Management methodology based on lean construction and pmbok; To improve productivity in construction projects.
Descripción del Articulo
The article presents the results about processes related to project management, with the aim of proposing a methodology based on Lean Construction and the fundamentals of the PMBOK Guide; that allows to improve the productivity of construction projects. The methodology obtained from integrating the...
Autor: | |
---|---|
Formato: | artículo |
Fecha de Publicación: | 2020 |
Institución: | Universidad Católica de Santa María |
Repositorio: | Revistas - Universidad Católica de Santa María |
Lenguaje: | español |
OAI Identifier: | oai:ojs.revistas.ucsm.edu.pe:article/276 |
Enlace del recurso: | https://revistas.ucsm.edu.pe/ojs/index.php/veritas/article/view/276 |
Nivel de acceso: | acceso abierto |
Materia: | Lean Construction PMI Productividad |
id |
REVUCSM_02c6b9a64cd38673a36f9f2c3e9153a4 |
---|---|
oai_identifier_str |
oai:ojs.revistas.ucsm.edu.pe:article/276 |
network_acronym_str |
REVUCSM |
network_name_str |
Revistas - Universidad Católica de Santa María |
repository_id_str |
|
spelling |
Management methodology based on lean construction and pmbok; To improve productivity in construction projects. Metodología de gestión basada en lean construction y pmbok; Para mejorar la productividad en proyectos de construcción.Margot Millones MateusLean ConstructionPMIProductividadThe article presents the results about processes related to project management, with the aim of proposing a methodology based on Lean Construction and the fundamentals of the PMBOK Guide; that allows to improve the productivity of construction projects. The methodology obtained from integrating the Last Planner Planning scenario, the planning process group, as well as the PMI scenario monitoring and control process group (Fundamentals of the PMBOK Guide); will optimize the factors that affect the planning and monitoring and control of construction projects by improving their productivity; reflected in the improvement of the quality, time and cost of the project. The optimization of the Sub-profile profiling process without material input generated great results (outputs) such as the reduction of the time (execution period) from 98 days to 68 days and the reduction of the cost of S/. 255,851.59 to S/. 230,061.70; these outputs are per unit of consumption (inputs) corresponding to the efficiently managed resources (labor, equipment and materials) and an effective quality control.El artículo expone resultados, acerca de procesos vinculados con la gestión de proyectos, con el objetivo de proponer una metodología basada en Lean Construction y en los fundamentos de la Guía del PMBOK; que permita mejorar la productividad en proyectos de construcción. La metodología obtenida de integrar el escenario de la Planificación Last Planner, al grupo de procesos de planificación, así como al grupo de procesos de monitoreo y control del escenario del PMI (Fundamentos de la Guía del PMBOK); logrará optimizar los factores que afectan la planificación, el monitoreo y control de proyectos de construcción mejorando su productividad; reflejándose en la mejora de la calidad, tiempo y costo del proyecto. La optimización del proceso de Perfilado de la subrasante sin aporte de material generó grandes resultados (outputs) como la reducción del tiempo (plazo de ejecución) de 98 días a 68 días y la reducción del costo de S/. 255,851.59 a S/. 230,061.70; estos outputs son por unidad de consumo (inputs) que corresponde a los recursos administrados eficientemente (Mano de obra, equipo y materiales) y a un eficaz control de calidad.Universidad Católica de Santa María2020-10-30info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://revistas.ucsm.edu.pe/ojs/index.php/veritas/article/view/27610.35286/veritas.v21i2.276Veritas; Vol. 21 Núm. 2 (2020): VÉRITAS: Investigación, Innovación y Desarrollo; 39-44Veritas; Vol. 21 Núm. 2 (2020): VÉRITAS: Investigación, Innovación y Desarrollo; 39-44Veritas; Vol. 21 Núm. 2 (2020): VÉRITAS: Investigación, Innovación y Desarrollo; 39-441684-78221684-782210.35286/veritas.v21i2reponame:Revistas - Universidad Católica de Santa Maríainstname:Universidad Católica de Santa Maríainstacron:UCSMspahttps://revistas.ucsm.edu.pe/ojs/index.php/veritas/article/view/276/196Derechos de autor 2020 Veritasinfo:eu-repo/semantics/openAccessoai:ojs.revistas.ucsm.edu.pe:article/2762021-11-19T17:27:02Z |
dc.title.none.fl_str_mv |
Management methodology based on lean construction and pmbok; To improve productivity in construction projects. Metodología de gestión basada en lean construction y pmbok; Para mejorar la productividad en proyectos de construcción. |
title |
Management methodology based on lean construction and pmbok; To improve productivity in construction projects. |
spellingShingle |
Management methodology based on lean construction and pmbok; To improve productivity in construction projects. Margot Millones Mateus Lean Construction PMI Productividad |
title_short |
Management methodology based on lean construction and pmbok; To improve productivity in construction projects. |
title_full |
Management methodology based on lean construction and pmbok; To improve productivity in construction projects. |
title_fullStr |
Management methodology based on lean construction and pmbok; To improve productivity in construction projects. |
title_full_unstemmed |
Management methodology based on lean construction and pmbok; To improve productivity in construction projects. |
title_sort |
Management methodology based on lean construction and pmbok; To improve productivity in construction projects. |
dc.creator.none.fl_str_mv |
Margot Millones Mateus |
author |
Margot Millones Mateus |
author_facet |
Margot Millones Mateus |
author_role |
author |
dc.subject.none.fl_str_mv |
Lean Construction PMI Productividad |
topic |
Lean Construction PMI Productividad |
description |
The article presents the results about processes related to project management, with the aim of proposing a methodology based on Lean Construction and the fundamentals of the PMBOK Guide; that allows to improve the productivity of construction projects. The methodology obtained from integrating the Last Planner Planning scenario, the planning process group, as well as the PMI scenario monitoring and control process group (Fundamentals of the PMBOK Guide); will optimize the factors that affect the planning and monitoring and control of construction projects by improving their productivity; reflected in the improvement of the quality, time and cost of the project. The optimization of the Sub-profile profiling process without material input generated great results (outputs) such as the reduction of the time (execution period) from 98 days to 68 days and the reduction of the cost of S/. 255,851.59 to S/. 230,061.70; these outputs are per unit of consumption (inputs) corresponding to the efficiently managed resources (labor, equipment and materials) and an effective quality control. |
publishDate |
2020 |
dc.date.none.fl_str_mv |
2020-10-30 |
dc.type.none.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.none.fl_str_mv |
https://revistas.ucsm.edu.pe/ojs/index.php/veritas/article/view/276 10.35286/veritas.v21i2.276 |
url |
https://revistas.ucsm.edu.pe/ojs/index.php/veritas/article/view/276 |
identifier_str_mv |
10.35286/veritas.v21i2.276 |
dc.language.none.fl_str_mv |
spa |
language |
spa |
dc.relation.none.fl_str_mv |
https://revistas.ucsm.edu.pe/ojs/index.php/veritas/article/view/276/196 |
dc.rights.none.fl_str_mv |
Derechos de autor 2020 Veritas info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Derechos de autor 2020 Veritas |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
Universidad Católica de Santa María |
publisher.none.fl_str_mv |
Universidad Católica de Santa María |
dc.source.none.fl_str_mv |
Veritas; Vol. 21 Núm. 2 (2020): VÉRITAS: Investigación, Innovación y Desarrollo; 39-44 Veritas; Vol. 21 Núm. 2 (2020): VÉRITAS: Investigación, Innovación y Desarrollo; 39-44 Veritas; Vol. 21 Núm. 2 (2020): VÉRITAS: Investigación, Innovación y Desarrollo; 39-44 1684-7822 1684-7822 10.35286/veritas.v21i2 reponame:Revistas - Universidad Católica de Santa María instname:Universidad Católica de Santa María instacron:UCSM |
instname_str |
Universidad Católica de Santa María |
instacron_str |
UCSM |
institution |
UCSM |
reponame_str |
Revistas - Universidad Católica de Santa María |
collection |
Revistas - Universidad Católica de Santa María |
repository.name.fl_str_mv |
|
repository.mail.fl_str_mv |
|
_version_ |
1835917557977055232 |
score |
13.958958 |
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).