Risk analysis in a multilevel supply model

Descripción del Articulo

This research proposes stress tests to evaluate a set of hypothetical crisis scenarios linked with periods of greater volatility in a sample of commercial transactions among three companies from a multilevel supply model. The solution identifies cost-related levels of impact for a set of hypothetica...

Descripción completa

Detalles Bibliográficos
Autores: Escalante, Jesús, Monsreal Barrera, Ileana Camila, García Lira, Alan, Santos Flores, Jorge, Casanovas-Garcia, Josep
Formato: artículo
Fecha de Publicación:2019
Institución:Universidad de Lima
Repositorio:Revistas - Universidad de Lima
Lenguaje:español
OAI Identifier:oai:ojs.pkp.sfu.ca:article/4541
Enlace del recurso:https://revistas.ulima.edu.pe/index.php/Ingenieria_industrial/article/view/4541
Nivel de acceso:acceso abierto
id REVULIMA_1685e4467a8c48d0b29c8fa08e2c48f3
oai_identifier_str oai:ojs.pkp.sfu.ca:article/4541
network_acronym_str REVULIMA
network_name_str Revistas - Universidad de Lima
repository_id_str
spelling Risk analysis in a multilevel supply modelAnálisis del riesgo en un modelo multinivel de suministroEscalante, JesúsMonsreal Barrera, Ileana CamilaGarcía Lira, AlanSantos Flores, JorgeCasanovas-Garcia, JosepThis research proposes stress tests to evaluate a set of hypothetical crisis scenarios linked with periods of greater volatility in a sample of commercial transactions among three companies from a multilevel supply model. The solution identifies cost-related levels of impact for a set of hypothetical scenarios associated with parameters such as levels of reliability and volatility in a risky time horizon.La investigación propone las pruebas de estrés para evaluar un conjunto de escenarios hipotéticos de crisis vinculados a periodos con mayor volatilidad, dada una muestra de transacciones comerciales entre tres entidades de un modelo multinivel de suministro. La solución identifica los niveles de impacto en términos de costo para un conjunto de escenarios hipotéticos asociados a parámetros tales como niveles de confiabilidad y volatilidad en un horizonte temporal de riesgo.Universidad de Lima2019-10-29info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://revistas.ulima.edu.pe/index.php/Ingenieria_industrial/article/view/454110.26439/ing.ind2019.n037.4541Ingeniería Industrial; No. 037 (2019); 33-49Ingeniería Industrial; Núm. 037 (2019); 33-492523-63261025-992910.26439/ing.ind2019.n037reponame:Revistas - Universidad de Limainstname:Universidad de Limainstacron:ULIMAspahttps://revistas.ulima.edu.pe/index.php/Ingenieria_industrial/article/view/4541/4486info:eu-repo/semantics/openAccessoai:ojs.pkp.sfu.ca:article/45412023-07-21T20:50:21Z
dc.title.none.fl_str_mv Risk analysis in a multilevel supply model
Análisis del riesgo en un modelo multinivel de suministro
title Risk analysis in a multilevel supply model
spellingShingle Risk analysis in a multilevel supply model
Escalante, Jesús
title_short Risk analysis in a multilevel supply model
title_full Risk analysis in a multilevel supply model
title_fullStr Risk analysis in a multilevel supply model
title_full_unstemmed Risk analysis in a multilevel supply model
title_sort Risk analysis in a multilevel supply model
dc.creator.none.fl_str_mv Escalante, Jesús
Monsreal Barrera, Ileana Camila
García Lira, Alan
Santos Flores, Jorge
Casanovas-Garcia, Josep
author Escalante, Jesús
author_facet Escalante, Jesús
Monsreal Barrera, Ileana Camila
García Lira, Alan
Santos Flores, Jorge
Casanovas-Garcia, Josep
author_role author
author2 Monsreal Barrera, Ileana Camila
García Lira, Alan
Santos Flores, Jorge
Casanovas-Garcia, Josep
author2_role author
author
author
author
description This research proposes stress tests to evaluate a set of hypothetical crisis scenarios linked with periods of greater volatility in a sample of commercial transactions among three companies from a multilevel supply model. The solution identifies cost-related levels of impact for a set of hypothetical scenarios associated with parameters such as levels of reliability and volatility in a risky time horizon.
publishDate 2019
dc.date.none.fl_str_mv 2019-10-29
dc.type.none.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.none.fl_str_mv https://revistas.ulima.edu.pe/index.php/Ingenieria_industrial/article/view/4541
10.26439/ing.ind2019.n037.4541
url https://revistas.ulima.edu.pe/index.php/Ingenieria_industrial/article/view/4541
identifier_str_mv 10.26439/ing.ind2019.n037.4541
dc.language.none.fl_str_mv spa
language spa
dc.relation.none.fl_str_mv https://revistas.ulima.edu.pe/index.php/Ingenieria_industrial/article/view/4541/4486
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidad de Lima
publisher.none.fl_str_mv Universidad de Lima
dc.source.none.fl_str_mv Ingeniería Industrial; No. 037 (2019); 33-49
Ingeniería Industrial; Núm. 037 (2019); 33-49
2523-6326
1025-9929
10.26439/ing.ind2019.n037
reponame:Revistas - Universidad de Lima
instname:Universidad de Lima
instacron:ULIMA
instname_str Universidad de Lima
instacron_str ULIMA
institution ULIMA
reponame_str Revistas - Universidad de Lima
collection Revistas - Universidad de Lima
repository.name.fl_str_mv
repository.mail.fl_str_mv
_version_ 1846791800308629504
score 13.897231
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).