Respuesta dinámica de un edificio instrumentado de concreto armado
Descripción del Articulo
The overall objective of this study is the analysis of the feasibility of using the ambient noise in determining the dynamic characteristics of existing structures, particularly in urban areas of low or moderate seismic activity but which nevertheless are not exempt from risk because of seismic acti...
| Autor: | |
|---|---|
| Formato: | tesis de maestría |
| Fecha de Publicación: | 2016 |
| Institución: | Consejo Nacional de Ciencia Tecnología e Innovación |
| Repositorio: | CONCYTEC-Institucional |
| Lenguaje: | español |
| OAI Identifier: | oai:repositorio.concytec.gob.pe:20.500.12390/2054 |
| Enlace del recurso: | https://hdl.handle.net/20.500.12390/2054 |
| Nivel de acceso: | acceso abierto |
| Materia: | Edificios Construcciones de concreto armado https://purl.org/pe-repo/ocde/ford#2.01.01 |
| id |
CONC_d441be2e6bdef1d5b99042e9a1df8b4a |
|---|---|
| oai_identifier_str |
oai:repositorio.concytec.gob.pe:20.500.12390/2054 |
| network_acronym_str |
CONC |
| network_name_str |
CONCYTEC-Institucional |
| repository_id_str |
4689 |
| dc.title.none.fl_str_mv |
Respuesta dinámica de un edificio instrumentado de concreto armado |
| title |
Respuesta dinámica de un edificio instrumentado de concreto armado |
| spellingShingle |
Respuesta dinámica de un edificio instrumentado de concreto armado Espinoza Poves, Danny Josué Edificios Construcciones de concreto armado https://purl.org/pe-repo/ocde/ford#2.01.01 |
| title_short |
Respuesta dinámica de un edificio instrumentado de concreto armado |
| title_full |
Respuesta dinámica de un edificio instrumentado de concreto armado |
| title_fullStr |
Respuesta dinámica de un edificio instrumentado de concreto armado |
| title_full_unstemmed |
Respuesta dinámica de un edificio instrumentado de concreto armado |
| title_sort |
Respuesta dinámica de un edificio instrumentado de concreto armado |
| author |
Espinoza Poves, Danny Josué |
| author_facet |
Espinoza Poves, Danny Josué |
| author_role |
author |
| dc.contributor.author.fl_str_mv |
Espinoza Poves, Danny Josué |
| dc.subject.none.fl_str_mv |
Edificios |
| topic |
Edificios Construcciones de concreto armado https://purl.org/pe-repo/ocde/ford#2.01.01 |
| dc.subject.es_PE.fl_str_mv |
Construcciones de concreto armado |
| dc.subject.ocde.none.fl_str_mv |
https://purl.org/pe-repo/ocde/ford#2.01.01 |
| description |
The overall objective of this study is the analysis of the feasibility of using the ambient noise in determining the dynamic characteristics of existing structures, particularly in urban areas of low or moderate seismic activity but which nevertheless are not exempt from risk because of seismic activity. Therefore, it is also an objective of this work to analyze the variation between a mathematical model and the structure once built, evaluating the data to design specific procedures to determine the variation in results of densely populated urban areas. This objective is accomplished through the following tasks: Knowledge and choice of instrumentation. Establishment of specific procedures tailored to the peculiarities of the buildings to be studied. Calibration of the estimation procedures of actual periods in real buildings their field measurement and numerical modeling. Proposal for a specific procedure for urban areas. Evaluation of the reliability and applicability of the empirical formulas in seismic standards and establishment of specific formulas for the cities of San Isidro and Miraflores. The necessary data for the study were obtained with field work, obtaining the records of environmental noise and measuring the height and number of levels of the buildings. Fundamental periods were identified from the Fourier spectra of accelerations at the roof levels of buildings. Uniformity was sought in the type and variability in the parameter to be adjusted. In this way it has been possible to find the fundamental parameters of the period in terms of the number of floors and height. It has been found that the formulas that best fit reinforced concrete buildings are those which relate the fundamental period with the number of floors. |
| publishDate |
2016 |
| dc.date.accessioned.none.fl_str_mv |
2024-05-30T23:13:38Z |
| dc.date.available.none.fl_str_mv |
2024-05-30T23:13:38Z |
| dc.date.issued.fl_str_mv |
2016 |
| dc.type.none.fl_str_mv |
info:eu-repo/semantics/masterThesis |
| format |
masterThesis |
| dc.identifier.uri.none.fl_str_mv |
https://hdl.handle.net/20.500.12390/2054 |
| url |
https://hdl.handle.net/20.500.12390/2054 |
| dc.language.iso.none.fl_str_mv |
spa |
| language |
spa |
| dc.rights.none.fl_str_mv |
info:eu-repo/semantics/openAccess |
| eu_rights_str_mv |
openAccess |
| dc.publisher.none.fl_str_mv |
Universidad Nacional de Ingeniería |
| publisher.none.fl_str_mv |
Universidad Nacional de Ingeniería |
| dc.source.none.fl_str_mv |
reponame:CONCYTEC-Institucional instname:Consejo Nacional de Ciencia Tecnología e Innovación instacron:CONCYTEC |
| instname_str |
Consejo Nacional de Ciencia Tecnología e Innovación |
| instacron_str |
CONCYTEC |
| institution |
CONCYTEC |
| reponame_str |
CONCYTEC-Institucional |
| collection |
CONCYTEC-Institucional |
| repository.name.fl_str_mv |
Repositorio Institucional CONCYTEC |
| repository.mail.fl_str_mv |
repositorio@concytec.gob.pe |
| _version_ |
1854395731081691136 |
| spelling |
Publicationrp05068600Espinoza Poves, Danny Josué2024-05-30T23:13:38Z2024-05-30T23:13:38Z2016https://hdl.handle.net/20.500.12390/2054The overall objective of this study is the analysis of the feasibility of using the ambient noise in determining the dynamic characteristics of existing structures, particularly in urban areas of low or moderate seismic activity but which nevertheless are not exempt from risk because of seismic activity. Therefore, it is also an objective of this work to analyze the variation between a mathematical model and the structure once built, evaluating the data to design specific procedures to determine the variation in results of densely populated urban areas. This objective is accomplished through the following tasks: Knowledge and choice of instrumentation. Establishment of specific procedures tailored to the peculiarities of the buildings to be studied. Calibration of the estimation procedures of actual periods in real buildings their field measurement and numerical modeling. Proposal for a specific procedure for urban areas. Evaluation of the reliability and applicability of the empirical formulas in seismic standards and establishment of specific formulas for the cities of San Isidro and Miraflores. The necessary data for the study were obtained with field work, obtaining the records of environmental noise and measuring the height and number of levels of the buildings. Fundamental periods were identified from the Fourier spectra of accelerations at the roof levels of buildings. Uniformity was sought in the type and variability in the parameter to be adjusted. In this way it has been possible to find the fundamental parameters of the period in terms of the number of floors and height. It has been found that the formulas that best fit reinforced concrete buildings are those which relate the fundamental period with the number of floors.Consejo Nacional de Ciencia, Tecnología e Innovación Tecnológica - ConcytecspaUniversidad Nacional de Ingenieríainfo:eu-repo/semantics/openAccessEdificiosConstrucciones de concreto armado-1https://purl.org/pe-repo/ocde/ford#2.01.01-1Respuesta dinámica de un edificio instrumentado de concreto armadoinfo:eu-repo/semantics/masterThesisreponame:CONCYTEC-Institucionalinstname:Consejo Nacional de Ciencia Tecnología e Innovacióninstacron:CONCYTEC#PLACEHOLDER_PARENT_METADATA_VALUE#20.500.12390/2054oai:repositorio.concytec.gob.pe:20.500.12390/20542024-05-30 15:41:40.401http://purl.org/coar/access_right/c_14cbinfo:eu-repo/semantics/closedAccessmetadata only accesshttps://repositorio.concytec.gob.peRepositorio Institucional CONCYTECrepositorio@concytec.gob.pe#PLACEHOLDER_PARENT_METADATA_VALUE#<Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="452fb9fd-232b-4d67-9939-f07b8ab5ef78"> <Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843</Type> <Language>spa</Language> <Title>Respuesta dinámica de un edificio instrumentado de concreto armado</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2016</PublicationDate> <Authors> <Author> <DisplayName>Espinoza Poves, Danny Josué</DisplayName> <Person id="rp05068" /> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Universidad Nacional de Ingeniería</DisplayName> <OrgUnit /> </Publisher> </Publishers> <Keyword>Edificios</Keyword> <Keyword>Construcciones de concreto armado</Keyword> <Abstract>The overall objective of this study is the analysis of the feasibility of using the ambient noise in determining the dynamic characteristics of existing structures, particularly in urban areas of low or moderate seismic activity but which nevertheless are not exempt from risk because of seismic activity. Therefore, it is also an objective of this work to analyze the variation between a mathematical model and the structure once built, evaluating the data to design specific procedures to determine the variation in results of densely populated urban areas. This objective is accomplished through the following tasks: Knowledge and choice of instrumentation. Establishment of specific procedures tailored to the peculiarities of the buildings to be studied. Calibration of the estimation procedures of actual periods in real buildings their field measurement and numerical modeling. Proposal for a specific procedure for urban areas. Evaluation of the reliability and applicability of the empirical formulas in seismic standards and establishment of specific formulas for the cities of San Isidro and Miraflores. The necessary data for the study were obtained with field work, obtaining the records of environmental noise and measuring the height and number of levels of the buildings. Fundamental periods were identified from the Fourier spectra of accelerations at the roof levels of buildings. Uniformity was sought in the type and variability in the parameter to be adjusted. In this way it has been possible to find the fundamental parameters of the period in terms of the number of floors and height. It has been found that the formulas that best fit reinforced concrete buildings are those which relate the fundamental period with the number of floors.</Abstract> <Access xmlns="http://purl.org/coar/access_right" > </Access> </Publication> -1 |
| score |
13.951113 |
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).