Optimization of the attention of OPEX and CAPEX projects through the implementation of an integrated project management system SIGPRO, in 2015.

Descripción del Articulo

The demand for development and execution of infrastructure projects in the Superintendency of Plant Engineering has increased over the years without the organizational structure or management methods have undergone substantial changes. The effectiveness of the implementation of an Integrated Project...

Descripción completa

Detalles Bibliográficos
Autor: Málaga Enciso, Erik Robin
Formato: artículo
Fecha de Publicación:2017
Institución:Universidad Privada de Tacna
Repositorio:Revista UPT - Veritas et Scientia
Lenguaje:español
OAI Identifier:oai:ojs2.172.30.101.191:article/201
Enlace del recurso:http://revistas.upt.edu.pe/ojs/index.php/vestsc/article/view/201
Nivel de acceso:acceso abierto
id 2617-0639_4dfa8447123bbcdbf5e810e44f1d3caf
oai_identifier_str oai:ojs2.172.30.101.191:article/201
network_acronym_str 2617-0639
repository_id_str
network_name_str Revista UPT - Veritas et Scientia
spelling Optimization of the attention of OPEX and CAPEX projects through the implementation of an integrated project management system SIGPRO, in 2015.Optimización de la atención de proyectos OPEX y CAPEX a través de la implementación de un sistema integrado de gestión de proyectos SIGPRO, en el año 2015.Málaga Enciso, Erik RobinThe demand for development and execution of infrastructure projects in the Superintendency of Plant Engineering has increased over the years without the organizational structure or management methods have undergone substantial changes. The effectiveness of the implementation of an Integrated Project Management System in the Planning and Technical Services Management that optimized the attention of Opex projects and the Southern Peru Copper Corporation was measured. Methodology: Experimental operational research in the field of project management. Results: The project management model of Cuajone Plant Engineering allows the agilization in the attention of the same under the methodological approach of the PMI (Project ManagementInstitute). lt is possible to cover Project Management and Document Management allowing to improve efficiency from the reduction of time and costs to the fulfillment of the scope of the same. Conclusion: The implementation of the SIGPRO management system in 2015 in the area of Cuajone Plant Engineering generates the greatest variation in project attention compared to the last 14 years, resulting in a total variation of US $ 18,130,000 representing an increase of 78.32% compared to 2014. In addition, the highest project attention was recorded in 2015, with a total of US $ 41,200,000.La demande de desarrollo y ejecución de proyectos de infraestructura en la Superintendencia de Ingeniería de Planta se ha incrementado a lo largo de los años sin que la estructura organizacional ni los métodos de gestión hayan tenido cambios sustanciales. Se midió la eficacia de la implementación de un Sistema Integrado de Gestión de Proyectos en la Gerencia de Planeación y Servicios Técnicos que optimice la atención de proyectos Opex y en la empresa Southern Perú Copper Corporation. Investigación operativa experimental en el campo de gestión de proyectos. El modelo de Gestión de Proyectos de Ingeniería de Planta Cuajone permite la agilización en la atención de los mismos bajo el enfoque metodológico del PMI (Project Management Institute). Se logra abarcar la Gestión de Proyectos y la Gestión Documentaria permitiendo mejorar la eficiencia desde la reducción de tiempo y costos hasta el cumplimiento de los alcances de los mismos. La implementación del sistema de gestión SIGPRO en el año 2015 en el área de Ingeniería de Planta Cuajone genera la mayor variación en la atención de proyectos comparada con los últimos 14 años registrados, obteniéndose una variación total de US$18,130,000 que representa un incremento del 78.32% respecto al año 2014. Además en el año 2015 se registra la atención de proyectos más elevada, con un total de US$41,200,000Universidad Privada de Tacna2017-07-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttp://revistas.upt.edu.pe/ojs/index.php/vestsc/article/view/20110.47796/ves.v6i1.201REVISTA VERITAS ET SCIENTIA - UPT; Vol. 6 Núm. 1 (2017): Veritas et Scientia; pp. 613 -618JOURNAL VERITAS ET SCIENTIA - UPT; Vol 6 No 1 (2017): Veritas et Scientia; pp. 613 -6182617-06392307-513910.47796/ves.v6i1reponame:Revista UPT - Veritas et Scientiainstname:Universidad Privada de Tacnainstacron:UPTspahttp://revistas.upt.edu.pe/ojs/index.php/vestsc/article/view/201/185Derechos de autor 2017 Erik Robin Málaga Encisohttp://creativecommons.org/licenses/by/4.0info:eu-repo/semantics/openAccess2021-06-04T16:25:14Zmail@mail.com -
dc.title.none.fl_str_mv Optimization of the attention of OPEX and CAPEX projects through the implementation of an integrated project management system SIGPRO, in 2015.
Optimización de la atención de proyectos OPEX y CAPEX a través de la implementación de un sistema integrado de gestión de proyectos SIGPRO, en el año 2015.
title Optimization of the attention of OPEX and CAPEX projects through the implementation of an integrated project management system SIGPRO, in 2015.
spellingShingle Optimization of the attention of OPEX and CAPEX projects through the implementation of an integrated project management system SIGPRO, in 2015.
Málaga Enciso, Erik Robin
title_short Optimization of the attention of OPEX and CAPEX projects through the implementation of an integrated project management system SIGPRO, in 2015.
title_full Optimization of the attention of OPEX and CAPEX projects through the implementation of an integrated project management system SIGPRO, in 2015.
title_fullStr Optimization of the attention of OPEX and CAPEX projects through the implementation of an integrated project management system SIGPRO, in 2015.
title_full_unstemmed Optimization of the attention of OPEX and CAPEX projects through the implementation of an integrated project management system SIGPRO, in 2015.
title_sort Optimization of the attention of OPEX and CAPEX projects through the implementation of an integrated project management system SIGPRO, in 2015.
dc.creator.none.fl_str_mv Málaga Enciso, Erik Robin
author Málaga Enciso, Erik Robin
author_facet Málaga Enciso, Erik Robin
author_role author
dc.description.none.fl_txt_mv The demand for development and execution of infrastructure projects in the Superintendency of Plant Engineering has increased over the years without the organizational structure or management methods have undergone substantial changes. The effectiveness of the implementation of an Integrated Project Management System in the Planning and Technical Services Management that optimized the attention of Opex projects and the Southern Peru Copper Corporation was measured. Methodology: Experimental operational research in the field of project management. Results: The project management model of Cuajone Plant Engineering allows the agilization in the attention of the same under the methodological approach of the PMI (Project ManagementInstitute). lt is possible to cover Project Management and Document Management allowing to improve efficiency from the reduction of time and costs to the fulfillment of the scope of the same. Conclusion: The implementation of the SIGPRO management system in 2015 in the area of Cuajone Plant Engineering generates the greatest variation in project attention compared to the last 14 years, resulting in a total variation of US $ 18,130,000 representing an increase of 78.32% compared to 2014. In addition, the highest project attention was recorded in 2015, with a total of US $ 41,200,000.
La demande de desarrollo y ejecución de proyectos de infraestructura en la Superintendencia de Ingeniería de Planta se ha incrementado a lo largo de los años sin que la estructura organizacional ni los métodos de gestión hayan tenido cambios sustanciales. Se midió la eficacia de la implementación de un Sistema Integrado de Gestión de Proyectos en la Gerencia de Planeación y Servicios Técnicos que optimice la atención de proyectos Opex y en la empresa Southern Perú Copper Corporation. Investigación operativa experimental en el campo de gestión de proyectos. El modelo de Gestión de Proyectos de Ingeniería de Planta Cuajone permite la agilización en la atención de los mismos bajo el enfoque metodológico del PMI (Project Management Institute). Se logra abarcar la Gestión de Proyectos y la Gestión Documentaria permitiendo mejorar la eficiencia desde la reducción de tiempo y costos hasta el cumplimiento de los alcances de los mismos. La implementación del sistema de gestión SIGPRO en el año 2015 en el área de Ingeniería de Planta Cuajone genera la mayor variación en la atención de proyectos comparada con los últimos 14 años registrados, obteniéndose una variación total de US$18,130,000 que representa un incremento del 78.32% respecto al año 2014. Además en el año 2015 se registra la atención de proyectos más elevada, con un total de US$41,200,000
description The demand for development and execution of infrastructure projects in the Superintendency of Plant Engineering has increased over the years without the organizational structure or management methods have undergone substantial changes. The effectiveness of the implementation of an Integrated Project Management System in the Planning and Technical Services Management that optimized the attention of Opex projects and the Southern Peru Copper Corporation was measured. Methodology: Experimental operational research in the field of project management. Results: The project management model of Cuajone Plant Engineering allows the agilization in the attention of the same under the methodological approach of the PMI (Project ManagementInstitute). lt is possible to cover Project Management and Document Management allowing to improve efficiency from the reduction of time and costs to the fulfillment of the scope of the same. Conclusion: The implementation of the SIGPRO management system in 2015 in the area of Cuajone Plant Engineering generates the greatest variation in project attention compared to the last 14 years, resulting in a total variation of US $ 18,130,000 representing an increase of 78.32% compared to 2014. In addition, the highest project attention was recorded in 2015, with a total of US $ 41,200,000.
publishDate 2017
dc.date.none.fl_str_mv 2017-07-01
dc.type.none.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.none.fl_str_mv http://revistas.upt.edu.pe/ojs/index.php/vestsc/article/view/201
10.47796/ves.v6i1.201
url http://revistas.upt.edu.pe/ojs/index.php/vestsc/article/view/201
identifier_str_mv 10.47796/ves.v6i1.201
dc.language.none.fl_str_mv spa
language spa
dc.relation.none.fl_str_mv http://revistas.upt.edu.pe/ojs/index.php/vestsc/article/view/201/185
dc.rights.none.fl_str_mv Derechos de autor 2017 Erik Robin Málaga Enciso
http://creativecommons.org/licenses/by/4.0
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Derechos de autor 2017 Erik Robin Málaga Enciso
http://creativecommons.org/licenses/by/4.0
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidad Privada de Tacna
publisher.none.fl_str_mv Universidad Privada de Tacna
dc.source.none.fl_str_mv REVISTA VERITAS ET SCIENTIA - UPT; Vol. 6 Núm. 1 (2017): Veritas et Scientia; pp. 613 -618
JOURNAL VERITAS ET SCIENTIA - UPT; Vol 6 No 1 (2017): Veritas et Scientia; pp. 613 -618
2617-0639
2307-5139
10.47796/ves.v6i1
reponame:Revista UPT - Veritas et Scientia
instname:Universidad Privada de Tacna
instacron:UPT
reponame_str Revista UPT - Veritas et Scientia
collection Revista UPT - Veritas et Scientia
instname_str Universidad Privada de Tacna
instacron_str UPT
institution UPT
repository.name.fl_str_mv -
repository.mail.fl_str_mv mail@mail.com
_version_ 1701654247995604992
score 13.754011
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).