Management methodology based on lean construction and pmbok; To improve productivity in construction projects.

Descripción del Articulo

The article presents the results about processes related to project management, with the aim of proposing a methodology based on Lean Construction and the fundamentals of the PMBOK Guide; that allows to improve the productivity of construction projects. The methodology obtained from integrating the...

Descripción completa

Detalles Bibliográficos
Autor: Margot Millones Mateus
Formato: artículo
Fecha de Publicación:2020
Institución:Universidad Católica de Santa María
Repositorio:Revistas - Universidad Católica de Santa María
Lenguaje:español
OAI Identifier:oai:ojs.revistas.ucsm.edu.pe:article/276
Enlace del recurso:https://revistas.ucsm.edu.pe/ojs/index.php/veritas/article/view/276
Nivel de acceso:acceso abierto
Materia:Lean Construction
PMI
Productividad
id REVUCSM_02c6b9a64cd38673a36f9f2c3e9153a4
oai_identifier_str oai:ojs.revistas.ucsm.edu.pe:article/276
network_acronym_str REVUCSM
network_name_str Revistas - Universidad Católica de Santa María
repository_id_str
spelling Management methodology based on lean construction and pmbok; To improve productivity in construction projects. Metodología de gestión basada en lean construction y pmbok; Para mejorar la productividad en proyectos de construcción.Margot Millones MateusLean ConstructionPMIProductividadThe article presents the results about processes related to project management, with the aim of proposing a methodology based on Lean Construction and the fundamentals of the PMBOK Guide; that allows to improve the productivity of construction projects. The methodology obtained from integrating the Last Planner Planning scenario, the planning process group, as well as the PMI scenario monitoring and control process group (Fundamentals of the PMBOK Guide); will optimize the factors that affect the planning and monitoring and control of construction projects by improving their productivity; reflected in the improvement of the quality, time and cost of the project. The optimization of the Sub-profile profiling process without material input generated great results (outputs) such as the reduction of the time (execution period) from 98 days to 68 days and the reduction of the cost of S/. 255,851.59 to S/. 230,061.70; these outputs are per unit of consumption (inputs) corresponding to the efficiently managed resources (labor, equipment and materials) and an effective quality control.El artículo expone resultados, acerca de procesos vinculados con la gestión de proyectos, con el objetivo de proponer una metodología basada en Lean Construction y en los fundamentos de la Guía del PMBOK; que permita mejorar la productividad en proyectos de construcción. La metodología obtenida de integrar el escenario de la Planificación Last Planner, al grupo de procesos de planificación, así como al grupo de procesos de monitoreo y control del escenario del PMI (Fundamentos de la Guía del PMBOK); logrará optimizar los factores que afectan la planificación, el monitoreo y control de proyectos de construcción mejorando su productividad; reflejándose en la mejora de la calidad, tiempo y costo del proyecto. La optimización del proceso de Perfilado de la subrasante sin aporte de material generó grandes resultados (outputs) como la reducción del tiempo (plazo de ejecución) de 98 días a 68 días y la reducción del costo de S/. 255,851.59 a S/. 230,061.70; estos outputs son por unidad de consumo (inputs) que corresponde a los recursos administrados eficientemente (Mano de obra, equipo y materiales) y a un eficaz control de calidad.Universidad Católica de Santa María2020-10-30info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://revistas.ucsm.edu.pe/ojs/index.php/veritas/article/view/27610.35286/veritas.v21i2.276Veritas; Vol. 21 Núm. 2 (2020): VÉRITAS: Investigación, Innovación y Desarrollo; 39-44Veritas; Vol. 21 Núm. 2 (2020): VÉRITAS: Investigación, Innovación y Desarrollo; 39-44Veritas; Vol. 21 Núm. 2 (2020): VÉRITAS: Investigación, Innovación y Desarrollo; 39-441684-78221684-782210.35286/veritas.v21i2reponame:Revistas - Universidad Católica de Santa Maríainstname:Universidad Católica de Santa Maríainstacron:UCSMspahttps://revistas.ucsm.edu.pe/ojs/index.php/veritas/article/view/276/196Derechos de autor 2020 Veritasinfo:eu-repo/semantics/openAccessoai:ojs.revistas.ucsm.edu.pe:article/2762021-11-19T17:27:02Z
dc.title.none.fl_str_mv Management methodology based on lean construction and pmbok; To improve productivity in construction projects.
Metodología de gestión basada en lean construction y pmbok; Para mejorar la productividad en proyectos de construcción.

title Management methodology based on lean construction and pmbok; To improve productivity in construction projects.
spellingShingle Management methodology based on lean construction and pmbok; To improve productivity in construction projects.
Margot Millones Mateus
Lean Construction
PMI
Productividad
title_short Management methodology based on lean construction and pmbok; To improve productivity in construction projects.
title_full Management methodology based on lean construction and pmbok; To improve productivity in construction projects.
title_fullStr Management methodology based on lean construction and pmbok; To improve productivity in construction projects.
title_full_unstemmed Management methodology based on lean construction and pmbok; To improve productivity in construction projects.
title_sort Management methodology based on lean construction and pmbok; To improve productivity in construction projects.
dc.creator.none.fl_str_mv Margot Millones Mateus
author Margot Millones Mateus
author_facet Margot Millones Mateus
author_role author
dc.subject.none.fl_str_mv Lean Construction
PMI
Productividad
topic Lean Construction
PMI
Productividad
description The article presents the results about processes related to project management, with the aim of proposing a methodology based on Lean Construction and the fundamentals of the PMBOK Guide; that allows to improve the productivity of construction projects. The methodology obtained from integrating the Last Planner Planning scenario, the planning process group, as well as the PMI scenario monitoring and control process group (Fundamentals of the PMBOK Guide); will optimize the factors that affect the planning and monitoring and control of construction projects by improving their productivity; reflected in the improvement of the quality, time and cost of the project. The optimization of the Sub-profile profiling process without material input generated great results (outputs) such as the reduction of the time (execution period) from 98 days to 68 days and the reduction of the cost of S/. 255,851.59 to S/. 230,061.70; these outputs are per unit of consumption (inputs) corresponding to the efficiently managed resources (labor, equipment and materials) and an effective quality control.
publishDate 2020
dc.date.none.fl_str_mv 2020-10-30
dc.type.none.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.none.fl_str_mv https://revistas.ucsm.edu.pe/ojs/index.php/veritas/article/view/276
10.35286/veritas.v21i2.276
url https://revistas.ucsm.edu.pe/ojs/index.php/veritas/article/view/276
identifier_str_mv 10.35286/veritas.v21i2.276
dc.language.none.fl_str_mv spa
language spa
dc.relation.none.fl_str_mv https://revistas.ucsm.edu.pe/ojs/index.php/veritas/article/view/276/196
dc.rights.none.fl_str_mv Derechos de autor 2020 Veritas
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Derechos de autor 2020 Veritas
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidad Católica de Santa María
publisher.none.fl_str_mv Universidad Católica de Santa María
dc.source.none.fl_str_mv Veritas; Vol. 21 Núm. 2 (2020): VÉRITAS: Investigación, Innovación y Desarrollo; 39-44
Veritas; Vol. 21 Núm. 2 (2020): VÉRITAS: Investigación, Innovación y Desarrollo; 39-44
Veritas; Vol. 21 Núm. 2 (2020): VÉRITAS: Investigación, Innovación y Desarrollo; 39-44
1684-7822
1684-7822
10.35286/veritas.v21i2
reponame:Revistas - Universidad Católica de Santa María
instname:Universidad Católica de Santa María
instacron:UCSM
instname_str Universidad Católica de Santa María
instacron_str UCSM
institution UCSM
reponame_str Revistas - Universidad Católica de Santa María
collection Revistas - Universidad Católica de Santa María
repository.name.fl_str_mv
repository.mail.fl_str_mv
_version_ 1835917557977055232
score 13.958958
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).