Probabilistic analysis of project scheduling, how to incorporate uncertainty into project management

Descripción del Articulo

Project evaluation must consider both investment costs and completion times, both of which are subject to uncertainty. This article presents an approach to explicitly incorporate the uncertainty in the duration of activities necessary to complete a project. The PERT and CPM methods, widely adopted i...

Descripción completa

Detalles Bibliográficos
Autor: Salinas Ortiz, José
Formato: artículo
Fecha de Publicación:2024
Institución:Universidad Nacional de Ingeniería
Repositorio:Revistas - Universidad Nacional de Ingeniería
Lenguaje:español
inglés
OAI Identifier:oai:oai:revistas.uni.edu.pe:article/2235
Enlace del recurso:https://revistas.uni.edu.pe/index.php/iecos/article/view/2235
Nivel de acceso:acceso abierto
Materia:incertidumbre
proyecto
inversión
probabilístico
gestión
uncertainty
project
investment
probabilistic
management
id REVUNI_81b53b42c21c99be946ddbfc46d2f19b
oai_identifier_str oai:oai:revistas.uni.edu.pe:article/2235
network_acronym_str REVUNI
network_name_str Revistas - Universidad Nacional de Ingeniería
repository_id_str
spelling Probabilistic analysis of project scheduling, how to incorporate uncertainty into project managementAnálisis probabilístico de la programación de proyectos, cómo incorporar incertidumbre en la gestión de proyectosSalinas Ortiz, JoséincertidumbreproyectoinversiónprobabilísticogestiónuncertaintyprojectinvestmentprobabilisticmanagementProject evaluation must consider both investment costs and completion times, both of which are subject to uncertainty. This article presents an approach to explicitly incorporate the uncertainty in the duration of activities necessary to complete a project. The PERT and CPM methods, widely adopted in industry and government since the 1950s, help manage the interdependence of project activities. Although originally differentiated by their handling of time and cost, these methods share the limitation of not adequately considering uncertainty. They use three-time estimates (optimistic, most likely, and pessimistic) for a "probabilistic analysis" of the critical path, but this approach does not address multiple scenarios nor adjust the critical path based on actual time variations. To overcome these limitations, an Excel model was developed that allows for a more appropriate probabilistic analysis of the project's completion time. The article details the objectives of the new procedure and the steps necessary to incorporate uncertainty, using a simple example of constructing an industrial plant. Conclusions and recommendations are presented at the end of the article.La evaluación de proyectos debe considerar tanto los costos de inversión como los tiempos de culminación, ambos sujetos a incertidumbre. Este artículo presenta un enfoque para incorporar explícitamente la incertidumbre en los tiempos de duración de las actividades necesarias para completar un proyecto. Los métodos PERT y CPM, ampliamente adoptados en la industria y el gobierno desde los años cincuenta, ayudan a gestionar la interdependencia de las actividades del proyecto. Aunque originalmente diferenciados en el manejo del tiempo y costo, estos métodos comparten la limitación de no considerar adecuadamente la incertidumbre. Se utilizan tres estimaciones de tiempo (optimista, más probable y pesimista) para un “análisis probabilístico” de la ruta crítica, pero este enfoque no aborda múltiples escenarios ni ajusta la ruta crítica en función de la variación real en los tiempos. Para superar estas limitaciones, se desarrolló un modelo en Excel que permite un análisis probabilístico más adecuado del tiempo de terminación del proyecto. El artículo detalla los objetivos del nuevo procedimiento y los pasos necesarios para incorporar la incertidumbre, utilizando un ejemplo simple de construcción de una planta industrial. Las conclusiones y recomendaciones se presentan al final del artículo.Universidad Nacional de Ingeniería2024-09-27info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionPeer ReviewedEvaluado por paresapplication/pdftext/htmlapplication/epub+zipaudio/mpegaudio/mpeghttps://revistas.uni.edu.pe/index.php/iecos/article/view/223510.21754/iecos.v25i2.2235revista IECOS; Vol. 25 No. 2 (2024); 11-34Revista IECOS; Vol. 25 Núm. 2 (2024); 11-342788-74802961-284510.21754/iecos.v25i2reponame:Revistas - Universidad Nacional de Ingenieríainstname:Universidad Nacional de Ingenieríainstacron:UNIspaenghttps://revistas.uni.edu.pe/index.php/iecos/article/view/2235/3024https://revistas.uni.edu.pe/index.php/iecos/article/view/2235/2995https://revistas.uni.edu.pe/index.php/iecos/article/view/2235/2996https://revistas.uni.edu.pe/index.php/iecos/article/view/2235/2997https://revistas.uni.edu.pe/index.php/iecos/article/view/2235/2998Derechos de autor 2024 José Salinas Ortizhttps://creativecommons.org/licenses/by/4.0info:eu-repo/semantics/openAccessoai:oai:revistas.uni.edu.pe:article/22352025-01-04T23:38:46Z
dc.title.none.fl_str_mv Probabilistic analysis of project scheduling, how to incorporate uncertainty into project management
Análisis probabilístico de la programación de proyectos, cómo incorporar incertidumbre en la gestión de proyectos
title Probabilistic analysis of project scheduling, how to incorporate uncertainty into project management
spellingShingle Probabilistic analysis of project scheduling, how to incorporate uncertainty into project management
Salinas Ortiz, José
incertidumbre
proyecto
inversión
probabilístico
gestión
uncertainty
project
investment
probabilistic
management
title_short Probabilistic analysis of project scheduling, how to incorporate uncertainty into project management
title_full Probabilistic analysis of project scheduling, how to incorporate uncertainty into project management
title_fullStr Probabilistic analysis of project scheduling, how to incorporate uncertainty into project management
title_full_unstemmed Probabilistic analysis of project scheduling, how to incorporate uncertainty into project management
title_sort Probabilistic analysis of project scheduling, how to incorporate uncertainty into project management
dc.creator.none.fl_str_mv Salinas Ortiz, José
author Salinas Ortiz, José
author_facet Salinas Ortiz, José
author_role author
dc.subject.none.fl_str_mv incertidumbre
proyecto
inversión
probabilístico
gestión
uncertainty
project
investment
probabilistic
management
topic incertidumbre
proyecto
inversión
probabilístico
gestión
uncertainty
project
investment
probabilistic
management
description Project evaluation must consider both investment costs and completion times, both of which are subject to uncertainty. This article presents an approach to explicitly incorporate the uncertainty in the duration of activities necessary to complete a project. The PERT and CPM methods, widely adopted in industry and government since the 1950s, help manage the interdependence of project activities. Although originally differentiated by their handling of time and cost, these methods share the limitation of not adequately considering uncertainty. They use three-time estimates (optimistic, most likely, and pessimistic) for a "probabilistic analysis" of the critical path, but this approach does not address multiple scenarios nor adjust the critical path based on actual time variations. To overcome these limitations, an Excel model was developed that allows for a more appropriate probabilistic analysis of the project's completion time. The article details the objectives of the new procedure and the steps necessary to incorporate uncertainty, using a simple example of constructing an industrial plant. Conclusions and recommendations are presented at the end of the article.
publishDate 2024
dc.date.none.fl_str_mv 2024-09-27
dc.type.none.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
Peer Reviewed
Evaluado por pares
format article
status_str publishedVersion
dc.identifier.none.fl_str_mv https://revistas.uni.edu.pe/index.php/iecos/article/view/2235
10.21754/iecos.v25i2.2235
url https://revistas.uni.edu.pe/index.php/iecos/article/view/2235
identifier_str_mv 10.21754/iecos.v25i2.2235
dc.language.none.fl_str_mv spa
eng
language spa
eng
dc.relation.none.fl_str_mv https://revistas.uni.edu.pe/index.php/iecos/article/view/2235/3024
https://revistas.uni.edu.pe/index.php/iecos/article/view/2235/2995
https://revistas.uni.edu.pe/index.php/iecos/article/view/2235/2996
https://revistas.uni.edu.pe/index.php/iecos/article/view/2235/2997
https://revistas.uni.edu.pe/index.php/iecos/article/view/2235/2998
dc.rights.none.fl_str_mv Derechos de autor 2024 José Salinas Ortiz
https://creativecommons.org/licenses/by/4.0
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Derechos de autor 2024 José Salinas Ortiz
https://creativecommons.org/licenses/by/4.0
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
text/html
application/epub+zip
audio/mpeg
audio/mpeg
dc.publisher.none.fl_str_mv Universidad Nacional de Ingeniería
publisher.none.fl_str_mv Universidad Nacional de Ingeniería
dc.source.none.fl_str_mv revista IECOS; Vol. 25 No. 2 (2024); 11-34
Revista IECOS; Vol. 25 Núm. 2 (2024); 11-34
2788-7480
2961-2845
10.21754/iecos.v25i2
reponame:Revistas - Universidad Nacional de Ingeniería
instname:Universidad Nacional de Ingeniería
instacron:UNI
instname_str Universidad Nacional de Ingeniería
instacron_str UNI
institution UNI
reponame_str Revistas - Universidad Nacional de Ingeniería
collection Revistas - Universidad Nacional de Ingeniería
repository.name.fl_str_mv
repository.mail.fl_str_mv
_version_ 1833562790538772480
score 13.924177
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).