Liabilities and remedies of the changed circumstances caused by the COVID-19 in construction projects around the world
Descripción del Articulo
Essentially, the loss suffered by the global construction industry during the time when the COVID-19 is spread is not caused by that pandemic itself but caused by a changed circumstance which mainly resulted by anti-COVID-19 policy or law conducted by different jurisdictions. Where contract keeps si...
Autor: | |
---|---|
Formato: | artículo |
Fecha de Publicación: | 2020 |
Institución: | Pontificia Universidad Católica del Perú |
Repositorio: | Revistas - Pontificia Universidad Católica del Perú |
Lenguaje: | inglés |
OAI Identifier: | oai:revistaspuc:article/23253 |
Enlace del recurso: | http://revistas.pucp.edu.pe/index.php/derechoysociedad/article/view/23253 |
Nivel de acceso: | acceso abierto |
Materia: | Los efectos del COVID-19 Proyectos de construcción en el mundo Cambio de circunstancias Fuerza mayor Doctrina del hardship Remedios en costo y en tiempo The effect of COVID-19 Construction projects in the world Changed circumstances Force Majeure Hardship doctrine Remedies in costs and time |
id |
REVPUCP_c36f7d1881443b1bfa8d2bf6e8e931f6 |
---|---|
oai_identifier_str |
oai:revistaspuc:article/23253 |
network_acronym_str |
REVPUCP |
network_name_str |
Revistas - Pontificia Universidad Católica del Perú |
repository_id_str |
|
spelling |
Liabilities and remedies of the changed circumstances caused by the COVID-19 in construction projects around the worldPasivos y remedios por el cambio de circunstancias a causa del COVID-19 en los proyectos de construcción alrededor del mundoWei, HeLos efectos del COVID-19Proyectos de construcción en el mundoCambio de circunstanciasFuerza mayorDoctrina del hardshipRemedios en costo y en tiempoThe effect of COVID-19Construction projects in the worldChanged circumstancesForce MajeureHardship doctrineRemedies in costs and timeEssentially, the loss suffered by the global construction industry during the time when the COVID-19 is spread is not caused by that pandemic itself but caused by a changed circumstance which mainly resulted by anti-COVID-19 policy or law conducted by different jurisdictions. Where contract keeps silent in this regard, legal solution should be made by contemplating the law in different jurisdictions toward changed circumstances, which commonly includes situations where performance of contract become more onerous or impossible, and taking account of the factual environment which determines or impacts the changed circumstance. This paper, from a comparative law perspective, discusses and concludes the doctrine of changed circumstance in some typical jurisdictions, and, by taking consideration of law and fact, provides some approaches and potential legal solutions to deal with that loss.Esencialmente, la pérdida sufrida por la industria de la construcción global durante el tiempo en cual se propaga el COVID-19 no es causada por la pandemia en sí, sino por un cambio de circunstancias que resultó principalmente de la política o ley anti-COVID-19 llevada a cabo por diferentes jurisdicciones. Cuando el contrato guarda silencio al respecto, la solución legal debe hacerse contemplando la ley en diferentes jurisdicciones hacia el cambio de circunstancias, que comúnmente incluye situaciones en las que la ejecución del contrato se vuelve más onerosa o imposible, y teniendo en cuenta el entorno fáctico que determina o impacta la circunstancia cambiada. Este documento, desde una perspectiva de derecho comparado, analiza y concluye la doctrina del cambio de circunstancias en algunas jurisdicciones típicas que al tomar en consideración el derecho y los hechos, proporciona algunos enfoques y posibles soluciones legales para hacer frente a esa pérdida.Pontificia Universidad Católica del Perú2020-12-12info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttp://revistas.pucp.edu.pe/index.php/derechoysociedad/article/view/23253Derecho & Sociedad; Núm. 55 (2020): Derecho de la Construcción; 367-3822521-599X2079-3634reponame:Revistas - Pontificia Universidad Católica del Perúinstname:Pontificia Universidad Católica del Perúinstacron:PUCPenghttp://revistas.pucp.edu.pe/index.php/derechoysociedad/article/view/23253/22241http://creativecommons.org/licenses/by/4.0info:eu-repo/semantics/openAccessoai:revistaspuc:article/232532024-02-12T16:02:36Z |
dc.title.none.fl_str_mv |
Liabilities and remedies of the changed circumstances caused by the COVID-19 in construction projects around the world Pasivos y remedios por el cambio de circunstancias a causa del COVID-19 en los proyectos de construcción alrededor del mundo |
title |
Liabilities and remedies of the changed circumstances caused by the COVID-19 in construction projects around the world |
spellingShingle |
Liabilities and remedies of the changed circumstances caused by the COVID-19 in construction projects around the world Wei, He Los efectos del COVID-19 Proyectos de construcción en el mundo Cambio de circunstancias Fuerza mayor Doctrina del hardship Remedios en costo y en tiempo The effect of COVID-19 Construction projects in the world Changed circumstances Force Majeure Hardship doctrine Remedies in costs and time |
title_short |
Liabilities and remedies of the changed circumstances caused by the COVID-19 in construction projects around the world |
title_full |
Liabilities and remedies of the changed circumstances caused by the COVID-19 in construction projects around the world |
title_fullStr |
Liabilities and remedies of the changed circumstances caused by the COVID-19 in construction projects around the world |
title_full_unstemmed |
Liabilities and remedies of the changed circumstances caused by the COVID-19 in construction projects around the world |
title_sort |
Liabilities and remedies of the changed circumstances caused by the COVID-19 in construction projects around the world |
dc.creator.none.fl_str_mv |
Wei, He |
author |
Wei, He |
author_facet |
Wei, He |
author_role |
author |
dc.subject.none.fl_str_mv |
Los efectos del COVID-19 Proyectos de construcción en el mundo Cambio de circunstancias Fuerza mayor Doctrina del hardship Remedios en costo y en tiempo The effect of COVID-19 Construction projects in the world Changed circumstances Force Majeure Hardship doctrine Remedies in costs and time |
topic |
Los efectos del COVID-19 Proyectos de construcción en el mundo Cambio de circunstancias Fuerza mayor Doctrina del hardship Remedios en costo y en tiempo The effect of COVID-19 Construction projects in the world Changed circumstances Force Majeure Hardship doctrine Remedies in costs and time |
description |
Essentially, the loss suffered by the global construction industry during the time when the COVID-19 is spread is not caused by that pandemic itself but caused by a changed circumstance which mainly resulted by anti-COVID-19 policy or law conducted by different jurisdictions. Where contract keeps silent in this regard, legal solution should be made by contemplating the law in different jurisdictions toward changed circumstances, which commonly includes situations where performance of contract become more onerous or impossible, and taking account of the factual environment which determines or impacts the changed circumstance. This paper, from a comparative law perspective, discusses and concludes the doctrine of changed circumstance in some typical jurisdictions, and, by taking consideration of law and fact, provides some approaches and potential legal solutions to deal with that loss. |
publishDate |
2020 |
dc.date.none.fl_str_mv |
2020-12-12 |
dc.type.none.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.none.fl_str_mv |
http://revistas.pucp.edu.pe/index.php/derechoysociedad/article/view/23253 |
url |
http://revistas.pucp.edu.pe/index.php/derechoysociedad/article/view/23253 |
dc.language.none.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
http://revistas.pucp.edu.pe/index.php/derechoysociedad/article/view/23253/22241 |
dc.rights.none.fl_str_mv |
http://creativecommons.org/licenses/by/4.0 info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
http://creativecommons.org/licenses/by/4.0 |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
Pontificia Universidad Católica del Perú |
publisher.none.fl_str_mv |
Pontificia Universidad Católica del Perú |
dc.source.none.fl_str_mv |
Derecho & Sociedad; Núm. 55 (2020): Derecho de la Construcción; 367-382 2521-599X 2079-3634 reponame:Revistas - Pontificia Universidad Católica del Perú instname:Pontificia Universidad Católica del Perú instacron:PUCP |
instname_str |
Pontificia Universidad Católica del Perú |
instacron_str |
PUCP |
institution |
PUCP |
reponame_str |
Revistas - Pontificia Universidad Católica del Perú |
collection |
Revistas - Pontificia Universidad Católica del Perú |
repository.name.fl_str_mv |
|
repository.mail.fl_str_mv |
|
_version_ |
1840900422269665280 |
score |
12.851315 |
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).