asencio, Sandra |
title_short |
Optimization of educational infrastructure projects through an integral risk management plan, Puno case, 2018 |
title_full |
Optimization of educational infrastructure projects through an integral risk management plan, Puno case, 2018 |
title_fullStr |
Optimization of educational infrastructure projects through an integral risk management plan, Puno case, 2018 |
title_full_unstemmed |
Optimization of educational infrastructure projects through an integral risk management plan, Puno case, 2018 |
title_sort |
Optimization of educational infrastructure projects through an integral risk management plan, Puno case, 2018 |
dc.creator.none.fl_str_mv |
Flores Asencio, Sandra |
author |
Flores Asencio, Sandra |
author_facet |
Flores Asencio, Sandra |
author_role |
author |
description |
As a consequence of the national policy of economic reactivation of the last governments, the aim is to improve the construction sector, however, the stoppage rates of works also increase, the application of a Risk Management Plan being important. The objective was to develop an Integral Plan for the Management of Foreseeable Risks as a proposal to be included in the Technical File, for the planning of the execution of works by direct administration of educational infrastructure projects according to current norms and regulations, aimed at optimizing investment in works. public in the Puno Region. The research method is mixed. The techniques used were documentary analysis, Risk Mapping identification, Risklog risk registry, RBS risk breakdown structure and data assessment through Monte Carlo Simulation. The study population is 22 educational institutions and a case study, the sample is selected and not random. The Integral Risk Management Plan improves the execution of works by direct administration of educational infrastructure, optimizing cost, time, scope and quality, determining an increase of 7.91%, representing a significantly low percentage compared to the increase of 229.16% without the application. of risk management. |
publishDate |
2022 |
dc.date.none.fl_str_mv |
2022-11-30 |
dc.type.none.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.none.fl_str_mv |
https://revistas.upt.edu.pe/ojs/index.php/vestsc/article/view/685 10.47796/ves.v11i2.685 |
url |
https://revistas.upt.edu.pe/ojs/index.php/vestsc/article/view/685 |
identifier_str_mv |
10.47796/ves.v11i2.685 |
dc.language.none.fl_str_mv |
spa |
language |
spa |
dc.relation.none.fl_str_mv |
https://revistas.upt.edu.pe/ojs/index.php/vestsc/article/view/685/681 https://revistas.upt.edu.pe/ojs/index.php/vestsc/article/view/685/727 |
dc.rights.none.fl_str_mv |
Derechos de autor 2022 Sandra Flores Asencio http://creativecommons.org/licenses/by/4.0 info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Derechos de autor 2022 Sandra Flores Asencio http://creativecommons.org/licenses/by/4.0 |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf text/html |
dc.publisher.none.fl_str_mv |
Universidad Privada de Tacna |
publisher.none.fl_str_mv |
Universidad Privada de Tacna |
dc.source.none.fl_str_mv |
Veritas et Scientia; Vol. 11 Núm. 2 (2022): Veritas et Scientia; 294 – 307 Veritas et Scientia; Vol 11 No 2 (2022): Veritas et Scientia; 294 – 307 2617-0639 2307-5139 10.47796/ves.v11i2 reponame:Revistas - Universidad Privada de Tacna instname:Universidad Privada de Tacna instacron:UPT |
instname_str |
Universidad Privada de Tacna |
instacron_str |
UPT |
institution |
UPT |
reponame_str |
Revistas - Universidad Privada de Tacna |
collection |
Revistas - Universidad Privada de Tacna |
repository.name.fl_str_mv |
|
repository.mail.fl_str_mv |
|
_version_ |
1771324561375100928 |
score |
13.754616 |
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).